This Solicitation opportunity from Massachusetts was posted on October 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
The Town of Holliston is soliciting open market bids for the Holliston Wastewater Treatment Plant Phase 1D Yard Piping project. The scope of work involves the installation of approximately 1,200 linear feet of PVC piping, extending from the plant foundation wall to two feet into the interior of various tank pipe sleeve connections. Key deliverables include the furnishing and installation of yard piping, wall penetration coring, sleeves, interior piping, and full site restoration. All work must be completed within six weeks of contract authorization and must adhere to OSHA, National Electrical Code, and Massachusetts State Building Codes, as well as local Conservation District regulations for erosion and sediment control.
The contract will be awarded as a lump sum to the lowest responsive and responsible bidder. To be considered, submitters must provide at least three references for similar work completed within the last five years and certify that all onsite employees have completed a 10-hour OSHA construction safety course. Bidders must also comply with Massachusetts prevailing wage laws and provide a certificate of tax compliance. Required insurance includes comprehensive commercial general liability with minimum limits of 1 million dollars per occurrence and 3 million dollars annual aggregate, naming the Town of Holliston as an additional insured. Written quotes, including a signed Certificate of Good Faith and Non-Collusion, are due by 10:00 AM on October 30, 2026.
General Info
Holliston seeks bids for wastewater yard piping installation due by October 30, 2026.
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping at the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is October 30, 2026. The document includes references to a Statement of Work, plans, and a quote form.
HTML
HTML, High priority: read this first2 pages · rfb
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: Bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes references to a Statement of Work, plans, and a quote form.
HTML
HTML, High priority: read this first2 pages · rfq
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: Bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes basic header information, item specifications (UNSPSC 83-10-15), and references to attached SOW, plans, and quote forms.
HTML
HTML, High priority: read this firstifb
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping at the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes item specifications for water and sewer utilities (UNSPSC 83-10-15) and references attached SOW, plans, and a quote form.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is October 30, 2026. The document includes item specifications for water and sewer utilities and references attached SOW, plans, and a quote form.
HTML
HTML, High priority: read this firstrfq
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes item specifications for water and sewer utilities and references attached SOW, plans, and a quote form.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open bid solicitation from the Town of Holliston for the installation of yard piping at the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for October 30, 2026. The document includes references to a Statement of Work, plans, and a quote form.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is October 30, 2026. The document includes item details for water and sewer utilities and references attached SOW, plans, and quote forms.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping at the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is October 30, 2026. The document includes references to a Statement of Work, plans, and a quote form.
HTML
HTML, High priority: read this firstrfb
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: Open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes item specifications for water and sewer utilities (UNSPSC 83-10-15) and references attached SOW, plans, and quote forms.
HTML
HTML, High priority: read this firstifb
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes references to a Statement of Work, plans, and a quote form.
HTML
HTML, High priority: read this first2 pages · rfq
HighAI Summary for Bid BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: Open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is October 30, 2026. The document includes item specifications for water and sewer utilities and references attached SOW, plans, and a quote form.
HTML
HTML, High priority: read this firstifb
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is October 30, 2026. The document includes references to a Statement of Work, Plans, and a Quote Form.
HTML
HTML, High priority: read this first2 pages · rfq
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping at the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes item specifications for water and sewer utilities and references attached SOW, plans, and quote forms.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes references to a Statement of Work, plans, and a quote form.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping at the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is October 30, 2026. The document includes item specifications for water and sewer utilities and references attached SOW, plans, and quote forms.
HTML
HTML, High priority: read this first2 pages · rfq
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes item specifications for water and sewer utilities and references attached SOW, plans, and quote forms.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes item details for water and sewer utilities and references attached SOW, plans, and quote forms.
HTML
HTML, High priority: read this first2 pages · rfb
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is October 30, 2026. The document includes item specifications for water and sewer utilities (UNSPSC 83-10-15) and references attached SOW, plans, and quote forms.
HTML
HTML, High priority: read this first2 pages · rfb
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is October 30, 2026. The document includes item specifications for water and sewer utilities and references attached SOW, plans, and quote forms.
HTML
HTML, High priority: read this first2 pages · ifb
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is October 30, 2026. The document includes references to a Statement of Work, plans, and a quote form.
HTML
HTML, High priority: read this firstrfb
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes item specifications for water and sewer utilities (UNSPSC 83-10-15) and references attached SOW, plans, and a quote form.
HTML
HTML, High priority: read this first2 pages · rfb
HighAI Summary for Bid Solicitation BD-27-1627-BOS17-BOS17-134222: Holliston WWTP Phase 1D - Yard Piping: An open market bid solicitation from the Town of Holliston for the installation of yard piping for the Holliston Waste Water Treatment Plant (Phase 1D). The bid opening date is scheduled for 10/30/2026. The document includes references to a Statement of Work, plans, and a quote form.
PDF
PDF, High priority: read this first10 pages · specifications
HighAI Summary for Holliston WWTP Phase 1D - Proposed Phase Upgrade Piping Network Plans: Engineering plans and technical drawings prepared by Lombardo Associates Inc. for the Town of Holliston, dated September 28, 2026. The document details the Phase 1D improvements for the Wastewater Treatment Plant, including a description of work, site plans, existing tanks and piping, pipe sleeve and RMF connection details, and hydraulic profiles.
PDF
PDF, High priority: read this first15 pages · rfq
HighAI Summary for Holliston WWTP Phase 1D - Yard Piping Network Solicitation: Solicitation of quotes issued on October 7, 2026, by the Town of Holliston Sewer Commission for the installation of approximately 1200 LF of PVC piping at the Wastewater Treatment Facility (WWTP). The document outlines submission deadlines (October 30, 2026), prevailing wage requirements, OSHA certification, insurance minimums, and required submission forms including a Certificate of Good Faith and Non-Collusion.
PDF
PDF, High priority: read this first48 pages · specifications
HighAI Summary for Holliston WWTP Phase 1D Yard Piping Specifications and Bid Form: Technical specifications and bid form for the Town of Holliston Wastewater Treatment & Disposal System Upgrades Phase 1D (Yard Piping Project), dated September 28, 2026. The document includes the scope of work, measurement and payment terms, and a bid form for furnishing and installing yard piping, wall penetrations, and site restoration.
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.