Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on November 13, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hill Road over Hans Yost Creek Structure Rehabilitation Project (0000-032133.00)

Awarded
0000-032133.00State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
International
Conservation Work and Access Road Improvement of Shahr-e Gholghola to Chehel Dukhtaran Ancient Qalah and Access Road Improvement of Zargaran Bala and Zargaran Payeen Valley in Bamiyan, Afghanistan Aziz Ur Raman Tanha - [email hidden]
Solicitation # AFG26ITB009
UNESCO is soliciting bids for a large-scale works project in Bamiyan province, Afghanistan, focused on preserving heritage properties and upgrading informal settlements in Sayed Abad, Zargaran Bala, and Zargaran Payeen villages. The scope of work includes the conservation of the Ancient Qalahh of Chehel Dukhtaran, improvement of access roads from Shahr-e Gholghola to the Qalahh, and the installation of drainage systems. Key construction activities involve stone masonry, Plain Cement Concrete (PCC), boulders, and Reinforced Cement Concrete (RCC). The project is supported by the government of Italy and implemented through UNESCO and UN-Habitat. The contract will be awarded to the lowest priced technically qualified bidder based on criteria including technical capacity, experience, and compliance with specifications. The performance period requires commencement within 45 days of site access, with substantial completion expected within four months. Financial terms include a potential 20% advance payment, with progress payments submitted monthly and final payment processed 30 days after the issuance of a Certificate of Substantial Completion. Contractual obligations include a 10% performance guarantee valid for 12 months post-completion and a 12-month defects liability period. Liability insurance must cover the contract value plus 10%. For delays, liquidated damages are set at 0.35% of the contract price per calendar day, capped at 10%. Bidders must submit their proposals in PDF format via email by November 29, 2026, ensuring all files are under 10MB per email and avoiding third-party file-sharing tools.
UNESCO

POSTED

about 19 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
Salem Twp- T-16 Culvert Washout Replacement
Solicitation # 49913
The Salem Township T-16 Culvert Washout Replacement project involves the emergency repair of a culvert washout on Duck Creek Road in Whipple, Ohio. The scope of work requires the contractor to provide all labor, equipment, and materials to replace the existing washout with a pre-cast concrete four-sided box culvert. The project is governed by the 2023 Ohio Department of Transportation Construction and Materials Specifications and the requirements of the Washington County Engineer. The estimated project cost is $91,527.00, and the contract will be awarded to the lowest and best bidder, provided the bid does not exceed the estimate by more than 10 percent. All work must be completed by April 1, 2027, with a one-year guarantee against defects following final payment. Contractors must adhere to strict regulatory requirements, including Ohio Prevailing Wage Laws, the Ohio Bureau of Worker’s Compensation Drug-Free Workplace Program, and Ohio preference for local products and labor. Required deliverables for the pre-construction meeting include a subcontractor list, a construction schedule, and road closure estimates. The contractor must provide a bid guaranty and, if necessary, a performance bond. Additionally, the project mandates compliance with various federal non-discrimination acts and requires the submission of certified payrolls and proof of Ohio workers' compensation coverage. The Township serves as the sole judge of the quality of materials and workmanship, and the pre-cast box culvert must be installed within a single day after coordinating with the county.
Washington County, OH - Engineer

POSTED

1 day ago

DEADLINE

in 16 days
NAICS: 237310
New
SLED
KTA 8297
Solicitation # 8297
KTA Contract 8297, managed by the Kansas Turnpike Authority, involves the installation of an Ultrathin Bonded Asphalt Surfacing (UBAS) overlay on I-35, including interchanges, from mile marker 112 to 132 in Lyon County. The scope of work encompasses UBAS, commercial grade asphalt patching and surfacing, patching of the I-35 mainline, and the milling and inlaying of the outside shoulder. Key deliverables include the installation of specific pavement markings, such as 12-inch white chevron lines and 6-inch yellow edge lines, and the implementation of comprehensive work zone traffic control. Performance is scheduled in phases, with asphalt patching and commercial grade paving starting no earlier than April 12, 2027, and UBAS and remaining work commencing after May 31, 2027. The contract will be awarded to the lowest responsible bidder based on the summation of unit prices multiplied by approximate quantities. Bidders must provide a statement of financial condition unless pre-qualified by the Kansas Department of Transportation or the Authority, and must submit a bid bond of 5 percent of the bid. The contractor is required to provide certificates of insurance for Workers' Compensation, Employer's Liability, and Comprehensive Public Liability and Property Damage Insurance. All work must adhere to the 2015 Standard Specifications for State Road and Bridge Construction and KDOT Construction Manual standards, with strict prohibitions against making turnarounds through the barrier wall.
Kansas Turnpike Authority

POSTED

1 day ago

DEADLINE

in 2 days

AI Contract Overview

Show more

Barry Township in Schuylkill County, Pennsylvania, is soliciting sealed bids for the Hill Road Over Hans Yost Creek Structure Rehabilitation Project. The scope of work involves the rehabilitation of an existing bridge and corresponding roadway, specifically requiring the replacement of the superstructure and minor modifications to the substructure. The project will be awarded to a single contractor, and both the prime contractor and all subcontractors must be PennDOT prequalified. Bids must be submitted electronically via the PennBid Program by December 1, 2025, at 12:00 P.M., with public announcements following at 7:00 P.M. that evening. Bidders are required to submit a bid security of 10 percent of the total construction bid in the form of a certified check, bank draft, government bonds, or an acceptable bid bond. The successful bidder must provide performance and payment bonds each totaling 100 percent of the contract price. This public works contract mandates compliance with the Public Works Employment Verification Act, the Pennsylvania Human Relations Act, and the payment of prevailing wages, with certified payrolls submitted weekly. Award will be granted to the lowest responsive and responsible bidder following an evaluation of compliance and qualifications. Technical requirements include strict adherence to Pennsylvania Department of Environmental Protection guidelines for erosion and sediment control, as well as the use of identifiable U.S. steel. Materials must be stored in weathertight enclosures and meet PennDOT and ASTM standards. The period of performance begins within 30 to 60 days of the bid opening or upon issuance of a Notice to Proceed. All work is subject to on-site inspection and acceptance by the Engineer and Owner based on the project specifications and quality assurance protocols.

General Info

Contract Value

$311,000

Place of Performance

Schuylkill County, PA, USA

Set-Aside

NONE

Award Issued Date

Documents

9
PDF, High priority: read this firstspecifications
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstproject-manual
High
PDF, High priority: read this firstbid-form
High
PDF, High priority: read this firstsow
High
PDF, Low prioritybid-summary
Low
PDF
PDF
PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

Solicitation number changed from Barry Township, Schuylkill County to 209516. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Schuylkill County
Contacts1 person available
OfficeSchuylkill County, PA, USA
Office AddressSchuylkill County, PA, USA

Interested Companies (88)

AST Formliners
Atlas Flasher & Supply
B&J Excavating

See All 88 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Ref. #: Barry Township, Schuylkill County
Sealed Bids for Barry Township – Hill Road Over Hans Yost Creek Structure Rehabilitation Project will be received online via the PennBid Program by Barry Township until Monday, December 1, 2025, at 12:00 P.M. (prevailing time). Bids will be publicly announced on Monday, December 1, 2025, at 7:00 P.M. during the regular meeting of Barry Township. Bid results will be available online at http://PennBid.Bonfirehub.com following the meeting. This project will include the rehabilitation of the existing bridge and corresponding roadway rehabilitation. Work will include the replacement of the existing superstructure and minor modifications to the substructure. The particular items of work for the contract are identified more specifically in the Bid Form, Contract Specifications and Contract Documents. The entire project will be awarded to one (1) Contractor. Contractor and all subcontractors are to be PennDOT prequalified. All Bidding Documents are available at no cost at http://PennBid.Bonfirehub.com. Contractors who require assistance utilizing PennBid can contact them by email at contact@example.gov or call +1 (555) 000-0000. All Questions due by 12:00 PM (Noon) November 25, 2024, via PennBid. A certified check or bank draft, payable to the order of Barry Township, negotiable US Government Bonds (at par value), or satisfactory Bid Bond executed by the Bidder and acceptable surety in the amount of 10% of the Total Bid of construction shall be submitted with each bid. THE SUCCESSFUL BIDDERS will be required to furnish and pay for satisfactory Performance and Payment Bonds, each in the amount of one hundred percent (100%) of the Contract Price with a corporate surety approved by the Owner. Attention is called to the fact that no less than the minimum salaries and wages as set forth in the Contract Documents must be paid on this project and that the Contractor must ensure that employees and applicants for employment are not discriminated against because of their race, age, color, religion, sex, ancestry, national origin, or handicap. Certified payrolls must be submitted weekly. The Contractor will be required to comply with the Provisions of the Pennsylvania Human Relations Act in providing equal employment opportunities in connection with all work. This bid is for a public works contract and bidder is therefore subject to the provisions, duties, obligations, and penalties of the Public Works Employment Verification Act, 43 P.S. 167.1-167.11. All submitted bids shall be accompanied with the Public Works Employment Verification Form. The Owner reserves the right to reject any or all bids or to waive any informalities in the bidding. Bids may be held by the Owner for a period not to exceed 60 days from the date of opening bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the contract. However, the award of the contracts may be delayed by required approval of another government agency or closing on the project funding loans. Owner shall reject all bids or award to the lowest responsive and responsible bidder within 120 days of the bid opening.
By order of: Barry Township Morgan Yarnall

More opportunities from Pennsylvania → Schuylkill County

Same awarding agency

NAICS: 237110
SLED
WWTP Influent Pump Improvements
Solicitation # 011353.10
The Porter-Tower Joint Municipal Authority in Schuylkill County, Pennsylvania, is soliciting bids for WWTP Influent Pump Improvements at its facility in Tower City. The project involves the installation of a new influent wet well Jockey pump equipped with a Variable Frequency Drive in the Operations building. The comprehensive scope of work includes demolition, structural work, process mechanical and electrical installations, piping, panel modifications, process instrumentation, and SCADA integration. The procurement is divided into two distinct contracts: Contract No. 01 for General/Process Mechanical work and Contract No. 02 for Electrical work. The contract is governed by EJCDC standard documents, including the C-700 General Conditions and C-520 Stipulated Price Agreement. Bids must be submitted electronically via the PennBid portal by December 16, 2026, and will be awarded to the responsible bidder providing the lowest responsive bid based on a combination of lump sum and unit prices. Award evaluation considers the bidder's qualifications, experience, and financial ability. Contractors must adhere to the Pennsylvania Prevailing Wage Act and provide certifications regarding non-discrimination and sexual harassment. Site requirements include compliance with ADA standards and the owner's safety program. Quality control is the responsibility of the contractor, with independent testing firms performing inspections as required by the engineer, ARRO Consulting, Inc. Final payment is contingent upon the engineer's recommendation of acceptability and the completion of all identified corrections.
Water and Sewer Line and Related Structures Construction

POSTED

9 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS