Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Georgia was posted on August 12, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hollonville Meter Connection at Hollonville Road Division I & II

Closed
PE-33955-NONST-2026-000000003State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station in North Carolina. The scope of work includes the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables encompass the installation of mechanical and electrical systems, including pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and is set aside for small businesses, including certified veteran, service-disabled veteran, women-owned, and HUBZone small businesses. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation based on qualifications, financial ability, and adherence to bidding requirements, including the submission of Good Faith Efforts and Table A for M/WBE compliance. Performance is governed by EJCDC standard general and supplementary conditions, requiring the successful contractor to provide performance and payment bonds and proof of insurance. The project timeline begins upon the issuance of a Notice to Proceed, with liquidated damages set at 1,000 dollars per day for failure to meet substantial completion deadlines. Payments are processed monthly via applications for payment submitted to the engineer, with payment due 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 6 hours ago

DEADLINE

in 28 days

AI Contract Overview

Show more

The Pike County Water & Sewerage Authority is soliciting sealed competitive cost bids for the construction of the Hollonville Meter Connection at Hollonville Road Division I & II. The project is divided into two primary scopes of work: Division I involves the construction of a metered connection to the City of Griffin Transmission line, featuring a pressure reducing valve, meter, double detector check valve assembly in two vaults, yard piping, valves, and jack and bore steel casing. Division II consists of installing approximately 1,300 linear feet of 8-inch PVC watermain, fire hydrants, gate valves, and erosion control measures. The project will be awarded as a single contract, with substantial completion required within 90 consecutive calendar days and final close-out within 104 consecutive calendar days. Bids must be submitted by Friday, September 11, 2026, at 11:00 A.M. local time to the Pike County Water & Sewerage Authority in Zebulon, Georgia. To be eligible, bidders must be licensed Utility Contractors in the State of Georgia and must clearly write their license number on the bid envelope. Mandatory submission requirements include a Bid Bond or certified cashier's check for at least 10 percent of the bid amount and a completed Bidder’s Affidavit of Compliance with O.C.G.A. §13-10-91 regarding E-Verify. The successful contractor will be required to provide performance and payment bonds each totaling 100 percent of the contract amount from a Georgia-licensed surety company with an A minimum rating. Bidding documents are available through Watkins & Associates, LLC.

General Info

Pike County seeks bids for Hollonville Meter Connection construction by September 11, 2026.

Documents

1

Advertisement for Bids - Hollonville Meter Connection W&A Project No. W1690-019-01

PDF, High priority: read this firstadvertisement-for-bids
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeorgia → Pike County Water & Sewer Authority
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts

Full Description

Show more
Sealed Bids for the construction of the Hollonville Meter Connection at Hollonville Road Division I & II will be received, by Pike County Water & Sewerage Authority, at 7818 US-19 South, Zebulon, Georgia 30295, until Friday, September 11, 2026, at 11:00 A.M. local time, at which time the Bids received will be publicly opened and read. No bid may be withdrawn after the closing time for receipt of bids for a period of sixty (60) days. The work to be done shall consist of furnishing all labor, materials and equipment necessary to construct the proposed Hollonville Meter Connection at Hollonville Road Division I & II as shown on the construction drawings. In general, construction consists of Division I - Metered Connection to the City of Griffin Transmission line complete with Pressure reducing valve, meter, and double detector check valve assembly located in two vaults, yard piping, valves, Jack & bore steel casing and all associated measures for the complete project. Division II - includes approx. 1,300 L.F of 8 PVC Watermain, fire hydrants, gate valves, erosion control and all associated measures for a complete project. Time allotted for completion of work is 90 consecutive calendar days to substantial completion. Work shall be complete and ready for contract close-out with 104 consecutive calendar days. All work shall be completed in accordance with the plans and specifications. The work will be awarded in one (1) Contract. Copies of the Bidding Documents may be obtained from Watkins & Associates, LLC, 1606 Whiddon Mill Road, Tifton, Georgia 31793, (229) 388-8823 (Office of the Engineer), upon payment of a non-refundable fee of $300.00 (cash or check) or $309.00 (credit/debit card) for each set. Prospective Bidders may examine the Bidding Documents at the Pike County Water & Sewerage Authority, 7818 US-19 South, Zebulon, Georgia 30295, or at the Office of the Engineer at Watkins & Associates, LLC, Monday through Friday, between the hours of 8:00 a.m. and 5:00 p.m.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS