This Solicitation opportunity from Washington was posted on September 17, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Heavy Civil GC/CM Services for MDCSO Wet Weather Treatment Station
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract pertains to the development of the Wet Weather Treatment Station (WWTS) at the mouth of the Duwamish River, a critical infrastructure project designed to treat combined sewer overflows (CSOs) before their discharge into the waterway. The scope encompasses the construction of a below-grade 4 million-gallon equalization basin, influent piping, screening, pumping systems, and a UV disinfection system utilizing ballasted sedimentation technology for solids removal. Additional work includes demolition of existing structures, shoring and excavation, soil management—including disposal of contaminated soils—and site surface improvements. The project also involves installing solids storage, odor control systems, instrumentation, and controls to ensure operational efficiency and environmental compliance. The procurement process is managed by King County, Washington, with a solicitation issued for Heavy Civil GC/CM (General Contractor/Construction Manager) services, with responses due by October 21, 2025. The contract size is estimated between 50 million and 150 million dollars. The process includes multiple addenda that update insurance requirements, emphasizing compliance with the Owner Controlled Insurance Program (OCIP) and specific coverage limits for professional liability, pollution, and other risks. The contractual documents comprise draft agreements for both preconstruction and construction phases, outlining scope, cost, schedule, and legal provisions, all governed by Washington State RCWs. The project emphasizes collaborative delivery, with a focus on safety, environmental stewardship, and adherence to regulatory standards, aiming for a comprehensive, integrated approach to constructing a state-of-the-art CSO treatment facility with an estimated project duration of over 124 months.
General Info
Agency
Place of Performance
WA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
