Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Hilltop Park Center Renovation - Roof Replacement (ncp2505)

Active
20260720003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Monterey Department of Public Works is soliciting bids for the complete roof replacement at the Hilltop Park Center, a 17,200 square foot facility located in Monterey, California. The scope of work includes demolition of the existing built-up gravel roofing system and installation of a new roofing system, replacement of 14 skylights, voluntary seismic strengthening measures such as diaphragm reinforcement, blocking, and structural connections, and installation of new gutters and downspouts. The project requires comprehensive management of hazardous materials including asbestos-containing pipe insulation, drywall joint compound, roofing mastics, and lead-based paint on exterior components, with strict adherence to Cal-OSHA Title 8 §1532.1 for lead-safe work practices. All work must comply with the California Building Code, CALGreen, ASCE 7 for wind and seismic loads, UL 790 for fire ratings, ASTM standards for materials, and manufacturer specifications particularly those from Johns Manville for warranty compliance. Work must be performed in a professional and workmanlike manner using materials approved by the City Engineer, with all components labeled by the single-source roofing manufacturer to maintain system guarantees. Performance is scheduled to begin within 14 calendar days of the Notice to Proceed and must be completed within 25 working days thereafter, with no fixed calendar dates provided. Bids are submitted as lump sum items including mobilization, stormwater compliance, roof removal and installation, structural upgrades, and debris removal, with no pricing visible in the solicitation as bids are to be submitted separately by offerors. Bonds are required at 100% of the contract value for contracts over $500,000, with sureties needing California licensure and an A.M. Best rating of A:VII or better; payment and performance bonds may be substituted with adequate securities under state law. Contractors must carry builder’s risk insurance for the full replacement value and pollution legal liability coverage of $1 million per occurrence and $2 million aggregate, with policies excluding lead, asbestos, and mold liabilities and naming the City as an additional insured. Environmental compliance mandates adherence to CARB regulations for diesel equipment, and contractors must submit a Certificate of Reported Compliance if such equipment is used. Contractors performing public work must register with the California Department of Industrial Relations and certify good faith efforts to hire local Monterey Bay Area residents, with all subcontractors included in this certification. Bid submissions are electronically required via the OpenGov Procurement Portal in PDF format only, with a

General Info

Replace Hilltop Park Center roof, skylights, gutters, and perform seismic upgrades with asbestos and lead abatement.

Agency

California → City of Monterey, Department of Public WorksView Agency

NAICS

238160 - Roofing ContractorsView NAICS

Place of Performance

Monterey, CA, 93940, USA

Set-Aside

NONE

Documents

(4)

Addendum 1 for Hilltop Park Center Roof Replacement NCP2505

PDFamendment

Hilltop Park Center Renovation - Roof Replacement Specifications

PDFspecifications

Hilltop Elementary School Drawings 1961

PDFother

Hilltop Community Center Voluntary Seismic Strengthening Structural Specifications May 8 2026

PDFspecifications

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Monterey, Department of Public Works
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Monterey, Department of Public Works
View Agency Profile
Office AddressN/A
Contacts
Engineer / City Engineer

Full Description

Show more
The project involves the complete roof replacement for the Hilltop Park Center, an approximately 17,200 sq. ft. facility. The scope includes demolition of the existing built-up gravel roofing system and installation of a new system. Work also includes removal and replacement of 14 skylights, voluntary seismic strengthening and structural upgrades (diaphragm strengthening, blocking, connections), and installation of new gutters and downspouts. The project requires management of known hazardous materials, including asbestos-containing pipe insulation, drywall joint compound, and roofing mastics, as well as lead-based paint on exterior components.

Similar Contracts

Same NAICS industry code

NAICS: 238160
New
Dormitory Roof Replacement in Iowa
Solicitation # dormitory-roof-replacement-iowa
The Ottumwa Job Corps Center is soliciting bids for a comprehensive roofing system replacement for the Building 7 Dormitory in Ottumwa, Iowa. The project encompasses approximately 16,250 square feet of roofing and 1,600 square feet of parapet wall assemblies. Qualified contractors must evaluate the existing mechanically attached TPO system and propose either a complete tear-off and replacement or a recover roofing system using a fully adhered single-ply EPDM or TPO membrane. The scope of work includes steel roof deck preparation, installation of polyisocyanurate and tapered insulation for positive drainage, high-density cover boards, and the installation of new perimeter edge securement, metal flashing, and coping systems. Additionally, the contractor is responsible for repairing deteriorated sealants and masonry on parapet walls and modifying roof drains, overflow drains, and scuppers as needed to ensure a watertight system. This solicitation is set aside for various small business categories, including SDB, WOSB, HUBZone, and SDVOSB. Award requirements include the use of manufacturer-certified installers and the provision of a minimum 20-year Manufacturer No Dollar Limit (NDL) warranty and a 2-year contractor workmanship warranty. All work must comply with current IBC and ASCE 7 wind design requirements and ANSI/SPRI ES-1 edge securement standards. This project is subject to the Davis-Bacon Act, requiring adherence to prevailing wage determinations and the submission of certified payroll reporting. Proposals must include a detailed construction schedule and an itemized breakdown of labor and materials.
Ottumwa Job Corps

POSTED

about 7 hours ago

DEADLINE

in 3 days
View Details
NAICS: 238160
New
SLED
Digester 4 Roof Repair Project
Solicitation # 20260814015
The Digester 4 Roof Repair Project, solicitation number 20260814015, is a lump-sum fixed-price contract issued by the Sacramento Area Sewer District (EchoWater) for the cleaning, preparation, and repair of the floating cover of Digester 4 at the EchoWater Facility in Elk Grove, California. The scope of work includes repairing deteriorated areas where coatings have been compromised or foam exposed, followed by the application of a spray polyurethane foam and cold fluid applied roof system. The contractor is responsible for all labor, abatement, disposal, equipment, and materials. The contract includes a base bid and a 20,000 dollar allowance for unanticipated site conditions and spare parts. Performance is subject to strict technical and safety standards, including compliance with CalOSHA, UFC, and various ASTM and SMAQMD environmental regulations. Key requirements include maintaining valid California State License Board and DIR registrations, providing a noncollusion declaration, and adhering to CARB regulations for diesel equipment. Materials must be delivered in original manufacturer packaging and stored in enclosed structures. Award decisions are based on price, fitness, quality, and a preference for California-made materials. All project administration, including progress payment requests and technical submittals, is managed electronically through the District's Project Controls System.
Sacramento Area Sewer District

POSTED

1 day ago

DEADLINE

in 4 days
View Details