Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on September 3, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hodge Elementary Parking Lot Expansion

Closed
20260902008State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an infrastructure initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, subsurface investigation, shoring, and site clearing. Additional requirements encompass surface improvements like asphalt paving, landscaping, and the installation of traffic signs and lighting, along with environmental support services including storm water pollution prevention and quality control. This solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. Responsive bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Interested parties must submit their quotes via the Building Connected system by the deadline of November 18, 2025. Project plans and specifications are available for review at the Kiewit office in Santa Fe Springs, California.
Kiewit Infrastructure West Co.

POSTED

21 minutes ago

DEADLINE

in 23 days
NAICS: 237310
New
SLED
ENG HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project
Solicitation # 2025-24/2025-28
The HSIP Cycle 12 Butterfield Rd Pedestrian Crossing and 2025 Countywide Drainage Project (Project No. 2025-24/2025-28) is a public works solicitation issued by the County of Marin Department of Public Works. Located at the intersection of Irving Drive and Butterfield Road in unincorporated San Anselmo, California, the project scope includes the installation of two crosswalks, ADA-compliant concrete landings, Rectangular Rapid Flashing Beacons (RRFBs), and two bioretention basins. Additional work consists of minor grind and pave operations, traffic striping, and pavement markings. The engineer's estimate for the project is $550,000, with a required completion timeline of 35 working days. Bids must be submitted electronically via BidExpress by October 27, 2026. To be eligible, bidders must possess a valid Class A license and be registered with the Department of Industrial Relations (DIR) to perform public work. Submission requirements include a bid security of 10% of the base bid, a bidder's qualification statement, and various certifications, including compliance with CARB Off-Road Diesel-Fueled Fleets Regulations and federal debarment and suspension certifications. The contract award will be based on budget requirements and granted to the responsible and responsive bidder with the lowest total base bid. The project is governed by the 2025 Caltrans Standard Specifications (Divisions II through XII), the 2024 Green Book, and 2018 Marin Uniform Construction Standards. Contractors are required to provide a baseline schedule within 15 days of contract execution and maintain a comprehensive Quality Control program. Payment is processed monthly via payment requests submitted to the Engineer, with change order bills submitted through the Department's internet billing system. The contract also mandates strict adherence to prevailing wage rates per Labor Code Sec. 1720 et seq. and full compliance with ADA and Section 504 accessibility standards.
County of Marin

POSTED

1 day ago

DEADLINE

in 2 days
NAICS: 237310
New
SLED
RFB - REPAIR, REPLACEMENT, AND CONSTRUCTION OF SELECTED CONCRETE SIDEWALKS, CURBS, AND GUTTERS (FY24-25)
Solicitation # BPM013439
The County of San Diego Department of Public Works is soliciting bids for the repair, replacement, and construction of selected concrete sidewalks, curbs, and gutters for the FY24-25 period. The scope of work includes the installation of sidewalks, curb and gutter, cross gutters, driveways, and curb ramps, with specific project areas including Old Hwy 80 and Agua Dulce. All work must adhere to the 2015 Caltrans Standard Specifications and San Diego County Design Standards, specifically DS-21L for detectable warning surfaces. The contract requires strict compliance with the Americans with Disabilities Act of 1990, Buy America requirements, and state prevailing wage rates under Labor Code Section 1720. Proposals will be evaluated based on the total sum of all contract bid items, and the owner reserves the right to reject obviously unbalanced bids. Bidders must provide a bid security of ten percent of the bid amount via cash, certified check, or bidder's bond, while the successful awardee must furnish performance and payment bonds for one hundred percent of the contract value. Submission requires a complete original bid, including representations and certifications, a Small-Local Business Utilization Plan, and a noncollusion affidavit. The deadline for submission via the BuyNet portal or sealed envelope is December 03, 2026, at 2:00 PM local time. The contractor is required to appoint a quality control manager and must notify the Engineer of any noncompliance within 24 hours. Project management milestones include a preconstruction conference within 15 days of contract approval and the submission of a final as-built schedule within 30 days of completion. The solicitation emphasizes nondiscrimination and affirmative action, incorporating various federal regulations and executive orders, and provides specific preferences and certification paths for small, local, and disabled veteran business enterprises.
San Diego County

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Azusa Unified School District is soliciting bids for the expansion of the parking lot at Victor Hodge Elementary School in Azusa, California. The comprehensive scope of work includes site preparation, grading, paving, striping, drainage installation, landscaping, irrigation repair, and the integration of electrical and security systems. All activities must adhere to DSA requirements, Title 24 of the California Code of Regulations, and local building codes, with a specific emphasis on coordinating schedules to avoid disrupting school activities and testing periods. The project is subject to prevailing wage laws and includes a 3% Disabled Veteran Business Enterprise participation goal. The selected contractor is responsible for obtaining and funding all necessary permits and governmental fees, excluding those required by the DSA. Interested parties must submit their responses by October 1, 2026, and all project inquiries should be directed through the BonfireHub message channel or to Jesus Gonzalez, the Director of Maintenance, Operations and Transportation.

General Info

Bids for Victor Hodge Elementary parking lot expansion due October 1, 2026.

Place of Performance

Azusa, CA, 91702, USA

Set-Aside

NONE

Documents

1

Bid 26-27-08-31 Hodge Elementary Parking Lot Expansion

PDF, High priority: read this firstbid-advertisement
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → Azusa Unified School District
Contacts5 people available
OfficeN/A
Office AddressN/A
Contacts
ALL QUESTIONS REGARDING THIS PROJECT MUST BE ADDRESSED TO BONFIREHUB/MESSAGE CHANNEL
Jesus GonzalezDirector Maintenance, Operations & Transportation

Full Description

Show more
Bid #26-27-08-31: The project involves the expansion of the parking lot at Victor Hodge Elementary School. The scope includes site preparation, grading, paving, striping, drainage system installation, landscaping, irrigation repair, and integration of electrical and security systems. The contractor must coordinate work to avoid interference with school activities, especially during testing periods. All work must comply with DSA requirements, Title 24 of the California Code of Regulations, and local building codes. The project is subject to prevailing wage laws and a 3% Disabled Veteran Business Enterprise (DVBE) participation goal. The contractor is responsible for securing and paying for all necessary permits and governmental fees, except those required by DSA.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS