Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Highway Maintenance Project

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans District 7 is proposing a highway maintenance project along State Route 33 between post miles 42.7 and 52.1 in Ventura County, specifically from Pine Mountain Summit to Oak Creek. The project will include applying a 0.15-inch rubberized hot-mix asphalt gap-graded overlay to rehabilitate the pavement surface, improving ride quality and extending the roadway’s service life. Additional improvements consist of installing Bikes Allowed Use of Full Lane and 3 Ft Min Clearance to Pass signage, green conflict zone striping at driveways and intersections to enhance safety for all road users, digout repairs and crack sealing to address existing pavement distress, and shoulder backing to stabilize the road edge. No new right-of-way will be acquired, and no public utilities will be moved as part of this effort. The work is focused solely on maintenance and safety enhancements to bring the highway up to current standards without expanding infrastructure. The opportunity was posted on July 24, 2026, with Hannah Tram, Environmental Scientist at Caltrans, listed as the primary point of contact for inquiries.

General Info

Caltrans to apply asphalt overlay and safety upgrades on SR-33 between Pine Mountain Summit and Oak Creek.

Agency

California → Caltrans, District 7 - Los Angeles

Place of Performance

CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 7 - Los Angeles
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 7 - Los Angeles
Office AddressN/A
Contacts
Hannah TramEnvironmental Scientist

Full Description

Show more
Caltrans is proposing a Highway Maintenance project along State Route (SR) 33 from Pine Mountain Summit to Oak Creek in Ventura County between post miles (PM) 42.7 and 52.1. The proposed scope of work involves applying 0.15-inch rubberized hot-mix asphalt (RHMA) gap-graded overlay, installing “Bikes Allowed Use of Full Lane” (R9-20) and “3 Ft Min Clearance to Pass” (R4-19) signs along the route, installing green conflict zone striping at driveways and intersections, performing digout repairs and crack sealing, and installing shoulder backing. This project will rehabilitate the pavement to bring the highway and its facilities to current safety standards. No public utilities will be relocated, and no new right-of-way will be acquired.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including land surveying, site photography, tunneling, boring, jacking, micro tunneling, and the installation of utilities, cathodic protection, and steel casing. Additional requirements encompass site preparation, shoring, subsurface investigation, SWPPP, asphalt paving, landscaping, and the supply of ready mix and precast concrete. The solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. A critical requirement is that responsible subcontractors and material contractors must provide bonding for 100 percent of their contract value, though Kiewit will reimburse the associated bond premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 1 hour ago

DEADLINE

in 10 days
View Details
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 17 hours ago

DEADLINE

in 5 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS