This Solicitation opportunity from Indiana was posted on November 19, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HighAI Summary for 2026-09 Addendum 2 Independent Contractors for Education-Related Services RFP: This document is Addendum 2 to the Request for Proposal (RFP) 2026-09 issued by ESC Region 13 for Independent Contractors to provide education-related services. Issued on 12/11/2025, it outlines the purpose of the RFP, key dates including question and response deadlines, and submission instructions. The RFP seeks qualified contractors to support educational programs with services such as technical assistance and curriculum development. It excludes direct-to-student services, professional development, and staffing services. The contract term begins upon execution and may be renewed annually up to five years, expiring in 2031. The document also details the pre-proposal conference, required attachments like Conflict of Interest Questionnaire, and the continuous solicitation process.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bid 2026-06 Attachment 2 100% Specifications - Chiller Replacement Technical Specifications: This document, dated January 22, 2026, contains the technical specifications for the chiller replacement project at the Coconino County King Street Building, located at 2625 North King Street, Flagstaff, AZ. It includes detailed sections covering general requirements, existing conditions, concrete, finishes, HVAC, and earthwork. The specifications outline project information, work covered by contract documents, site access, coordination with occupants, work restrictions, and specification conventions. It serves as a comprehensive guide for contractors on the scope, materials, procedures, and quality requirements for the cooling system improvements under a single prime contract.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bid 2026-06 Health and Human Services Building Chiller Project: This document is a Request for Bid (RFB) issued by Coconino County for the Health and Human Services Building Chiller Replacement Project, identified as Bid 2026-06. The bid was issued on March 31, 2026, with a mandatory pre-bid conference scheduled for April 21, 2026, and a bid submission deadline of May 6, 2026. The document includes contact information, bid opening details, required attachments such as a 10% bid bond, and detailed bid attributes including compliance certifications and past performance disclosures. The bid covers materials, equipment, labor, and applicable sales tax for the project. The award will be made based on price, conformity to specifications, and other factors including quality and past performance, with the possibility of rejecting all bids if deemed in the public interest.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for Bid 2026-06 HHS Chiller Project - Coconino County: This document is a Notice of Bid (Bid 2026-06) issued by Coconino County for the Health and Human Services Building Chiller Replacement Project. It includes instructions to bidders, bid submission requirements, mandatory pre-bid conference details, and evaluation criteria. The bid opening is scheduled for May 6th, 2026, with bids to be submitted via the Ion Wave Technologies platform. The document outlines bonding requirements, bid price conditions, and cooperative purchasing agreements. It emphasizes compliance with applicable laws and policies, and provides protest procedures. The document is intended to solicit sealed bids for the specified project and contains critical instructions and conditions for bidders.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bid Specifications for Demolition at 1020 Messanie St: This document outlines the bid specifications for the demolition of a house structure located at 1020 Messanie St, St. Joseph, MO. It includes requirements for asbestos detection and removal, compliance with federal, state, and local laws, and contractor responsibilities such as utility disconnection verification, obtaining permits, and waste disposal. The document mandates adherence to environmental and safety regulations including EPA, OSHA, and Missouri DNR standards. It also details procedural steps for inspections, erosion control, and notification of delays. The document serves as an exhibit to a broader agreement and emphasizes contractor obligations to ensure lawful and safe demolition practices.
PDF
PDF, High priority: read this firstbid-specifications
HighAI Summary for Bid Specifications for Demolition at 1103 Douglas St: This document outlines the bid specifications for demolition work at 1103 Douglas Street, St. Joseph, MO. It details the demolition of a house and detached garage, including asbestos detection and removal requirements. Contractors must comply with all federal, state, and local laws, including EPA, OSHA, DOT, and Missouri DNR regulations. The document specifies contractor responsibilities such as utility disconnection verification, obtaining necessary permits, waste disposal, and erosion control plans. It also includes procedural requirements for inspections and notifications related to demolition activities. The document emphasizes compliance with Missouri's Underground Facility Safety and Damage Prevention Act and mandates submission of payment requests with proper disposal receipts. This is a critical document for contractors bidding on the demolition project, dated as per the agreement referenced within.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bid Specifications for Demolition at 1510 Dewey Ave: This document outlines the bid specifications for the demolition of a house structure located at 1510 Dewey Ave, St. Joseph, MO. It includes requirements for asbestos detection and removal, compliance with federal, state, and local laws, and contractor responsibilities such as utility disconnection verification, obtaining permits, and waste disposal. The document specifies adherence to environmental and safety regulations including EPA, OSHA, DOT, and Missouri DNR standards. It also details procedural steps for inspections, erosion control, and notification protocols related to demolition activities. The document serves as a binding exhibit to the main agreement between the City and the contractor, emphasizing legal and operational obligations for the demolition project.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Bid Specifications for Demolition at 3827 King Hill Ave: This document outlines the bid specifications for the demolition of a house structure located at 3827 King Hill Ave, St. Joseph, MO. It includes requirements for asbestos detection and removal, compliance with federal, state, and local laws, and contractor responsibilities such as utility disconnection verification, waste disposal, and permit acquisition. The document specifies adherence to environmental and safety regulations including EPA, DNR, OSHA, and DOT standards. It also details procedural obligations like notification of demolition, erosion control plans, and inspection scheduling. The document serves as a binding exhibit to the main agreement between the contractor and the City, emphasizing legal compliance and operational protocols for the demolition project.
PDF
PDF, High priority: read this firstbid-specifications
HighAI Summary for Bid Specifications for Demolition at 634 N 14th St: This document, titled 'Bid Specifications' for the property at 634 N 14th Street, outlines the requirements and conditions for demolition of a trailer structure and debris removal. It includes compliance mandates with federal, state, and local laws, asbestos handling protocols, and necessary permits. The contractor must verify utility disconnections, obtain all required permits, and follow erosion control plans. Payment is contingent on submission of invoices and disposal receipts. The document also details inspection requirements and contractor responsibilities to ensure safe and lawful demolition activities.
PDF
PDF, High priority: read this firstitb
HighAI Summary for CD2027-02 Community Development Demolitions - Invitation to Bid: This document is an Invitation to Bid (ITB) issued by the City of St. Joseph, Missouri, for the demolition of 5 structures at specified locations. The ITB number is CD2027-02, issued on 7/31/2026 with a response deadline of 9/1/2026 at 3:00 PM CT. It includes detailed bid instructions, submission requirements including a 5% bid bond, SAM.gov registration, and performance bond conditions. Bidders must submit electronically and comply with all stated terms including conflict of interest and anti-collusion certifications. The demolition completion time is 14 calendar days from notice to proceed. The document also outlines communication protocols and required attachments such as W-9 forms and bid specifications for each location.
PDF
PDF, High priority: read this firstrfp
HighAI Summary for CSP #25-05-01 Addendum 4 - North Harris School of Cosmetology Renovations: This document is Addendum 4 to Competitive Sealed Proposal (CSP) #25-05-01 issued on 6/26/2025 for construction services involving renovation and site improvements of the Childcare Center / YMCA Building at Lone Star College System - North Harris Campus. It includes key dates such as question deadline (7/24/2025), response deadline (7/31/2025), and presentation/interview dates. The document provides contact information, bid activities, instructions for submission, and required attachments including safety records and forms. It outlines the scope of work, bidding process, and conditions for award, emphasizing compliance with bid terms and the possibility of partial awards. The document supports the solicitation for construction services and is critical for bidders preparing proposals.
PDF
PDF, High priority: read this firstq-and-a
HighAI Summary for CSP #25-05-01 Addendum 4 - North Harris School of Cosmetology Renovations Q&A: This document is Addendum 4 for Competitive Sealed Proposal (CSP) #25-05-01 concerning the North Harris School of Cosmetology Renovations. Issued on 6/26/2025, it contains a series of published questions and answers related to the construction services project. The Q&A addresses clarifications on specifications, materials, and project requirements, with many answers indicating that further details will be handled during the negotiation process after proposal submissions. Key information includes deadlines for questions (7/24/2025) and proposal responses (7/31/2025), and confirmation of a 100% bid bond requirement. The document supports bidders in understanding project scope and requirements for the renovation work at the North Harris Campus.
PDF
PDF, High priority: read this firstcontractor-qualification-statement
HighAI Summary for DRAFT AIA Document A305-2020 Contractor's Qualification Statement: This document is the DRAFT AIA Document A305-2020, titled Contractor's Qualification Statement. It is a form used by contractors to provide detailed information about their organization, including type of work performed, legal status, experience, capabilities, and references. The document includes exhibits for general information, financial and performance data, project-specific information, and past project experience. It requires certification by an authorized representative and notarization. The draft version was produced on 02/03/2022 and contains important legal considerations for completion or modification.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Harris County Wage Rates 2-4-25 - Issue for Bid Project Documents: This document titled 'Harris County Wage Rates 2-4-25' dated 07/22/25 is an issue for bid project document for Lone Star College - North Harris School of Cosmetology. It includes architectural, MEP, structural, landscape, IT/security, and civil engineering design team contacts. The document contains floodplain information, benchmark data, project status updates, and detailed construction and finish schedules. It serves as a critical reference for wage rates and project specifications necessary for bidding and contract compliance.
OCTE
OCTET-STREAM, High priority: read this firstq-and-a
HighAI Summary for RFP 2026-09 Independent Contractors for Education-Related Services Q&A: This document is a Public Questions & Answers (Q&A) for RFP 2026-09 titled 'Independent Contractors for Education-Related Services' issued by ESC Region 13. It provides clarifications on the scope, submission requirements, timelines, and participation conditions for the RFP issued on 12/11/2025. The Q&A addresses topics such as eligibility of Texas Education Service Centers, task expectations for curriculum review, submission deadlines, and exclusions from the RFP scope. The document is intended to assist potential contractors in preparing their proposals and understanding the solicitation requirements.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Texas Harris County Building Construction Wage Determination TX20250253: This document is the General Decision Number TX20250253 dated 01/03/2025 for building construction projects in Harris County, Texas. It supersedes TX20240253 and provides wage rates and fringe benefits for various construction trades under the Davis-Bacon Act. It includes minimum wage requirements per Executive Orders 14026 and 13658, effective for contracts entered or renewed on or after January 30, 2022. The document lists specific hourly wage rates and fringe benefits for trades such as insulators, boilermakers, carpenters, electricians, elevator mechanics, ironworkers, plumbers, pipefitters, and others. It also outlines contractor obligations and worker protections under the Executive Orders.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Wage Determination TX2025026 for Montgomery County, TX Building Construction: This document is the General Decision Number TX2025026, published on January 3, 2025, superseding TX20240262. It provides wage determinations for building construction projects in Montgomery County, Texas, excluding single-family homes or apartments up to four stories. The document outlines minimum wage rates and fringe benefits for various construction trades, including insulators, boilermakers, electricians, elevator mechanics, and more. It references compliance with the Davis-Bacon Act and Executive Orders 14026 and 13658, specifying wage adjustments effective in 2025. The document includes detailed hourly rates and fringe benefits for each trade and notes on worker protections and contractor requirements under the Executive Orders.
LowAI Summary for 2026-09 Conflict of Interest Questionnaire: This document is a Conflict of Interest Questionnaire for vendors doing business with a local governmental entity, reflecting changes made by H.B. 23, 84th Legislature. It is filed in accordance with Chapter 176 of the Local Government Code and requires vendors to disclose business relationships, employment, gifts, and family relationships with local government officers. The questionnaire must be filed within seven business days after the vendor becomes aware of facts requiring disclosure. The document includes relevant legal citations and definitions from the Local Government Code sections 176.001, 176.003, and 176.006, outlining the requirements and penalties for non-compliance.
XLSX
XLSX, Low priorityaward
LowAI Summary for Award Detail Spreadsheet for North Harris School of Cosmetology Renovations: This document is an award detail spreadsheet for the Competitive Sealed Proposal (CSP) #25-05-01 Addendum 4 issued by Lone Star College, TX. It covers construction services for renovation and site improvements at the North Harris School of Cosmetology. The award was made to CMC Development & Construction of Houston, TX, with a total award amount of $4,302,500. The spreadsheet includes line items such as site work, building exterior, interior construction, building systems, and roofing repairs allowance. The document provides contact information for the bid creator, Lydia Sterling, and details about the Lone Star College System and its educational mission.
XLSX
XLSX, Low prioritybid-tabulation
LowAI Summary for CSP #25-05-01 Addendum 4 - North Harris School of Cosmetology Renovations Bid Tabulation: This document is a bid tabulation spreadsheet for Competitive Sealed Proposal (CSP) #25-05-01 Addendum 4 issued by Lone Star College, TX. It summarizes bids submitted by various construction suppliers for renovation and site improvements at the North Harris School of Cosmetology. The tabulation includes supplier names, locations, submission times, lines responded, and total bid amounts. Detailed line items cover site work, building exterior, interior construction, and building systems with associated pricing. The document serves to compare supplier bids for the construction project and does not contain solicitation instructions or evaluation criteria.
PDF
PDF, Low priority4 pages · other
LowAI Summary for IRS Form W-9 Request for Taxpayer Identification Number: This document is the IRS Form W-9 (Rev. December 2014), used to request a Taxpayer Identification Number (TIN) and certification from U.S. persons. It includes sections for providing name, business name, tax classification, exemptions, address, and TIN. The form certifies the correctness of the TIN, exemption from backup withholding, U.S. person status, and FATCA reporting exemption if applicable. It is used by entities required to file information returns with the IRS to report payments made to the individual or entity. The form includes instructions, certification statements, and definitions relevant to U.S. tax reporting requirements.
PDF
PDF, Low priority6 pages · other
LowAI Summary for Supplier Response Quick Tutorial for Ion Wave Technologies Bidding System: This document is a quick tutorial for suppliers on how to navigate and use the Ion Wave Technologies (IWT) software system to locate bid requests and submit bid responses. It covers logging in, accessing bid events, understanding the various tabs within a bid event such as Event Details, Questions, Activities, Attachments, Attributes, Line Items, and Response Submission. The tutorial explains how to handle required fields, upload attachments, submit responses, and resolve submission errors. It also mentions features like digital signature, response retraction, and system notifications. The document is instructional and dated around 2023, aimed at guiding suppliers through the bidding process on the IWT platform.
PDF
PDF
OCTE
OCTET-STREAM
AI Contract Breakdown
Uniform Contract Format
Sign up to view the full breakdown with detailed analysis of each section.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
November 19, 2025 Request for Quote The City of Columbus wishes to make certain public improvements: Project #25-17 Hiker Trace ADA Ramps You are invited to submit a quote to complete the above named public improvement. Quotes will be accepted only through the electronic bidding system, Ion Wave Technologies. All responses are due prior to the published closing date and time No mailed, emailed, faxed, hand delivered or late responses will be accepted. Submitted quotes will be opened and taken under advisement at the City of Columbus’ Board of Public Works and Safety (BPWS) meeting that morning. Following verification of the lowest responsive and responsible quote, an award will be made at the next BPWS meeting. The City of Columbus expressly reserves the right to reject any and all quotes. The signed Quote Form will be the contract. You are required to submit a fully executed Comprehensive Compliance Form (CCF) along with the contract. You are required to submit a copy of the Certificate of Liability Insurance with the quote. Insurance coverage is required in the amount of not less than Three Hundred Thousand Dollars ($300,000) for any one person, nor less than One Million Dollars ($1,000,000) for any one accident. The work must be completed by May 15, 2026 . Failure to complete projects on time will result in the deduction of $100 per calendar day, not counting weekends and holidays, as liquidated damages, from any money due the Contractor. Contractor will be required to obtain a Request for Special Use of Right of Way for any street, traffic lane, alley, parking space or sidewalk closure. www.columbus.in.gov