This Solicitation opportunity from Washington was posted on October 10, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Heavy Civil GC/CM Services for MDCSO Wet Weather Treatment Station
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the development of the Wet Weather Treatment Station (WWTS) at the mouth of the Duwamish River, a significant infrastructure project aimed at managing combined sewer overflows (CSOs) to improve water quality in the region. The scope encompasses the construction of a large below-grade equalization basin with a capacity of 4 million gallons, along with associated infrastructure such as influent piping, screening, pumping systems, solids handling, odor control, and advanced disinfection technology utilizing ultraviolet light. The project also involves demolition of existing structures, shoring, excavation, soil management—including disposal of contaminated soils—and site surface improvements. Key features include ballasted sedimentation technology for solids removal, UV disinfection systems, and comprehensive instrumentation and controls to ensure operational efficiency and environmental compliance. The procurement process is highly detailed, involving multiple addenda that update insurance requirements, project timelines, scope of work, and contractual terms. The solicitation, issued by King County, seeks a Heavy Civil General Contractor/Construction Manager (GC/CM) with an estimated project value ranging from 50 to 150 million dollars, with a focus on collaborative delivery and adherence to state procurement statutes. The process includes preconstruction and construction phases, with draft contracts outlining scope, cost, and project schedule, emphasizing early subcontracting, risk management, and integration of lean construction and Building Information Modeling (BIM) principles. The project is scheduled for completion by December 31, 2034, with a proposal deadline set for October 28, 2025, and aims to deliver a high-capacity, environmentally sustainable treatment facility to mitigate urban water pollution and enhance regional water management infrastructure.
General Info
Agency
Place of Performance
WA, USASet-Aside
Documents
8AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- V-Belt Procurement (NSN 3030001172423)Open now, due in 14 days
- Supply of Wiper Rings (NSN 5330015177671)Open now, due in 10 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
