Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

High-Speed Roll-Up Door Equipment Supplier

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract agreement establishes a partnership for the manufacture and delivery of specialized high-speed roll-up door hardware and electronic control systems for City of Milton facility projects. The supplier is responsible for providing 10 complete door systems along with essential components, including operators, controls, remote transmitters, and critical safety equipment such as sensing edges and light curtains. All equipment must be delivered directly to the project site and strictly adhere to the city's specific requirements regarding speed and fire apparatus clearance. The contract is categorized under NAICS code 332322 and is managed through the state of Georgia for the City of Milton. Interested parties must have submitted their responses by the deadline of November 4, 2026. This arrangement ensures that prime contractors have the necessary high-performance infrastructure to maintain operational efficiency and safety standards for municipal facilities.

General Info

Place of Performance

GA, USA

Set-Aside

NONE

Documents

This scope was carved out of ITB 27-FD01.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

ITB 27-FD01, Fire Station Bay Door Replacement Project

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeorgia → The City of Milton
ContactsNo contacts available
OfficeN/A
Organization / AgencyGeorgia → The City of Milton
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supplies specialized high-speed roll-up door hardware and electronic control systems for prime contractors on City of Milton facility projects. Manufactures and delivers 10 high-speed roll-up door systems, 10 remote transmitters, operators, controls, and safety equipment including light curtains and sensing edges. Equipment must meet City of Milton requirements for fire apparatus clearance and speed. Delivers door systems and components to the project site.

Similar Contracts

Same NAICS industry code

More opportunities from Georgia → The City of Milton

Same awarding agency

NAICS: 238910
New
SLED
ITB 27-PW01, Bldg Demos @ One, Two, and Three Verizon Pl
Solicitation # ITB 27-PW01
The City of Milton, Georgia, is soliciting electronic bids under ITB 27-PW01 for the demolition of three office buildings located at One, Two, and Three Verizon Place at the northeast corner of Morris Road and Deerfield Parkway. The project involves the demolition of three 3-story structures totaling approximately 433,326 square feet. The selected contractor must establish an 80-foot safety zone and utilize standard mechanical or approved alternate demolition methods. Scope of work includes the removal and disposal of C&D waste to permitted landfills, as well as the management of hazardous materials such as CFC-containing refrigerants, universal waste, and asbestos-containing materials (ACM). ACM must be handled, packaged, and labeled in strict accordance with EPA, OSHA, and Georgia EPD regulations, including NESHAP standards. The contract will be awarded to the lowest, responsible, and responsive bidder. Bids must be submitted via the City's procurement portal by November 12, 2026, at 2:00 PM. Required submission documents include a signed cover sheet, a bid bond of at least 5% of the bid amount, a list of subcontractors, and various certifications including eVerify and corporate certificates. The contractor must be capable of starting work within ten calendar days of the Notice to Proceed. Payment will be issued monthly via U.S. Mail within 30 days of invoice approval, with a 10% retainage held until final completion. All work must comply with GDOT Standard Specifications and Drawings, as well as Title 49 CFR Part 21 regarding nondiscrimination.
Site Preparation Contractors

POSTED

1 day ago

DEADLINE

in 27 days
View Details
NAICS: 238290
New
SLED
ITB 27-FD01, Fire Station Bay Door Replacement Project
Solicitation # ITB 27-FD01
The City of Milton is soliciting bids under ITB 27-FD01 for a lump sum purchasing contract to remove and replace existing sectional apparatus bay doors with high-speed roll-up systems at Fire Stations 41 and 43. The project involves the installation of ten total door systems, including six at Station 43 and four at Station 41, along with all necessary electrical work, structural preparation, and safety equipment such as light curtains and bottom sensing edges. Qualified bidders must demonstrate professional competence in installing high-speed roll-up systems for fire stations and comply with all federal, state, and local regulatory requirements. Bids must be submitted via the City's procurement portal by November 4, 2026, at 2:00 p.m. EST. The award will be granted to the lowest, responsible, and responsive bidder. Required submission documents include a bid bond equal to 5% of the base bid, a signed bid form, qualifications certification, and a list of subcontractors. The successful contractor must provide performance and payment bonds totaling 100% of the base bid price and maintain insurance policies with an A.M. Best rating of at least A:VI. The selected contractor must be capable of starting work within ten calendar days of the Notice to Proceed. Payment terms are set at thirty calendar days following invoice approval, with a 10% retainage held until final completion. Final acceptance is contingent upon the successful testing and demonstration of all ten door systems to the City of Milton and City of Milton Fire Rescue, ensuring that fire apparatus can enter and exit bays without obstruction.
Other Building Equipment Contractors

POSTED

1 day ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS