Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

High-Efficiency Window Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Place of Performance

NM, USA

Set-Aside

NONE

Documents

This scope was carved out of 26-27-056.

The full solicitation package (6 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

HVAC Heat Pump Installation and Light Weatherization for Multifamily Housing - Chaparral Senior Housing ReSolicitation (Plugged In For Good)

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew Mexico → Administration
ContactsNo contacts available
OfficeN/A
Organization / AgencyNew Mexico → Administration
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies and installs energy-efficient windows for prime contractors on City multifamily housing projects. Removes existing windows and installs new units meeting U-factor 0.30 and SHGC 0.25 thermal ratings. Requires compliance with Davis-Bacon wage requirements. Delivers installed windows meeting specified U-factor and SHGC ratings.

Similar Contracts

Same NAICS industry code

NAICS: 238170
New
Wind River Job Corps Center- Cafeteria Gutter & Downspout Installation
Solicitation # wind-river-job-corps-center-cafeteria-gutter-downspout-installation
Arbor E & T, LLC dba Equus Workforce Solutions is seeking bids for a fee-for-service subcontracting opportunity to install heavy-duty commercial metal gutters and downspouts at the Wind River Job Corps Center in Riverton, Wyoming. The project focuses on Building 4204 (Cafeteria/Warehouse) to mitigate hazardous ice accumulation and water runoff along the west patio and southwest main cafeteria entrance. The scope of work includes the installation of approximately 125 linear feet of gutters and a minimum of three 6-inch corrugated or box commercial downspouts. All work must strictly comply with SMACNA sizing standards and OSHA safety regulations, with a requirement for corrosion-resistant fasteners and a leak-free guarantee under sub-zero and heavy precipitation conditions. A final water flow inspection is required for project closeout. This solicitation is open to various SBA-certified small businesses, including VOSB, SDVOSB, WOSB, and HUBZone designations. Interested bidders must submit their price quotes, a signed Vendor Self-Certification Form, and signed Terms and Conditions via email to Hannah Schooner by November 30, 2026, at 2:00 PM MST. A pre-bid walkthrough is scheduled for November 17, 2026. Award selection will be based on best value as determined by Equus. The contract is subject to the Service Contract Act, requiring compliance with Wage Determination No. 2015-5407, and incorporates several FAR clauses regarding the Buy American Act, first-tier subcontractor reporting, and safety standards.
EQUUS Workforce Solutions operator of the Wind River Job Corps

POSTED

about 4 hours ago

DEADLINE

in 16 days
View Details

More opportunities from New Mexico → Administration

Same awarding agency

NAICS: 238220
New
SLED
HVAC Heat Pump Installation and Light Weatherization for Multifamily Housing - Chaparral Senior Housing ReSolicitation (Plugged In For Good)
Solicitation # 26-27-056
The City of Las Cruces is soliciting proposals for a multifamily retrofit project at Chaparral Senior Housing, a 40-unit complex. The project involves installing ductless mini-split dual-zone heat pump systems for 25 designated units, upgrading to ENERGY STAR or equivalent LED lighting and smart thermostats, and performing light weatherization improvements. The expected period of performance is six to nine months following the notice to proceed, with a strict requirement that HVAC installation for each unit be completed within one day to ensure minimal tenant disruption. The scope includes a phased approach consisting of pre-construction review, on-site assessments for all 40 units, scope finalization, and the securing of necessary permits. Proposals are evaluated via a points-based system focusing on technical approach (40%), team qualifications (30%), past performance (15%), and cost (15%). A 5% preference is granted to certified City of Las Cruces businesses, with a maximum total geographical preference of 10%. Contractors must comply with Davis-Bacon Act wage requirements, submitting weekly reports via LCPTracker. Key deliverables include property-specific scopes of work and itemized cost estimates aligned with CEED cost caps. Final project acceptance requires a walk-through and clearance from Tierra Del Sol, with all systems commissioned and performance metrics verified.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

about 19 hours ago

DEADLINE

in 10 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS