Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on September 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Heavy Civil GC/CM Services for MDCSO Wet Weather Treatment Station

Closed
001480,2State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
Demolition of Connex Box Structures and Removal of Debris
Solicitation # ACFD 26-03
The Alameda County Fire Department (ACFD) is soliciting sealed bids for solicitation number ACFD 26-03, focused on the demolition of Connex Box Structures and the removal of debris at 890 Lola Street in San Leandro, California. This is a stipulated sum, single-prime contract with a total project duration of 120 calendar days. Bids must be submitted by 2:00 pm on December 10, 2026, at 6363 Clark Ave., Dublin, California. The contract will be awarded to the lowest responsive and responsible bidder based on the base bid amount. Required submission documents include a bid bond or security of 10 percent of the total bid price, a non-collusion declaration, a debarment form, and a designated subcontractors list. The successful contractor must provide 100 percent performance and payment bonds and adhere to California Public Works Contract requirements, including the payment of prevailing wages. Key operational requirements include the submission of a site security and logistics plan addressing tool control and working around inmates, as well as strict adherence to soil dust mitigation and hazardous materials procedures. Project milestones range from the initial kick-off meeting and equipment delivery to final site clearance. The contractor is also required to comply with the Americans with Disability Act and Title VII of the Civil Rights Act of 1964. All work is subject to inspection and potential rejection by the ACFD and the Construction Manager to ensure conformity with technical specifications and industry standards.
AC Fire Department

POSTED

about 8 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract pertains to the development of the Wet Weather Treatment Station (WWTS) at the mouth of the Duwamish River, a critical infrastructure project designed to treat combined sewer overflows (CSOs) before their discharge into the waterway. The scope encompasses the construction of a below-grade 4 million-gallon equalization basin, influent piping, screening, pumping systems, and a UV disinfection system utilizing ballasted sedimentation technology for solids removal. Additional work includes demolition of existing structures, shoring and excavation, soil management—including disposal of contaminated soils—and site surface improvements. The project also involves installing solids storage, odor control systems, instrumentation, and controls to ensure operational efficiency and environmental compliance. The procurement process is managed by King County, Washington, with a solicitation issued for Heavy Civil GC/CM (General Contractor/Construction Manager) services, with responses due by October 21, 2025. The contract size is estimated between 50 million and 150 million dollars. The process includes multiple addenda that update insurance requirements, emphasizing compliance with the Owner Controlled Insurance Program (OCIP) and specific coverage limits for professional liability, pollution, and other risks. The contractual documents comprise draft agreements for both preconstruction and construction phases, outlining scope, cost, schedule, and legal provisions, all governed by Washington State RCWs. The project emphasizes collaborative delivery, with a focus on safety, environmental stewardship, and adherence to regulatory standards, aiming for a comprehensive, integrated approach to constructing a state-of-the-art CSO treatment facility with an estimated project duration of over 124 months.

General Info

Place of Performance

WA, USA

Set-Aside

NONE

Documents

6

Addendum 1 KC001480 Heavy Civil GC/CM Services for Mouth of the Duwamish CSO Wet Weather Treatment Station

PDF, High priority: read this first50 pages · amendment
High

KC001480 RFP Addendum 2 - Heavy Civil GC/CM Services Insurance Requirements

PDF, High priority: read this first3 pages · amendment
High

RFP KC001480 Heavy Civil GC/CM Services for Mouth of the Duwamish CSO WWTS

PDF, High priority: read this first44 pages · rfp
High

RFP KC001480 Proposal Cover Sheet for Heavy Civil GC/CM Services

DOCX, High priority: read this first1 page · rfp
High

KC001480 Heavy Civil GC/CM Construction Services Contract Draft

PDF, Low priority396 pages · contract-document
Low

KC001480 Heavy Civil GC/CM Preconstruction Services Agreement

PDF, Low priority125 pages · contract-document
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → King County
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → King County
Office AddressN/A
Contacts
Melissa Jordan

Full Description

Show more
The WWTS is a new treatment facility to treat combined sewer overflows (CSOs) prior to discharge through a new outfall into the east waterway at the mouth of the Duwamish River. The project will construct an equalization basin(s), screening, pumps, ballasted sedimentation technology for solids removal, chlorine disinfection system utilizing ultraviolet light (UV) disinfection, solids storage, and instrumentation and controls. The scope includes the demolition of existing structures and foundations, construction of a below-grade 4 million-gallon (MG) equalization basin, shoring and excavation work, and soil management (including disposal of contaminated soils, ground improvements, and tremie slabs). The scope also includes influent piping, screening and pumping, construction of a vendor supplied ballasted sedimentation UV disinfection treatment system, solids handling, odor control systems, and site surface improvements.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS