Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity was posted on August 26, 2009. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hollywood Reservoir Lakeridge Drive Landslide and Slope Restoration

Awarded
AG-9104-S-09-0003Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
International
2383 Emerson Street - Modular Pump Track - Design-Build Services
Solicitation # RFP 1220-2026-4364
The City of Abbotsford has issued Request for Proposals RFP 1220-2026-4364 for design-build services to create a complete, safe, durable, and fully operational modular pump track facility at 2383 Emerson Street. The project follows a stipulated price contract based on the CCDC 14-2013 Design-Build Agreement. The selected Design-Builder will be responsible for all professional design and engineering services, including the preparation of sealed plans, as well as the provision of all labor, materials, modular pump track units, and site furnishings. Additionally, the contractor must obtain all necessary permits, licenses, and certificates of inspection required by federal, provincial, and local authorities. A mandatory site visit is scheduled for November 9, 2026, at 10:00 AM local time, and attendance is required for proposal submission. The deadline for responses is November 24, 2026, at 10:00 PM. Project acceptance is contingent upon the Consultant and Owner's satisfaction regarding the rectification of deficient work, completion of landscaping and clean-up, and the facility reaching full operational readiness. Payments will be processed via progress payment approvals issued by the City Representative. All work must adhere to the rules and customs of best trade practice and meet the requirements of all governing jurisdictions.
City of Abbotsford

POSTED

1 day ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The Hollywood Reservoir Lakeridge Drive Landslide and Slope Restoration Emergency Watershed Project involves critical infrastructure repairs and slope stabilization. Key construction requirements include the placement of 38,181 cubic yards of fill for slides, site clearing, structures removal, and the installation of various cast-in-drill-hole reinforced concrete piles ranging from 48 to 60 inches in diameter. Additionally, the project requires the installation of 4-inch and 6-inch perforated PVC French drains and general excavation support and protection. The estimated value of the work is between 1,000,000 and 5,000,000 dollars, with a performance period of 142 calendar days from the notice to proceed. This solicitation, identified as AG-9104-S-09-0003 under NAICS code 237990, included an amendment for CAD drawings regarding the grading plan and cross sections. Bids were due by July 28, 2009, at the Davis office.

General Info

Agency

N/A

Contract Value

$1,356,476.53

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

CA, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

4 updates
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Response deadline time changed from 8:00 PM UTC to 11:00 PM UTC on Jul 28, 2009. The notice description changed.

Notice updated

Response deadline time changed from 11:00 PM UTC to 8:00 PM UTC on Jul 28, 2009. The notice description changed.

Notice updated

Response deadline changed from Jul 28, 2009 to Jul 30, 2009. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts1 person available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A
Contacts
Raymond C MillerContract Specialist

Full Description

Show more
This amendment adds clarification language, changes the bid due date, updates the Dept. of Labor wage determination, and corrects and adds some drawings for clarification. This IFB is for Hollywood Reservoir Lakeridge Drive Landslide and Slope Restoration Emergency Watershed Project. Major items of construction are Fill for slides, 38,181 CY; Site clearing and structures removal, Lump Sum; Auger 18, 24-36 inch diameter pilot holes, 648 LF; 48 inch diameter, cast-in-drill-hole reinforced concrete piles, 1192 LF; 60 inch diameter, cast-in-drill-hole reinforced concrete piles, 504 LF; Excavation support and protection, Lump Sum; 6 inch diameter, French drain and perforated PVC pipe, 929 LF; and 4 inch diameter, French drain and perforated PVC pipe, 1662 LF. The period of performance is 142 calendar days from receipt of notice to proceed. Bids are due 7/28/2009 by 3:00 p.m., local time at the Davis office. A site visit is scheduled for 7/9/09 at 1:00 pm local time. Directions to the site visit meeting are: from US 101 South toward Los Angeles take Exit 11 (Barham Blvd. toward Barham Blvd. (0.1 mile); turn left onto Cahuenga Blvd. west (0.1 mile); turn left onto Barham Blvd. (0.3 mile); turn right onto Lake Hollywood Dr. (0.1 mile); turn left onto Primera Ave (0.0 mile); turn slight right onto La Suvida Dr. (0.1 mile); La Suvida Dr. becomes Lake Hollywood Dr. (0.2 mile); turn right to stay on Lake Hollywood Dr. (0.3 mile); end at Lake Hollywood Dr. & Montlake Dr.; from US 101 North toward Harbor Freeway take Exit 11A (Barham Blvd.) toward Barham Blvd./Burbank (0.1 mile); stay straight to go onto Cahuenga Blvd. East (0.5 mile); turn right onto Barham Blvd. (0.3 mile); turn right onto Lake Hollywood Dr. (0.1 mile); turn left onto Primera Ave. (0.0 mile); turn slight right onto La Suvida Dr. (0.1 mile); La Suvida Dr. becomes Lake Hollywood Dr. (0.2 mile); turn right to stay on Lake Hollywood Dr. (0.3 mile); end at Lake Hollywood Dr. & Montlake Dr. The estimated price range for this work is between $1,000,000 and $5,000,000. The solicitation documents will be made available via FedBizOpps website approximately 06/11/2009.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS