Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on October 31, 2023. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Heat Recovery Project Development - Categories 1 ,2 & 4

Closed
PON 5547 -1State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
International
Field coordinator services
Solicitation # RFP 25048
The British Columbia Hydro and Power Authority (BC Hydro) is soliciting proposals under RFP 25048 for Field Coordinator Services to support the installation of new substation and generation equipment, station one-line updates, and substation capital projects within the Lower Mainland and Bridge River region. The selected consultant will provide an expert in electric utility commissioning procedures responsible for verifying that all required tests are performed and signing the Construction Notification of Energization (CNE) to confirm equipment is ready for initial energization. The contract is expected to run from approximately December 2026 to December 2028, with an optional one-year extension for a total duration of three years. Compensation is based on time spent by personnel, and all invoicing must be processed through the Ariba system with a 30-day payment term. Proposals must be submitted by November 16, 2026, via the BC Bid e-service or physical delivery to the Burnaby, BC bid station. Evaluation is based on the highest weighting of criteria, including mandatory compliance with the Freedom of Information and Protection of Privacy Act (FOIPPA). Proponents must provide comprehensive documentation, including health, safety, and cybersecurity questionnaires, as well as relationship disclosure statements. Key requirements include strict adherence to environmental packaging standards, such as the use of PVC-free and recyclable materials, and the assignment of qualified personnel who cannot be changed without prior approval from BC Hydro. The award process allows BC Hydro to reject any proposal that presents a material risk regarding financial resources, safety records, or cybersecurity.
British Columbia Hydro and Power Authority

POSTED

1 day ago

DEADLINE

in 23 days
NAICS: 541330
New
International
Village of Valemount Engineering for Accessiblity Impromvements at Cranberry Marsh
Solicitation # 2480-95-26
The Village of Valemount is seeking proposals under solicitation 2480-95-26 for engineering services to implement accessibility improvements at the Cranberry Marsh Boardwalk in British Columbia. The objective is to develop a shovel-ready planning package that includes a preferred concept plan, concept design drawings, and a Class C cost estimate. Additionally, the selected proponent must provide documentation and recommendations to support future grant applications, specifically for SHORE Stream 2. The total available budget for this project is up to 55,000 dollars, excluding GST, which must cover all professional fees, travel, and disbursements. The project must be completed by April 30, 2027, with a start date to be negotiated. All work must strictly adhere to the DWB Environmental Management Plan, requiring a qualified Environmental Monitor for sensitive phases and ensuring machinery is clean and leak-free to protect the wetland. Technical specifications require compliance with CAN/CSA-56-06 for design, CSA164 for galvanizing, and CSA G40.21M for structural steel. Proponents must submit a fixed-fee budget by phase, a work program, and a letter of introduction. This process is a request for proposals rather than a formal tender, and the Village reserves the right to negotiate a separate contract independently of the RFP process.
Village of Valemount

POSTED

1 day ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The Heat Recovery Project Development program, managed by NYSERDA, provides cost-share funding to increase the deployment of technologies that capture and reuse rejected heat in existing New York State buildings. Eligible properties include commercial, industrial, institutional, manufacturing, and multifamily buildings. The program is divided into four categories, focusing on the assessment of heat recovery opportunities, the design of cost-effective reuse approaches, innovative demonstrations, and manufacturer growth initiatives. Total funding has been increased to 27 million dollars, with specific provisions for projects in disadvantaged communities or affordable multifamily housing. Recent modifications have expanded eligibility to include all New York State properties regardless of whether they pay the System Benefits Charge, although certain funding sources remain restricted to those who do. Category 3 projects now require a cost-share contribution from the project team, ranging from 25 percent for disadvantaged communities to 50 percent for all other projects, with a maximum award of 2 million dollars per project. Application processes have transitioned to JotForm, and specific requirements for innovative heat recovery designs and collaborative design charrettes have been implemented. Round 2 proposals for Category 3 are due by June 3, 2025, while the general response deadline is November 17, 2025.

General Info

NYSERDA provides 27 million dollars for heat recovery technology in New York buildings.

