Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Transportation was posted on June 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Headquarters Building (HQB) Mechanical and Electrical Upgrades at the Mike Monroney Aeronautical Center (MMAC), Oklahoma City, OK.

Closed
6973GH-26-R-00082Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
BEQ- Sanitize & Paint Rooms, B4167, Multi Rooms, MASS1, Station
Solicitation # N400857607511
Solicitation N400857607511 is a task order under MACC contract N4008525D for the remediation, preparation, and painting of 22 barracks rooms and associated bathrooms at MCAS Cherry Point, North Carolina. The contractor is responsible for providing all labor, supplies, and equipment to eradicate active microbial growth using EPA-registered disinfectants and antimicrobial solutions. The scope of work includes preparing approximately 18,562 square feet of barracks room surfaces and 3,840 square feet of bathroom surfaces by removing failed paint and applying a heavy-duty, mold-and-mildew-resistant sealing primer. Final finishing requires a minimum of two coats of specialized mold/mildew-resistant paint that matches the existing color and sheen, ensuring a uniform finish without visible patching or roller marks. The project is estimated between 25,000 and 100,000 dollars, with the award based on the lowest price. All work must be completed within 60 calendar days of the award. Proposals were due by September 16, 2026, and must include a completed price proposal form and a list of subcontractors. Bonding requirements vary by proposal value, with payment bonds required for projects between 35,000 and 150,000 dollars. The contractor must comply with the Buy American Act, the Davis-Bacon Act, and FAR 28.307-2 liability insurance requirements. A qualified Quality Control Manager is required to oversee project standards, and all site cleanup must be completed to return the area to its original condition prior to final acceptance by the Contracting Officer's Representative.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 4 days
NAICS: 236220
New
SLED
DB Construction for HC-130J Flight Simulator Facility at USCG Elizabeth City, NC
Solicitation # 32000479
This design-build project involves the construction of a full motion Weapons System Trainer flight simulator facility for C-130J aircraft at USCG Base Elizabeth City, North Carolina. The approximately 13,000 gross square foot facility will include a simulator bay for a Government Furnish, Government Installed mobile simulator, classrooms, administrative offices, debriefing spaces, and essential support areas for mechanical, electrical, and telecommunications systems. The scope of work extends to site development, including the installation of sidewalks and landscaping, while utilizing existing parking areas. A critical technical requirement is the integration of a Siemens Building Automation System to ensure compatibility with existing installation-wide systems. Issued under the DHS National Multiple Award Construction Contract III, Pool Two, the project has a magnitude estimate of approximately 16 million dollars and a performance period of 719 calendar days. The award is based on a best-value tradeoff selection, weighing price against non-price factors such as planning, organization, communication, and the contractor's specific experience with military or commercial flight simulators. Strict security and compliance protocols are in place, requiring all on-site personnel to be US citizens and necessitating adherence to Davis-Bacon wage determinations, Buy American requirements, and various environmental and historic preservation consultations.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 12 days
NAICS: 236220
New
SLED
CP2713M Replace Runway Switches
Solicitation # N400857563909
Solicitation N400857563909 is a task order for the replacement of runway switches at Marine Corps Air Station Cherry Point in Havelock, North Carolina. The scope of work involves the demolition of four existing 15KV S&C pad-mounted air switches and the installation of new S&C pad-mounted SF6 switches on new concrete box pads. Additionally, the contractor must replace existing tee splices in adjacent manholes with dead front junctions in above-ground junction box enclosures. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion period of 240 calendar days after the award. The contract will be awarded based on the lowest price. Proposals are due by 1200 local time on September 17, 2026. Key requirements include adherence to the Buy American Act, Davis-Bacon Act wage determinations, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. The contractor is responsible for providing a QC Manager to oversee acceptance checks and tests in accordance with NFPA 70B, NETA ATS, and ANSI standards. Invoicing is processed via Wide-Area Workflow using NAVFAC forms, and the contractor must comply with specific cybersecurity and safety regulations, including the provision of an Accident Prevention Plan and Activity Hazard Analysis.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 5 days
NAICS: 236220
New
SLED
Upgrade Life Health Safety Systems in Hangar 250
Solicitation # N400857190530
Solicitation N400857190530 involves upgrading the life health safety systems within Hangar 250 at MCAS Cherry Point, North Carolina. The scope of work includes architectural improvements, modifications to fire alarm and fire protection systems, and the rerouting of plumbing and electrical systems. Because the work will be performed in an occupied facility, the contractor must coordinate closely with base operations and adhere to strict safety and security requirements. The project is estimated to be valued between 1,000,000 and 5,000,000 dollars, with a required completion timeframe of 380 calendar days after the award. The contract will be awarded based on the lowest price, and proposals are due by September 21, 2026. Key requirements include compliance with the Buy American Act, the Davis-Bacon Act, and specific bonding requirements for proposals exceeding 150,000 dollars, which include bid, payment, and performance bonds. Deliverables consist of a facility operating plan, comprehensive data packages for system maintenance, and functional performance test reports. Invoicing is managed through the Wide Area WorkFlow system, and the contractor must submit a detailed schedule of prices within 15 calendar days of the award. Quality control is paramount, requiring the submission and acceptance of a Contractor QC Plan before construction begins.
Bristol Alliance of Companies

