The project involves the extension of a sanitary line to the Holmes County Engineer Garage in Ohio, with an estimated base bid construction cost of approximately $1,706,000. The solicitation for this work was posted on April 10, 2026, and responses are due by April 20, 2026. The contracting agency is the Holmes County Engineer's office, classified under SLED (state and local government entity), and the work location is within the state of Ohio. This solicitation seeks qualified contractors to undertake the utility extension work as outlined in the contract documentation.
General Info
Extend sanitary line at Holmes County Engineer Garage, Ohio; bid due April 20, 2026, budget $1.7M.
HighAI Summary for Addendum 1 and Geotechnical Exploration Report for HCE Garage Sanitary Extension: Addendum 1 issued April 10, 2026, updates the bid documents for the HCE Garage Sanitary Extension project in Hardy Township, Holmes County, Ohio, including soil borings and an ODOT permit as attachments. The bid opening date is rescheduled to April 20, 2026. The document also contains a detailed Geotechnical Exploration Report dated December 16, 2024, prepared by Wertz Geotechnical Engineering, Inc. for the Holmes County Engineer's Office. The report covers subsurface conditions, soil borings, laboratory testing, and geotechnical recommendations for the sanitary sewer extension project along State Route 39. It includes site and regional geological descriptions, field investigation methods, and findings relevant to earthwork, sewer installation, and groundwater control.
PDF
PDF, High priority: read this firstcontract-bond
HighAI Summary for Bid Guaranty and Contract Bond for Holmes County Engineer's Garage Utility Extension: This document contains the Bid Guaranty and Contract Bond forms pursuant to Ohio Revised Code sections 153.571 and 153.57 for the Holmes County Engineer's Garage Utility Extension project. It outlines the obligations of the contractor and surety to the Board of County Commissioners for Holmes County, Ohio, including penal sums, conditions for bond nullification, and surety liability limits. The forms specify requirements for bid acceptance, contract performance, and payment to subcontractors, materialmen, and laborers. The document also notes that AIA Bid Bond or Payment and Performance Bond forms are not acceptable for this project. It is intended for use by bidders awarded the contract who submit a bid guaranty other than the combined form.
PDF
PDF, High priority: read this firstqualification-statement
HighAI Summary for Contractor Qualification Statement for Holmes County, Ohio: This document is a Contractor's Qualification Statement submitted to the Board of County Commissioners for Holmes County, Ohio. It collects detailed information about the contractor's organization, licensing, experience, references, and financing. The form includes sections on business history, legal qualifications, past project experience, claims and lawsuits, current projects, management personnel, trade and bank references, surety information, and financial statements. The purpose is to assess the contractor's qualifications and capability to perform construction work for the specified project. The document is structured with numbered sections and tables for detailed responses.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Holmes County Engineer's Garage Utility Extension 2025 Plan Set: This document is the Plan Set for the Holmes County Engineer's Garage Utility Extension project dated 2025. It includes an index of sheets covering general notes, legends, alignment, control, site plans, pump station details, electrical and plumbing specifications. The document contains detailed technical specifications such as power distribution, transformer schedules, and natural gas piping system requirements. It outlines general conditions, installation standards, warranty information, and testing procedures in accordance with the State of Ohio Mechanical Code and local gas company requirements. The plan set is approved by the Holmes County Engineer and prepared for the Holmes County Commissioners.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Holmes County Engineer's Garage Utility Extension Construction and Material Specifications: This document is the construction and material specifications for the Holmes County Engineer's Garage Utility Extension project in Millersburg, Ohio. It includes detailed technical requirements for HDPE gravity sanitary sewer pipe installation, including materials, installation methods, directional boring qualifications, physical properties of pipe and fittings, and marking requirements. The specifications reference ASTM standards and provide guidance on pipe and fitting quality, color, and joint construction. The document is essential for contractors to ensure compliance with project standards and quality control.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Modified Standard General Conditions of the Construction Contract 2013: This document is the Modified Standard General Conditions of the Construction Contract prepared for use with the Agreement Between Owner and Contractor for Construction Contract (EICDC C-520 or C-525, 2013 Editions). It includes detailed articles covering definitions, preliminary matters, contractor and owner responsibilities, bonds and insurance, changes in the work, claims, payments, suspension and termination, dispute resolution, and miscellaneous provisions. The document is copyrighted jointly by the National Society of Professional Engineers, American Council of Engineering Companies, and American Society of Civil Engineers, dated 2013. It serves as a foundational legal framework for construction contracts and should be adapted to specific project circumstances and governing laws.
PDF
PDF, High priority: read this firstpermit
HighAI Summary for ODOT Permit No. 11-2026-0014U for Utility Installation on US62: This document is a permit issued by the Ohio Department of Transportation (ODOT) to Holmes County for utility work on US62, specifically the installation of approximately 4734 feet of 8-inch HDPE gravity sanitary sewer, 4733 feet of HDPE sanitary force main, and associated 6-inch HDPE laterals. The permit, dated 01/20/2026, outlines conditions, terms, and requirements including notification procedures, compliance with traffic control standards, and indemnification clauses. The permit is valid until 01/20/2027 and requires a performance bond. It emphasizes the permittee's responsibility to comply with all regulations and ODOT instructions, with potential revocation for non-compliance.
PDF
PDF, High priority: read this firstwage-determination
HighAI Summary for Ohio Prevailing Wage Rates for Skilled Crafts 2024-2025: This document provides prevailing wage rates for skilled crafts in Ohio, effective 2024 and 2025. It includes detailed wage and fringe benefit payments for various crafts such as Asbestos Workers (Local 207 and Local 84 Heat & Frost Insulators) and Boilermakers (Local 744). The document specifies hourly base rates, fringe benefits, overtime rates, and special jurisdictional notes for multiple counties. It also outlines apprentice ratios and classifications, along with special calculation notes for certain funds. The wage rates are categorized by craft and include effective dates and change numbers for reference.
PDF
PDF, High priority: read this firstcontract-document
HighAI Summary for Owner-Contractor Agreement for Holmes County Engineer's Garage Utility Extension: This Owner-Contractor Agreement document establishes the contractual relationship between the Board of County Commissioners for Holmes County, Ohio (Owner) and the General Contractor for the Holmes County Engineer's Garage Utility Extension project. It includes a comprehensive list of contract documents such as legal notices, bid forms, affidavits, general conditions, and modifications. The agreement outlines the precedence of contract documents, responsibilities regarding geotechnical data, and the relationship with the design professional. It specifies the commencement date, substantial completion within 150 calendar days, and final completion within 30 days thereafter. The document also addresses project coordination, milestone dates, shutdown dates, and utility interruptions. This agreement is effective as of the date signed by the Owner and governs the execution of the project work.
PDF
PDF, Low prioritycontractor-affidavit
LowAI Summary for Contractor's Affidavit and Certification with List of Subcontractors and Suppliers: This document is a Contractor's Affidavit and Certification for the Holmes County Engineer's Garage Utility Extension project. It supports a payment application and includes a sworn statement by the contractor that all previous progress payments have been applied to legitimate obligations. It provides a complete list of subcontractors and suppliers, along with any amounts withheld and reasons for withholding. The contractor certifies payment to subcontractors and suppliers except for those amounts withheld as listed. The document includes a notary public section for sworn certification.
PDF
PDF, Low prioritywaiver-and-release-affidavit
LowAI Summary for Contractor's Final Waiver and Release Affidavit - Holmes County Engineer's Garage Utility Extension: This document is the Contractor's Final Waiver and Release Affidavit for the Holmes County Engineer's Garage Utility Extension project. It acknowledges receipt of payment from the Board of County Commissioners for Holmes County, Ohio, and waives any further claims related to the project, including payment claims, liens, and breach of contract claims, except for properly submitted claims. It certifies that all subcontractors and suppliers have also released claims and that all required labor contributions have been paid. The affidavit benefits the County and includes indemnification provisions. It requires company and authorized signature details, notarization, and date.
PDF
PDF, Low priorityaffidavit
LowAI Summary for Contractor's Personal Property Tax Affidavit - Ohio: This document is the Contractor's Personal Property Tax Affidavit as per Ohio Revised Code § 5719.042. It is a sworn statement by a contractor's authorized representative regarding the status of delinquent personal property taxes in Ohio counties. The affidavit includes fields for the contractor's name, title, address, and details about any delinquent taxes or confirmation of no delinquent taxes. It is notarized with a jurat and includes a notary public's commission expiration date.
PDF
PDF, Low prioritywaiver-release-affidavit
LowAI Summary for Contractor's Waiver and Release Affidavit - Holmes County Engineer's Garage Utility Extension: This Contractor's Waiver and Release Affidavit pertains to the Holmes County Engineer's Garage Utility Extension project. It acknowledges receipt of payment for all work performed through the prior Application for Payment and waives any further claims related to the project, including mechanic's liens and breach of contract claims, except for properly submitted Statements of Claim. The affidavit covers claims by all contractors, subcontractors, and suppliers involved. It also certifies payment of required labor contributions and includes indemnification provisions for the owner. The document requires notarization and signature by an authorized company officer.
PDF
PDF, Low priorityclaim-form
LowAI Summary for Statement of Claim Form: This document is a Statement of Claim Form used by contractors to formally submit claims related to contract issues such as delays or additional compensation. It includes sections for contractor information, claim description, contract document references, delay details, and compensation requests. The form requires notarized acknowledgment by the contractor's representative. Instructions detail how to complete the form accurately, emphasizing the need for specific information on delays, contract provisions, and compensation. The purpose is to notify the owner and design professional promptly to mitigate claim impacts.
PDF
PDF, Low prioritywaiver-and-release-affidavit
LowAI Summary for Subcontractors, Suppliers Final Waiver and Release Affidavit - Holmes County Engineer's Garage Utility Extension: This document is a Final Waiver and Release Affidavit for subcontractors and suppliers involved in the Holmes County Engineer's Garage Utility Extension project. It certifies that upon receipt of final payment from the prime contractor, the subcontractor or supplier waives all lien rights related to labor, equipment, and materials provided for the project, except for previously made claims or perfected liens. The affidavit confirms that the payment represents full and final settlement, including retainage, and that the subcontractor or supplier has completed their work. It also includes indemnification provisions protecting the contractor, surety, and owner from claims or liens. The document requires execution by an authorized company representative and notarization.
PDF
PDF, Low prioritywaiver-release-affidavit
LowAI Summary for Subcontractors, Suppliers Waiver and Release Affidavit - Holmes County Engineer's Garage Utility Extension: This document is a Waiver and Release Affidavit related to the Holmes County Engineer's Garage Utility Extension project. It acknowledges receipt of payment for work performed up to a specified date and waives any claims against the Contractor, surety, and Owner for labor, materials, or equipment provided, except for properly submitted claims. It certifies payment of required labor contributions and obligates the undersigned to execute lien releases upon payment. The affidavit benefits the Contractor, surety, and Owner and includes indemnification provisions. It is notarized to confirm the sworn statement.
PDF
PDF, Low prioritygeotechnical-report
LowAI Summary for WGE HCE Garage Sanitary Extension Geotechnical Exploration Report REV 2: This Geotechnical Exploration Report, dated December 16, 2024, was prepared by Wertz Geotechnical Engineering, Inc. for the Holmes County Engineer's Office. It documents subsurface investigations conducted for the HCE Garage Sanitary Extension project along State Route 39 in Hardy Township, Holmes County, Ohio. The report includes project and site descriptions, regional geological setting, field investigation and laboratory testing details, subsurface soil and bedrock conditions, and geotechnical recommendations related to earthwork, sanitary sewer installation, groundwater control, and construction considerations. The report also contains figures such as boring location maps and soil surveys, as well as boring logs as attachments.
Sanitary line extension to Holmes County Engineer Garage. The total estimated construction cost for the base bid work for the Project being solicited at this time is $1,706,000.