Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

Hopkins Street Repaving with Enhanced Safety Improvements for all Users

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Berkeley is implementing the Hopkins Street Repaving with Enhanced Safety Improvements for all Users project to improve safety, mobility, and access for all roadway users. The scope of work includes repaving Hopkins Street from San Pablo Avenue to Sutter Street, installing one-way Class IV separated bikeways and Class II buffered bike lanes, and adding traffic calming measures such as speed cushions and a raised intersection at Monterey Avenue and California Street. Additionally, the project involves reconstructing the signalized intersection at Sacramento Street and potentially improving the intersection at The Alameda based on available funding. The project also incorporates the installation of floating bus stops for AC Transit, the removal and replacement of intrusive street trees, and the implementation of a comprehensive Curb Management Plan. This plan will address ADA parking, loading zones, and the potential expansion of Residential Preferential Parking eligibility for affected residents. Managed by the Public Works department, this initiative follows a Council-approved referral and a Notice of Exemption to ensure a safer environment for pedestrians, cyclists, and motorists.

General Info

Berkeley is repaving Hopkins Street with safety improvements, bikeways, and traffic calming measures.

Agency

California → City of Berkeley

Place of Performance

Hopkins Street from San Pablo Avenue to Sutter Street, Berkeley, CA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Berkeley
Contacts1 person available
OfficeN/A
Organization / Agency
California → City of Berkeley
Office AddressN/A
Contacts
Jamie ParksPublic Works Director

Full Description

Show more
Per the Council approved Referral to Schedule Hopkins Street for Paving with Enhanced Safety Improvements for all Users (“Hopkins Corridor Project” or “Project”) on July 28, 2026, the approved referral is consistent with the Hopkins Corridor Project approved by City Council on May 10, 2022 for which a Notice of Exemption was filed on July 14, 2022. Consistent with the 2022 approved project, this approved referral directs staff to: • Repave Hopkins Street from San Pablo Avenue to Sutter Street • Include in the above repaving one-way Class IV separated bikeways on each side of the roadway from Peralta Ave/Ohlone Greenway to The Alameda • Add one-way Class II buffered bike lanes and traffic calming on Hopkins from The Alameda to Sutter Street to the extent feasible • Add traffic calming speed cushions and other pedestrian safety features from Stannage Ave to Peralta Ave/Ohlone Greenway to the extent feasible with other pedestrian safety features recommended by staff • Install a raised intersection of Hopkins and Monterey Ave/California Street • Incorporate pedestrian safety features from the 2022-2023 conceptual design as deemed appropriate by Public Works staff • Redesign and reconstruct the existing signalized intersection (with a slip lane) of Hopkins and Sacramento Street to promote safety of all users • Assess and implement improvements for the existing signalized intersection of Hopkins Street and The Alameda to promote safety of all users contingent upon available funding • Install bus boarding islands/floating bus stops with the bikeway routed behind the boarding platform at AC Transit stops • Address street and curb damage from old street trees including removal of trees that are intruding into the usable street width or impacting storm drainage and replace any removed trees at a 1:1 ratio • Develop and implement a comprehensive Curb Management Plan for the commercial, recreational, and residential areas around Hopkins Street that includes ADA parking spaces, loading zones, short-term parking zones, waste collection service needs, and metering adjacent to commercial and/or recreational uses to encourage parking turnover and study the feasibility of expanding the Residential Preferential Parking (RPP) Eligibility Map to the Hopkins Street corridor, along with the ability of Hopkins Street residents living on or adjacent to a block with parking loss to obtain an RPP permit for the nearest street. Hopkins Street Repaving with Enhanced Safety Improvements for all Users Notice of Exemption - September 2026 Attachment The purpose of the project is to improve safety, mobility, and access for all users of the roadway.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an Invitation for Bid (IFB No. 8003R1) for the City of Los Angeles Department of Water and Power. Located in California, the project encompasses a broad range of civil infrastructure and construction services. The scope of work includes site preparation tasks such as land surveying, site clearing, subsurface investigation, and storm water pollution prevention, as well as heavy construction activities including tunneling, boring, jacking, micro tunneling, and utility installation. Additional requirements cover finishing work such as asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, along with the supply of ready mix, precast concrete, and aggregate. This opportunity is set aside for Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Kiewit also emphasizes the importance of labor harmony and notes its status as a signatory to several collective bargaining agreements. Interested firms must submit their responses via the Building Connected system by the bid deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 3 hours ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS