Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Vermont was posted on May 10, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hogback Road Culvert Replacement and Roadway Repair - Cambridge ER P20-1(845)

Closed
61178State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238120
New
International
Provision of Structural Repairs and Planned Maintenance to Blackpool Tower Winter 2026/7 and Summer 2027
Solicitation # ocds-h6vhtk-078f6c
Blackpool Borough Council is seeking a qualified Remedial Works Supplier to provide structural repairs and planned maintenance for Blackpool Tower, with an estimated total value of 4,000,000 GBP including VAT. The project is divided into three phases: a Winter Works package from November 2026 to March 2027 during operational closure, a Summer Works package from April 2027 to November 2027 during the operating season, and ongoing ad-hoc maintenance beyond November 2027 based on annual surveys. The initial period of performance runs from November 30, 2026, to November 29, 2027, with a possible one-year extension to November 29, 2028. The contract is an open competition with award criteria weighted at 50 percent Quality, 40 percent Price, and 10 percent Social Value. Mandatory requirements include IRATA level 3 qualified supervisors, IRATA level 1 or 2 technicians, and project managers who are Chartered Members of the Institution of Civil Engineers or Institution of Structural Engineers. Suppliers must maintain insurance coverage of 10 million GBP for Employer's Liability and Public Liability, and 5 million GBP for Professional Indemnity. All work must adhere to strict technical and safety standards, including BS EN 1090 Execution Class 3 for steel structures, CDM 2015, and the Work at Height Regulations 2005. The deadline for tender submissions is November 20, 2026.
Blackpool Borough Council

POSTED

1 day ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This contract involves a short-term construction project located on Hogback Road in Vermont, approximately one mile south of the intersection with VT 109, covering a distance of 0.02 miles. The primary scope of work includes removing the existing corrugated metal culvert that carries Judevine Brook beneath Hogback Road and replacing it with a new metal arch supported on precast concrete footings. Additional tasks involve channel work and other highway-related improvements to ensure proper drainage and roadway integrity. The project is managed by Dubois & King Inc on behalf of the Vermont agency and is categorized under NAICS code 238120, indicating specialized work in structural and highway construction. The project is estimated to cost between $500,000 and $1,500,000, with a solicitation posted on May 10, 2024, and a response deadline set for June 3, 2024. Interested contractors can obtain further details or submit their bids through the provided online portal. The primary point of contact for this project is Eric Boozan, reachable via email at [email hidden] or by phone at [phone hidden]. This project aims to improve infrastructure resilience and roadway safety in the area through targeted culvert replacement and associated highway repairs.

General Info

Agency

Vermont → Dubois & King Inc

Place of Performance

VT, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Dubois & King Inc
Contacts1 person available
OfficeN/A
Organization / Agency
Vermont → Dubois & King Inc
Office AddressN/A

Full Description

Show more
LOCATION: Beginning on Hogback Road at a point approximately 1.0 miles south of its intersection with VT 109, and extending southerly for a distance of 0.02 miles. TYPE OF CONSTRUCTION: Work to be performed under this project includes the removal of the existing corrugated metal culvert carrying Judevine Brook under Hogback Road and installation of a new metal arch on precast concrete footings, channel work and other highway related items.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS