Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Government of Canada was posted on May 20, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HIGH STREET RECONSTRUCTION - PHASE 1

Closed
BT-OID2026-033Canada

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months

AI Contract Overview

Show more

The Town of Georgina is inviting qualified contractors to bid on the reconstruction of High Street in Sutton, Ontario, specifically the first phase spanning from Dalton Road to River Street and West Street to Highway 48. This project, designated as Phase 1 of a two-phase initiative, must be completed during the 2026 construction season and includes comprehensive infrastructure upgrades such as removal of existing materials, replacement of storm and sanitary sewers, watermain installation, concrete work, bridge rehabilitation, streetlighting enhancements, and full restoration of disturbed surfaces. Technical specifications outlined in Appendix F detail the standards and requirements for execution, and bidders must be prepared to meet all stipulated criteria. The work area is critical to the community as it runs through Sutton’s historic downtown, with active storefronts and residential access points requiring continuous accommodation throughout construction. The successful bidder must prioritize maintaining uninterrupted access for pedestrians and vehicles while minimizing disruptions to local businesses and residents. Phase 2 of the project, involving the final segment between River Street and West Street along with the final asphalt lift for Phase 1 areas, will be tendered separately in 2027. Bidders must understand that while Phase 1 is standalone for now, its completion sets the foundation for future work. The solicitation number is BT-OID2026-033, with bids due by June 8, 2026, and the project is classified under NAICS code 237310. The primary point of contact for inquiries is Stirling Munro, Contracting Authority for the Town of Georgina, reachable via the provided email and phone. All respondents are expected to demonstrate experience with similar municipal infrastructure projects, particularly in densely populated urban environments, and must submit proposals that reflect an understanding of the unique challenges posed by working in a heritage commercial corridor while adhering strictly to the technical and logistical requirements outlined in the tender documents.

General Info

Town of Georgina seeks bids for High Street reconstruction with phased work, traffic access, deadline June 8, 2026.

Agency

Government of Canada → Town Of GeorginaView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

CAN

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGovernment of Canada → Town Of Georgina
Contacts1 person available
OfficeN/A
Organization / Agency
Government of Canada → Town Of Georgina
View Agency Profile
Office AddressN/A
Contacts
Stirling MunroContracting Authority

Full Description

Show more
The Corporation of the Town of Georgina (Town) is seeking bid submission from qualified vendors (respondents) for the provision of all labour, materials and equipment necessary to undertake the reconstruction of High Street from Dalton Road to River Street & West Street to Highway 48 in Sutton, Ontario (work);The technical special provisions (See APPENDIX F – TECHNICAL SPECIFICATIONS) are being issued, primarily as a means of supporting the tender process to secure the services required to complete the works;Generally, the works include removals, road restoration, replacement of storm sewer, replacement of sanitary sewer, concrete works, watermain replacement, bridge rehabilitation, streetlighting improvements, and restoration of disturbed areas;This project will be completed in two separate Phases;Phase 1 includes the work outlined herein and must be completed during the 2026 construction season;Phase 2, including the construction of the final section between River Street to West Street, will be completed during the 2027 construction season, through a separate future tendering process; andPhase 2 will also include the final lift of asphalt for Phase 1 areas.Respondent must note that High Street is a key area for the Town of Georgina as it hosts their historic downtown area for the Village of Sutton;The project area includes storefront presence and access to residential properties; andThe successful respondent (contractor) must maintain access to storefronts and accommodate pedestrian and vehicular traffic to always minimize impacts on local businesses and residents during construction.