POSTED

about 10 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
Education & Training Resources is soliciting bids for a fee-for-service subcontract to perform comprehensive bathroom renovations at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the complete renovation of four bathroom areas in Building 17, totaling approximately 944 square feet, and five bathroom areas in Building 18, totaling approximately 1,260 square feet. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic or FRP shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED lighting. To maintain center operations, contractors must execute the renovations in a phased sequence, completing one dormitory at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a detailed bid sheet with a cost breakdown separating materials and labor, a project schedule specifying calendar days and working hours, current Vermont state professional licensing, and certificates of insurance. The winning bidder must maintain an active registration in Sam.gov with a Unique Entity ID. Award selection is based on technical alignment with the scope of work and risk mitigation rather than the lowest bid. The contract requires strict adherence to ADA, OSHA, and NFPA 101 Life Safety codes, as well as compliance with the Davis-Bacon Act and various FAR clauses, including 100 percent performance and payment bonds. Payment terms are net 30 days upon receipt of a proper invoice and final project acceptance, which requires a signed punch list and applicable warranties.
Northlands Job Corps Center /ETR

POSTED

about 10 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The contract solicitation 6973GH-26-R-00082 seeks proposals for the mechanical and electrical systems upgrade of the Headquarters Building at the Mike Monroney Aeronautical Center in Oklahoma City, Oklahoma, with an estimated value of $25 million. The scope requires the contractor to furnish all labor, materials, equipment, and supplies to complete construction, alteration, and repair work in strict compliance with the project manual, drawings, and specifications issued as Attachments 1 through 16, including detailed design analysis, construction safety protocols, Davis Bacon wage determinations, and performance and payment bonds. The solicitation mandates adherence to interim revisions of AMS clauses effective April 2026 covering small business subcontracting plans, implementation of Executive Order 14398, and changes to construction-related tasks, alongside revised minimum offer acceptance periods and site condition responsibilities. Contractors must perform at least 15% of the work using their own organization and complete the entire project within 365 days of receiving the notice to proceed, commencing work within 10 calendar days thereafter. The building will remain partially occupied during performance, necessitating measures to avoid operational disruption, maintain safe egress, and comply with asbestos abatement procedures if friable CAFCO ceilings are disturbed. Proposals must be structured into four separate electronic volumes—Contract Documentation, Technical Proposal (limited to 25 pages), Relevant Experience and Past Performance, and Cost/Price Proposal—with strict separation of cost information from technical and experience submissions. Offerors must include mandatory attachments such as the Business Relationship Affidavit and Anti-Collusion Affidavit, certify SAM registration with a valid Unique Entity Identifier, and affirm their ability to use the FAA’s Delphi electronic invoicing portal. Evaluation will be conducted on a best value basis using performance-price trade-off procedures, with technical acceptability and past performance eligibility serving as pass/fail gates—only offerors achieving High, Moderate, or Satisfactory Confidence ratings in past performance will remain eligible. Award will consider the balance between price and past performance, while failure to comply with submission formats, complete all Section B items, or meet certification requirements will lead to elimination. Contract administration is overseen by Cynthia Cooper, and all payments will be processed monthly via electronic invoicing under fixed-price construction terms, with performance and payment bonds required at 100% of the contract value. Contractors must adhere to FAA, DOT, and MMAC security directives, including prohibitions on unescorted

General Info

FAA contract for mechanical and electrical upgrades at MMAC, $18-25M, strict security and compliance.

Agency

Department Of Transportation → 6973GH Franchise Acquisition SvcsView Agency

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

Oklahoma City, OK, 73145, USA

Set-Aside

NONE

Documents

(35)

Addendum 03 to Specifications and Plans

PDFamendment

Amendment 0003 Addendum 02 for FAA Mike Monroney Aeronautical Center Mechanical and Electrical Upgrades

PDFamendment

Amendment 0005 to Solicitation 6973GH-26-R-00082

PDFamendment

FAA Headquarters Building Mechanical and Electrical Upgrades 100% CD Drawings

PDFspecifications

Solicitation 6973GH-26-R-00082/0004 Construction Mechanical and Electrical Upgrades

PDFifb

Amendment 0007 to Solicitation 6973GH-26-R-00082

PDFamendment

Amendment 0001 to Solicitation 6973GH-26-R-00082 with Updated Clauses

PDFamendment

Amendment 0003 Attachment 3 - Asbestos Abatement Information

PDFsow

Attachment 14 Major Cost Element Breakdown

XLSXcost-estimate

Amendment 0003 to Solicitation 6973GH-26-R-00082

PDFamendment

Amendment 0002 to Solicitation 6973GH-26-R-00082

PDFamendment

Addendum+01+Full+Document.pdf

PDF

Solicitation 6973GH-26-R-00082 Mechanical and Electrical Systems Upgrade

PDFrfp

OCAT 00310 Anti-Non-Collusion Affidavit

PDFaffidavit

Wage Determination OK20260049 for Oklahoma County Building Construction

PDFwage-determination

HQ Building Mechanical and Electrical Upgrades Site Visit Sign-In Sheet

PDFsite-visit-sign-in

ATTACHMENT+2+HQB+MEP+UPGRADES_100+CD_DESIGN+ANALYSIS.pdf

PDF

Attachment 1 Section B Supplies or Services Prices

XLSXsection-b-prices

6973GH-26-R-00081 Amendment 0003 QA Log for HQ Mechanical and Electrical Upgrades

PDFq-and-a

OCAT 00320 Business Relationship Affidavit

PDFbusiness-relationship-affidavit

Amendment 0003 Attachment 4 HQB Furniture Information

PDFspecifications

Amendment 0003 Attachment 5 HQB Requested Photos

PDFamendment

FAA HQB MEP Upgrades Project Manual 2025-02-20

PDFproject-manual

Department of Transportation Contractor's Release Form

PDFcontractor-release

HQ Mechanical and Electrical Upgrades Amendment 0004 Q&A Log

PDFamendment

Amendment 0003 Attachment 1 QA Log for Solicitation 6973GH-26-R-00081

PDFamendment

Past Performance Survey for Contractor Evaluation

DOCXpast-performance

Amendment 0006 to Solicitation 6973GH-26-R-00082

PDFamendment

FAA Client Authorization Letter for SIR/RFO No. 6973GH-26-R-00082

PDFclient-authorization-letter

AMP400-ENV-OC Operational Control Documents for Construction Contractors

PDFoperational-control-document

Past Performance Experience Information Form

DOCXpast-performance

Amendment 0004 to Solicitation - Correction and Extension

PDFamendment

Attachment+8++Performance+Bond.pdf

PDF

Attachment 5 Chapter 33 Construction Safety Program

PDFsow

Payment Bond Form for Construction Contract

PDFpayment-bond

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

7 updates
PhaseClosed
Posted

Combined Synopsis

Amendment 1

Contract was updated

Amendment 2

Contract was updated

Amendment 3

Contract was updated

Amendment 4

Contract was updated

Amendment 5

Contract was updated

Amendment 6

Contract was updated

Amendment 7

Contract was updated

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 6973GH Franchise Acquisition Svcs
Contacts1 person available
OfficeOKLAHOMA CITY, OK, 73125, USA
Organization / Agency
Department Of Transportation → 6973GH Franchise Acquisition Svcs
View Agency Profile
Office AddressOKLAHOMA CITY, OK, 73125, USA

Full Description

Show more

SIR 6973GH-26-R-00082 and Attachments 1 through 16 are provided for potential offerors


Amendment 0001 is hereby issued to to provide the Site Visit Attendees, provide Addendum 01 to the Specifications and Drawings included with this SIR, incorporate new AMS Clause 3.6.2-50, Implementation of E.O. 14398(INTERIM April 2026) and incorporate revised AMS Clauses 3.6.1-4 Small Business Subcontracting Plans (INTERIM April 2026) and 3.10.1-15, Changes-Construction, Dismantling, Demolition, or Removal of Improvements (INTERIM April 2026), revise the Minimum Offer Acceptance Period on Page 1, Block 11 of the SIR and AMS Clause 3.2.2.3-2, Minimum Offer Acceptance Period, revise the date for submission of Questions and extend the closing date of the SIR.


Amendment 0002 is hereby issued to revise Provision M.3 RELEVANT EXPERIENCE AND PAST
PERFORMANCE EVALUATION (REVISED MAY 15, 2026).


Amendment 0003 is hereby issued to incorporate Amendment 0003, Attachment 1 - Questions and Answers, Attachment 2 - Addendum 02, Attachment 3 - Asbestos Abatement Information, Attachment 4 - HQB Furniture Information, and Attachment 5 - HQB Requested Photos.


Amendment 0004 is hereby issued to remove Pages 1 and 2 of the Original SIR, Solicitation, Offer and Award, and incorporate New Pages 1 and 2, Solicitation, Offer and Award (Construction, Alteration, or Repair) attached.  In addition, Amendment 0004 provides New Questions and Answers 160 through 165 (attached), establishes a firm cut-off date for submission of questions and extends the proposal due date to June 5, 2026.  NOTE:  OFFERORS ARE TO SUBMIT NEWLY INCORPORATED PAGES 1 AND 2, SOLICITATION, OFFER AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR) WITH THEIR PROPOSAL. 


Amendment 0005 is hereby issued to extend the proposal due date to June 10, 2026. 


Amendment 0006 is hereby issued to provide Questions and Answers 1 through 192, including new Questions and Answers 166 through 192.  The proposal due date remains June 10, 2026.


Amendment 0007 is hereby issued to incorporate Addendum 03, HQB Mechanical and Electrical Upgrades – SIR - 6973GH-26-R-00082, dated June 5, 2026.

More opportunities from Department Of Transportation → 6973GH Franchise Acquisition Svcs

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS