Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

High-Speed Rail Operations Control Center (OCC) Building

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California High-Speed Rail Authority is seeking a contractor to construct a six-story Operations Control Center building located south of Fresno, California. This facility is a critical component of the Operation and Maintenance Facility and is designed to support both initial day one operations and the long-term maintenance requirements of the high-speed rail system. The project is currently listed as a forecast with a posted date of September 3, 2026. The primary point of contact for this initiative is Stefan Galvez-Abadia, the Director of Environmental Services. Performance of the contract will take place in California, specifically within the 93725 zip code area.

General Info

Contractor needed to build six-story Operations Control Center south of Fresno, California.

Agency

California High Speed Rail Authority

NAICS

236220 - Commercial and Institutional Building ConstructionView NAICS

Place of Performance

East American Avenue and South Cedar Avenue, CA, 93725

Set-Aside

NONE

Documents

(2)

HSR OCC Building CEQA Exemption Memo_OCR_submitted

PDF

20260902_OCC_NOE_ - signed_OCR_submitted

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia High Speed Rail Authority
Contacts1 person available
OfficeN/A
Organization / Agency
California High Speed Rail Authority
Office AddressN/A
Contacts
Stefan Galvez-AbadiaDirector of Environmental Services

Full Description

Show more
The California High-Speed Rail Authority (Authority) has identified the need for a six-story Operations Control Center (OCC) Building as part of the Operation and Maintenance Facility (OMF) planned south of the City of Fresno. This facility will be used to support day one operations and long-term maintenance of the high-speed rail (HSR) system.

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
NJCC Bathroom Renovations for Buildings 17 & 18
Solicitation # njcc-bathroom-renovations-buildings-17-18
This subcontract opportunity is for the complete renovation of bathroom areas in two dormitory buildings at the Northlands Job Corps Center in Vergennes, Vermont. The project involves the renovation of four bathroom areas totaling approximately 944 square feet in Building 17 and five bathroom areas totaling approximately 1,260 square feet in Building 18. The scope of work includes the demolition of existing fixtures and the installation of institutional-grade acrylic shower pans, vitreous China toilets, high-pressure laminate countertops, non-slip porcelain flooring, and LED vanity lighting. All work must comply with ADA, OSHA, and National Electrical Code standards. To maintain center operations, contractors must follow a phased sequencing plan, renovating the dormitories one at a time. Bidders may submit a unified proposal for both buildings or standalone bids for each. Proposals must include a completed bid sheet with an itemized cost breakdown separating labor and materials, a detailed project schedule specifying calendar days and working hours, current Vermont professional licensing, and certificates of insurance. The award is not based solely on the lowest bid, as Education and Training Resources serves as the sole judge of technical alignment and risk. Winning bidders must be registered in Sam.gov with a Unique Entity ID and provide a 100 percent performance and payment bond. The contract adheres to various Federal Acquisition Regulations, including the Davis-Bacon Act and the Service Contract Act, with standard payment terms of net 30 days following the completion of a signed punch list and submission of warranties.
Northlands Job Corps Center /ETR

POSTED

about 10 hours ago

DEADLINE

in 10 days
View Details
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation by J & J Contractors, Inc. is for the construction of the P1102 Weapons Magazine and Ordnance Operations Facility at the Naval Submarine Base New London in Groton, Connecticut. The project scope involves a 1828 calendar day duration and includes the construction of six Containerized Long Weapons Storage units, two Box G, and one Box H earth-covered high-explosive magazines. Key deliverables include the installation of overhead cranes, foundations with rigid inclusions and load transfer mats, intrusion detection systems, and grounding and lightning protection. Additionally, the project requires the construction of a new Ordnance Operations building, a Truck Inspection area, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. The comprehensive site work involves clearing, rock excavation, grading, and the mitigation of impacts on existing wetlands. Infrastructure requirements include the installation of primary and secondary electrical distribution systems, telecommunications, outside lighting, and the development of access roads and paved loading areas. This opportunity is set aside for various small business categories, including SDB, WOSB, HUBZone, VOSB, and SDVOSB. Interested parties must respond by October 31, 2026, and should contact Rahul Maheshwari for bid invitations and access to the full documentation.
J & J Contractors, Inc

POSTED

about 10 hours ago

DEADLINE

in about 2 months
View Details