Place of Performance

Existing buildings in New York State, All NYS counties, NY, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → Nyserda
Contacts4 people available
OfficeN/A
Organization / AgencyNew York → Nyserda
Office AddressN/A
Contacts
Lauren De La FuenteProject Manager
Lauren De La FuenteProject Manager
Nancy MarucciAssistant Contract Manager
Jillina BaxterOffice Manager

Full Description

Show more
Description of goods to services to be bid: Modification 3, February 2025: A modification (substantive change) to the Heat Recovery Project Development PON 5547 to: 1) Add $4,500,000 of RGGI funding; Page 6 of Program Summary, under Eligible Buildings header:• Remove: “Participating buildings must be located in New York State, served by a New York State Investor-Owned Electric Utility (such as Consolidated Edison, National Grid, NYSEG, Orange and Rockland, Central Hudson, or RG&E), and pay electric System Benefits Charges (SBC). An existing Property of any size that falls under the classification of commercial, industrial, institutional, manufacturing and/or multifamily is eligible. New construction projects and single-family buildings are not eligible for this Program,” • Add: “An existing Property of any size that is located in New York State and that falls under the classification of commercial, industrial, institutional, manufacturing and/or multifamily is eligible. New construction projects and single-family buildings are not eligible for this Program. This solicitation has funding to support Projects statewide, including end-use Customers who pay the System Benefits Charge (SBC) and end-use Customers who do not pay the System Benefits Charge. Clean Energy Fund (CEF) funding can only be awarded to Projects that serve end-use Customers who pay the SBC on either a portion of or on their entire electric bill at the Property.” 2) Page 1 of Program Summary, update funding from $12,000,000 to $27,000,000. 3) Set the Round 2 due date, Page 1 of Program Summary, under Category 3:Add: “Round 2 Proposals due June 3, 2025 by 3:00 PM ET. 4) Pages 2, 19, 20 of Program Summary where application instructions for Categories 1,2,4 are given:• Replace “SeamlessDocs” with “JotForm”• Replace the hyperlink “https://nyserda.seamlessdocs.com/f/HeatRecovery” with “https://nyserda.jotform.com/team/operations/HeatRecovery” 5) Add a cost-share minimum from Project Teams for Category 3:Page 2 of Program Summary, Funding table:• Remove “Not specified, see Proposal Evaluation Criteria”• Add “Up to 50% OR Up to 75% for Projects located in disadvantaged Communities or consisting of Affordable Multifamily Housing”Page 10 of Program Summary, Category 3: Heat Recovery Demonstration Requirements:• Add: “Proposals may receive up to $2,000,000 to implement eligible heat recovery Projects. Cost-share from the Project Team is a requirement for Category 3 Projects submitted after Round 1. For Projects located in Disadvantaged Communities or consisting of Affordable Multifamily Housing, the Project Team must contribute a minimum of 25% of the total Project cost. For all other Projects, the Project Team must contribute a minimum of 50% of the total Project cost.”Page 17 of Program Summary, Funding Caps, Category 3:• Add: “For Projects located in disadvantaged communities or consisting of Affordable Multifamily Housing, the Program will provide cost-share for up to 75% of eligible costs (the Project Team must contribute a minimum of 25% of the total Project cost). For all other Projects, the Program will provide cost-share for up to 50% of eligible costs (the Project Team must contribute a minimum of 50% of the total Project cost).” 6) Pages 10-14 of Program Summary, redefine Category 3 Eligible Projects:• Remove “A proposed Project must incorporate at least one of the following heat recovery solutions:” • Add “A Project must improve the energy performance of the Property by capturing rejected energy from an existing building system or process and reusing the energy to reduce total energy consumption. The captured energy can be stored before being reused within the Project boundary. The Project must propose a Heat Recovery Design consisting of the following four (4) components: waste heat source, heat transfer technology, transfer medium, and heat sink (the end-use of the recovered waste heat). A Project must propose an innovative heat recovery solution. An innovative solution is a method or technology that challenges or outperforms conventional approaches, prioritizing forward-thinking designs over standard, code-compliant, and widely adopted practices in NYS. An example of a standard code-compliant practice is the installation of Dedicated Outdoor Air Systems (DOAS) as Makeup Air Units (MAUs). Proposals should include technologies that are not already widely adopted in NYS, well-known to engineers and building operators, or mandated by existing codes. The technologies proposed should achieve a level of heat recovery efficacy that exceeds commonly available solutions. The Program encourages proposals that demonstrate a wide variety of heat recovery technologies, sources of waste heat, and end uses for the recovered waste heat. Below are four examples of innovative heat recovery solutions with the potential for impact and replicability in existing buildings in NYS. Eligible Category 3 Projects include, but are not limited to, the following:”• Better describe the Proposal Evaluation Criteria:o Remove the tables describing impact, scalability and cost-effectivenesso Add the Proposal Evaluation Criteria from the Scoring Sheet that will be used to evaluate Round 2 proposals. 7) The change to the Category 1 and Category 2 Scope of Work templates does not require a change in the Program Summary document, they are attachments to the Program:• Attachment C - Category 1 Scope of Work Template [DOCX]o Under Task 2 Assessment, add the language “The Contractor shall host a virtual or in-person charrette (a collaborative design session) to present the Assessment Summary to the Customer and NYSERDA. The charrette shall be scheduled in coordination with NYSERDA and include representation from the Customer. The purpose of this meeting shall be to support the Contractor’s design development activities and explore technical and financial solutions to potential heat recovery projects. The Contractor shall use the Assessment Summary to lead discussion during the design charrette.” No new deliverables added based on this language because the Assessment Summary will be the deliverable.• Attachment D - Category 2 Scope of Work Template [DOCX]o Change Task 1 Design Charrette to Task 1 Project Design Kickoff. Change Task 1 deliverable from “Completed Design Charrette slide deck” to “Record of the meeting through meeting minutes or powerpoint presentation.”o Link the Attachment E - Project Design Narrative Template and Attachment F - Data Collection Form where referenced so that Contractor knows what templates to use for these deliverables. 8) The changes to the Category 3 Proposal Template (Attachment C-1) and Category 3 Budget Template (Attachment B) do not require a change in the Program Summary document, since they are attachments.• Attachment C-1 – Category 3 Proposal Template, add “Project Cover Page” to collect high-level project information.• Category 3 Budget Template (Attachment B), modify instructions to match those in the Program Summary, “Complete the Budget Template below or equivalent. The Applicant must provide a Budget broken down by individual line-items by task for materials, labor (edit personnel title and hourly rate), and other costs.” Modification 2, August 2024: Added two new funding categories and modified existing attachments, as described below. In the Program Requirements section of the PON, two new sections were added, including: • Category 3: Heat Recovery Demonstration Requirements (competitive); To include a description of the activity, eligible projects, evaluation criteria, and due dates. See separate funding opportunity " Heat Recovery Project Development - Category 3 Demonstration".• Category 4: Heat Recovery Manufacturer Growth Initiative Requirements (open enrollment); To include a description of the activity and eligible services. Addition of new attachments supporting two new funding categories: • Attachment C-1: Category 3 Proposal Template• Attachment G: Category 4 Scope of Work Template Modifications to provide clarity to existing funding categories: • Revised Attachments C and D, Template Scopes of Work: Addition of an instruction for applicant to include a customized description of the project in the introduction. Addition of a clarifying note in the Task 1 section of the Category 1 SOW explaining the cap for the first milestone payment. Task schedule table changed to include the NYSERDA cost share for each task. • Revised Attachment E – Project Design Narrative Template: Edits to provide consistency in language • Revised Attachment F - Data Collection Form: Addition of new fields more tailored to highlight the financial case for heat recovery projects. The Program aims to increase deployment of technologies to recover and reuse heat by funding the planning and analysis needed to understand a building’s heat recovery opportunity and to design specific heat recovery energy conservation measures. Program funding is intended to reduce the cost and complexity of the upfront assessment and design required to develop projects that incorporate recovery of previously rejected heat. The Program provides cost-share for technical assistance to support the inclusion of heat recovery energy conservation measures within existing building retrofits. Multifamily, commercial, institutional, industrial and manufacturing buildings and facilities are eligible. There are two Categories of activities that can receive project cost-share through this Program: 1) the assessment of the heat recovery opportunity based upon energy rejected by the building’s existing operations and 2) the design of cost-effective heat recovery and reuse approaches to reduce total energy usage. If changes are made to this solicitation notification will be posted on NYSERDA’s website at: www.nyserda.ny.gov/funding-opportunities Eligibility/Qualifications Requirements/Preferences: To qualify for the program, participating buildings must be located in New York State, served by a New York State Investor-Owned Electric Utility (such as Consolidated Edison, National Grid, NYSEG, Orange and Rockland, Central Hudson, or RG&E), and pay System Benefits Charges (SBC). An existing property of any size that falls under the classification of multifamily, commercial, industrial, and/or institutional buildings is eligible. Service-Disabled Veteran-Owned Set Aside: No Minority Owned Sub-Contracting Goal: 0% Women Owned Sub-Contracting Goal: 0% Service-Disabled Veteran-Owned Business Contracting Goal: 0% Disadvantaged Owned Sub-Contracting Goal: 0% Due date:11/17/2025 3:00 PM November 17, 2025 Contract term: Up to 2 years County(ies): All NYS counties Location: Existing buildings in New York State Business entities awarded an identical or substantially similar procurement contract within the past five years: none

More opportunities from New York → Nyserda

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS