Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Heacock Street South Extension Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Heacock Street South Extension Project, identified as City Project No. 8010010, involves the widening and realignment of Heacock Street in Moreno Valley, California, between San Michele Road and the Perris Valley Storm Drainage Lateral B channel. The project aims to extend the roadway's arterial classification south to the city limits, expanding the road to a total width of 76 feet. The project site encompasses 15 acres, with 11.91 acres designated for permanent new roadway and infrastructure improvements, including storm drain enhancements, while 2.89 acres of existing roadway will be subject to temporary disturbance. The improvements will conclude in a cul-de-sac located north of the channel. Environmental compliance is a central component of the project, with an Initial Study and Mitigated Negative Declaration concluding that all significant impacts will be mitigated. Comprehensive evaluations have been conducted regarding air quality, biological resources, noise, vibration, and transportation, with a focused study indicating acceptable levels of service and vehicle miles traveled for the year 2030. Cultural resource surveys indicate no historical resources within the study area, though consultations with Native American groups, specifically the Pechanga Band of Indians, are required. Project execution requires adherence to City Standards for Arterial Streets and compliance with the National Pollutant Discharge Elimination System permit and the Riverside County Water Quality Management Plan. Monitoring requirements include weekly site inspections by a qualified monitor and the submission of cultural resource monitoring reports to the Community Development Department.

General Info

Widen and realign Heacock Street to 76 feet, extend arterial class, upgrade storm drainage, complete by July 29, 2026.

Agency

California → City of Moreno Valley

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

San Michele Road, Moreno Valley, CA, 92553

Set-Aside

NONE

Documents

(9)

Appendix A Air Quality and Greenhouse Gas Modeling Data

PDFappendix

Appendix C Cultural Resources Survey Report - Heacock Street South Extension Project

PDFcultural-resources-survey

ISMND Heacock Street South Extension Project July 2026

PDFmitigated-negative-declaration

Appendix B Biological Resource Evaluation for Heacock Street South Extension Project

PDFother

Heacock Street South Extension Project Summary Form

PDFsummary-form

NOI for Heacock Street South Extension Project - Moreno Valley

PDFnotice-of-intent

NOC Form - Heacock Street South Extension Project

PDFnoc-form

Appendix D Noise and Vibration Modeling Calculations

PDFsow

Appendix E: Focused Transportation Study for Heacock Street South Extension

PDFstudy-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Moreno Valley
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Moreno Valley
Office AddressN/A
Contacts
Quang NguyenPrincipal Engineer
Jennifer KelleyProject Manager

Interested Companies (1)

Show more
PlaceWorks
Santa Ana, CA

Full Description

Show more
The proposed project would widen and realign Heacock Street in Moreno Valley between San Michele Road and the Perris Valley Storm Drainage Lateral “B” (channel) to a total width of 76 feet. The project proposes to extend Heacock Street’s Arterial classification south from San Michele to the Ccity limits. The project site is a total of 15 acres. Under the proposed project, 11.91 acres of the total 15-acre project site would be disturbed under the proposed project, this would include permanent new roadway and infrastructure improvements. The remaining 2.89 acres of the existing roadway would be temporarily disturbed. Heacock Street improvements would terminate in a cul-de-sac adjacent to and north of the channel. Storm drain improvements are also proposed in the project impact area and are included in the 11.91 acres of disturbance.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Peninsula Avenue And Delaware Street Traffic Signal Modification Project
Solicitation # 46R031
The Peninsula Avenue and Delaware Street Traffic Signal Modification Project (Project No. 46R031) is a public works solicitation issued by the City of San Mateo, California. The project involves modifying the street lighting system to ensure full functionality and operational capacity, with a scope of work that includes mobilization, temporary traffic and pedestrian control, asphalt paving and base removal, and the installation of various concrete structures, pavement markings, and electrical components. The estimated construction cost is 533,325 dollars, and the project must be completed within 45 working days. Bids are due by 2:00 p.m. on October 15, 2026, and must be submitted as sealed bids to the City Clerk. The contract will be awarded to the lowest responsive and responsible bidder who possesses a Class A contractor's license and the necessary capacity to perform the work. Award criteria include the bidder's experience, the quality of previous work and materials, and the ability to meet the project timeline. Requirements for the winning contractor include providing a bid bond of at least 10 percent of the aggregate bid, as well as performance and payment bonds equal to the full contract price. Additionally, the contractor must comply with California Prevailing Wage Law, ADA accessibility standards, and provide a one-year warranty against latent faults or defective materials. All work must adhere to the 2018 Caltrans Standard Plans and the April 15, 2022, Caltrans Revised Standard Specifications.
CITY OF SAN MATEO, CALIFORNIA

POSTED

about 11 hours ago

DEADLINE

in 24 days
View Details
NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 11 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS