Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Energy was posted on September 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Horizontal High Temperature Tube Furnace (4 Qty.)

Closed
89243326QFE000577Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 333994
New
Federal
Deep Pit Furnace
Solicitation # W519TC-27-Q-A019
The Army Contracting Command - Rock Island is soliciting a single Firm Fixed Price purchase order for one Deep Pit Furnace under solicitation W519TC27QA019. This procurement is a total Small Business Set-Aside under NAICS code 333994. The required furnace must feature an operating range of 1500-1850 degrees Fahrenheit, a load capacity of up to 10,000 pounds, and temperature uniformity of plus or minus 25 degrees Fahrenheit or better. The equipment must comply with ASTM E230 and NFPA 86 standards, and the manufacturer must provide evidence of having supplied or offered this type of equipment for at least three years. Delivery is required by June 1, 2027, on an FOB Destination basis to Rock Island, Illinois. Award will be based on the Lowest Price Technically Acceptable procedure. To be deemed technically acceptable, offerors must provide a compliance statement marking every paragraph of the purchase description as COMPLY or NON-COMPLY and provide a valid firm fixed price. Final acceptance is contingent upon successful on-site testing per AMS 2750, including a Temperature Uniformity Survey and a System Accuracy Test, with signed formal reports required for final payment. The contractor is responsible for site preparation, equipment preservation, and IUID marking per MIL-STD-130. All payments will be processed electronically via Wide Area WorkFlow. A site visit is scheduled for November 10, 2026, and quotes are due by November 17, 2026.
W6QK Acc-Ri

POSTED

2 days ago

DEADLINE

in 19 days
NAICS: 333994
New
Federal
New Heat Treat Equipment
Solicitation # FA9101NHT
The Air Force Test Center’s Installation Contracting Division is conducting market research through a Sources Sought Notice to identify capable small and large businesses for the turnkey procurement, delivery, installation, and commissioning of a new Surface Combustion Allcase Batch Integral Quench Furnace Line. Located at Holloman Air Force Base in Building 1185, the project includes the installation of a Uni-DRAW Temper Furnace and a Spray/Dunk Wash Unit. The selected contractor will be responsible for all specialized engineering, rigging, and labor, ensuring the system is fully operational and compliant with NFPA 86, AMS 2750, OSHA 29 CFR 1910, and NEC/NFPA 70 standards. The performance timeline involves a 4 to 6 week kickoff and drawing phase, followed by a manufacturing lead time of approximately 52 to 78 weeks. On-site installation is expected to take 4 to 6 weeks, with an additional 2 to 3 weeks for commissioning and handover. Formal acceptance requires a successful three-cycle production demonstration and the sign-off of an Engineering Release Form. Additionally, the contractor must provide a two-year extended warranty and comprehensive on-site training for operators and maintenance personnel. Interested respondents must submit their company information, UEI number, technical solutions, budgetary estimates, and delivery timelines by November 2, 2026.
FA9101 Aedc Pkp Procrmnt Branch

POSTED

3 days ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The Department of Energy's National Energy Technology Lab is soliciting quotes for the procurement of four Horizontal High Temperature Tube Furnaces, brand name Carbolite-Gero or an approved equal. These units must be capable of reaching a maximum temperature of 1800 degrees Celsius and feature high-grade Molybdenum Disilicide heating elements. Technical requirements include a 300 mm heated length, a total furnace length of 590 mm, and the ability to accept ceramic work tubes with an outer diameter up to 75 mm. The equipment must be housed in an enclosure not exceeding 650 mm by 650 mm by 600 mm and include a separate control cabinet with interconnecting cables between 10 and 13 meters. The control system must feature a digital PID controller with setpoint and program profile control, Ethernet communication, and adjustable digital over-temperature protection. Electrical specifications require a power supply of 200-210 V, 2 Phase or 3 Phase, 50/60 Hz, 6.4 kW, and the equipment must be NRTL inspected to UL508 and NFPA 86 safety standards. The scope of work encompasses shipping, handling, installation, and commissioning at the NETL facility in Pittsburgh, Pennsylvania. Awardees must provide a one-year warranty, operating manuals for maintenance, and wiring schematics. Offers are due by September 17, 2026, and will be evaluated based on technical acceptability of the salient characteristics.

General Info

NETL seeks four 1800C high temperature tube furnaces for Pittsburgh by September 2026.

NAICS

333994 - Industrial Process Furnace and Oven Manufacturing

Place of Performance

Not specified

Set-Aside

NONE

Documents

2

89243326QFE000577 - Horizontal High Temperature Tube Furnace

PDF, High priority: read this firstrfq
High

Specifications for Horizontal High Temperature Tube Furnace up to 1800 °C

DOCX, High priority: read this first1 page · specifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → National Energy Technology Lab
Contacts1 person available
OfficeMorgantown, WV, 26505-2353, USA
Office AddressMorgantown, WV, 26505-2353, USA
Contacts
Arturo Manantan JrContracting Officer

Full Description

Show more
Brand name or equal to Carbolite-Gero (Verder Scientific, Inc.) Horizontal High Temperature Tube Furnace up to 1800 °C per the attached specifications (4 Qty.)

More opportunities from Department Of Energy → National Energy Technology Lab

Same awarding agency

NAICS: 221122
Federal
BIL – PREVENTING OUTAGES AND ENHANCING THE RESILIENCE OF THE ELECTRIC GRID FORMULA GRANTS TO STATES AND INDIAN TRIBES
Solicitation # DE-FOA-0002736
The Department of Energy, through the National Energy Technology Laboratory and the Grid Deployment Office, is offering formula grants to States and Indian Tribes under solicitation DE-FOA-0002736 to enhance electric grid resilience against disruptive events such as natural disasters, wildfires, and extreme weather. The program focuses on implementing resilience measures, including the use of microgrids and battery-storage subcomponents. Funding is expected to be approximately 459 million dollars annually over a five-year period from fiscal year 2022 to 2026, with an initial performance period of five years that may be extended up to ten years. Eligible applicants must provide a program narrative detailing their subaward criteria and methods, as well as a resilience project package and quarterly monitoring reports. Award priority is given to projects providing the greatest community benefit in rural or urban areas, with specific requirements to ensure a fair percentage of funds reach small utility distributions selling no more than 4 million megawatt hours annually. Compliance requirements include adherence to the Davis-Bacon Act for prevailing wages on construction work exceeding 2,000 dollars, Buy America mandates for iron, steel, and manufactured products, and alignment with NERC CIP and NIST cybersecurity frameworks. Administrative costs are capped at 5 percent of the total federal grant allocation. Applications must be submitted via FedConnect by February 18, 2027, and must include a Unique Entity Identifier from the SAM.
Electric Power Distribution

POSTED

10 days ago

DEADLINE

in 4 months
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS