Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Highway 86 Water Transmission Main Phase 3 and 4 Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Highway 86 Water Transmission Main Phase 3 and 4 Project, managed by the Coachella Valley Water District, involves upgrading the domestic water distribution system serving Salton Sea Beach, Desert Shores, Salton City, and unincorporated areas within Riverside and Imperial Counties. The scope of work entails replacing approximately 14.5 miles of existing 16-inch and 18-inch diameter asbestos cement and ductile iron pipes with approximately 15.4 miles of 24-inch diameter ductile iron pipe. The new pipeline will be situated primarily within the Caltrans Right of Way for about 13 miles, with the remaining two miles located in street rights of way or newly obtained utility easements. The pipeline alignment begins with a connection to a 30-inch diameter ductile iron pipe west of Highway 86 at the intersection of Lincoln Street and 84th Avenue in Riverside County. It proceeds east along 84th Avenue, turns south parallel to Highway 86, moves east near Postmile 61, continues south along Lesser Drive, and runs parallel to Highway 86 for three miles to Golden Avenue. The project terminates at the Coachella Valley Water District's Reservoir No. 1092 at the end of Diamond Avenue in Salton City, Imperial County. A Mitigated Negative Declaration has been certified under CEQA, confirming that the project will have no significant environmental impact.

General Info

CVWD replaces 14.5 miles of aging pipe with 15.4-mile 24-inch ductile iron line serving Salton Sea communities.

Agency

California → Coachella Valley Water District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

84th Street, Johnson Street, Lesser Drive, Golden Avenue, Diamond Avenue, CA, 92275

Set-Aside

NONE

Documents

(1)

NOD Highway 86 Water Transmission Main Phase 3 and 4 Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Coachella Valley Water District
Contacts1 person available
OfficeN/A
Organization / Agency
California → Coachella Valley Water District
Office AddressN/A
Contacts
William PattersonEnvironmental Services Program Supervisor

Full Description

Show more
CVWD proposes improvements to the domestic water distribution system serving the communities in the vicinity of Oasis and Salton City, in Riverside County and Imperial County. The proposed Project entails the replacement of approximately 14.5 miles of existing 16-inch and 18-inch diameter asbestos cement pipe (ACP) and ductile iron pipe (DIP) domestic water transmission mains with approximately 15.4 miles of 24 inch diameter DIP water transmission main to serve the communities of Salton Sea Beach, Desert Shores, Salton City, and unincorporated areas in Riverside and Imperial Counties on the west side of the Salton Sea, hereinafter referred to as the Pipeline. Approximately 13 miles of the Pipeline, would be located within Caltrans Right of Way (ROW); approximately two (2) miles of the Pipeline would be located within existing street ROW or newly obtained utility easements across private property outside of Caltrans ROW. The proposed Pipeline would connect to the existing water distribution system via connection to an existing 30-inch diameter DIP west of Highway 86 at the intersection of Lincoln Street/84th Avenue in Riverside County. The Pipeline Alignment would follow 84th Avenue east for approximately one mile before turning southward where it would run roughly parallel to southbound Highway 86 in Caltrans ROW. Near Postmile 61, approximately one mile south of the Red Earth Casino, the Pipeline Alignment turns east for approximately 0.75, then continues south along Lesser Drive. The Pipeline would then intersect and run parallel to southbound Highway 86 for approximately 3 miles to Golden Avenue where the Pipeline would turn west and terminate at CVWD's existing Reservoir No. 1092 at the end of Diamond Avenue in Salton City in Imperial County. The proposed Pipeline would connect to existing water mains in Service Road and Golden Avenue.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Biola CSD - Wastewater Treatment Plant Improvements (C-06-8155-210), Kerman, CA
Solicitation # biola-csd-wastewater-treatment-plant-improvements-c-06-8155-210-kerman-ca
GSE Construction Co., Inc. is seeking quotes from qualified subcontractors and suppliers for the Biola Community Services District Wastewater Treatment Plant Improvements (Redesign) Project in Kerman, California. This comprehensive infrastructure project involves the demolition of existing facilities and the draining of multiple lagoons and ponds. Key construction elements include a new headworks facility with mechanical screening and compaction units, a new influent eccentric manhole, a flow meter vault, and the replacement of influent pumps and surface aerators. Additionally, the scope covers the installation of a sludge dewatering pipeline and ponds, a reinforced concrete pad for an emergency generator, and a new CMU operations and electrical building equipped with HVAC and plumbing. The project also requires the implementation of a facility-wide PLC/SCADA monitoring system and various civil improvements such as asphalt resurfacing, grading, and piping. This opportunity is open to small businesses and certified disadvantaged, minority, and women-owned business enterprises across a wide range of NAICS codes related to heavy and civil engineering construction. Interested parties must submit their responses by October 21, 2026, and can coordinate with the primary point of contact, Christina Pauls.
GSE Construction Co., Inc.

POSTED

about 9 hours ago

DEADLINE

in 29 days
View Details
NAICS: 237110
New
JCSD Intervalley Pipeline Project; PN C155003
Solicitation # PN C155003
The Jurupa Community Services District Intervalley Pipeline Project, solicitation number PN C155003, involves the installation of 3.3 miles of potable water transmission pipeline located on Country Village Road in Jurupa, California. Managed by Filanc, the project has an engineer's estimate of 36,000,000 dollars and is subject to American Iron and Steel (AIS) and Build America, Buy America (BABA) requirements. The scope of work is comprehensive, encompassing pipeline infrastructure such as valves, welding, cathodic protection, jack and bore, and precast vaults, as well as civil works including paving, striping, flatwork, fencing, and potholing. Technical services required include videography, testing and inspections, settlement monitoring, survey, and E&IC, alongside compliance tasks such as SWPPP, traffic control, and asbestos pipe demolition and removal. The solicitation is open to a wide range of small business set-asides, including SDB, WOSB, HUBZone, and Veteran-owned businesses, with a strong emphasis on the participation of SBE, MBE, and WBE firms. Filanc has committed to providing assistance to qualified small businesses regarding bonding, insurance, credit lines, and equipment to encourage diverse subcontracting. Bids for the various project scopes are due by September 23, 2026. Interested parties can obtain plans and specifications through the primary point of contact, Julia Masaitis.
Filanc

POSTED

about 9 hours ago

DEADLINE

in about 23 hours
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 9 hours ago

DEADLINE

in 7 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS