Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on June 29, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Hornsby Bend Ammonia Removal Facility And Drainage Imp.

Closed
IFB 6100 CLMC1165State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
FDC-214-102565.1
Solicitation # FDC-214-102565
Contract FDC-214-102565.1, issued by the Commonwealth of Pennsylvania Department of Conservation and Natural Resources, involves the Phase 1 removal of a concrete dam and associated infrastructure at Ryerson Station State Park in Richhill Township, Greene County. The scope of work includes the installation and removal of erosion and sediment control measures, implementation of a traffic control plan, stripping and stockpiling of topsoil, surface water control, and the excavation and placement of select fill. The project concludes with topsoil placement and seeding of all disturbed areas to restore the site to its original condition. The engineer's estimate for this project exceeds 1 million dollars. The contract mandates strict adherence to Small Diverse Business (SDB) and Veteran Business Enterprise (VBE) participation goals of 19 percent and 3 percent, respectively. Bidders must provide a lump sum bid and are required to secure performance and material and labor payment bonds at 100 percent of the contract amount, as well as a maintenance bond at 50 percent. Technical compliance is governed by the General Conditions for Construction 2022 Edition and various ASTM standards for soil compaction and classification. Payments will be processed via Automated Clearing House (ACH) through the Commonwealth's procurement system.
Commonwealth of Pennsylvania - Department of Conservation and Natural Resources

POSTED

about 8 hours ago

DEADLINE

in 16 days
NAICS: 237990
New
SLED
Design Build Services For 8 New Pickleball Courts With Lighting
Solicitation # S-1397
The City of Garden Grove is soliciting Statements of Qualification for a design-build project to construct eight new pickleball courts with lighting at Garden Grove Park. The scope of work encompasses all labor, materials, engineering, and construction services, including permitting, site preparation, surfacing, striping, fencing, and electrical infrastructure. All improvements must be ADA-compliant and adhere to the California Public Contract Code and Garden Grove Municipal Code. The estimated construction cost is between 1,000,000 and 1,200,000 dollars, with a guaranteed maximum price not to exceed 1,200,000 dollars. The procurement follows a two-step selection process. In the first step, the city will evaluate Statement of Qualifications based on experience, professional qualifications, technical capabilities, project team, safety record, financial capability, and demonstrated performance to shortlist the three highest-scoring firms. These firms will then advance to a second step to submit a proposal for a best-value award. Interested entities must submit their SOQ via the Planet Bids portal by November 20, 2026. Mandatory requirements include a certification form, a firm information form, and a surety declaration demonstrating the capacity to obtain performance and payment bonds for 100 percent of the project value from a surety with an AM Best rating of A- Class VII or better.
City of Garden Grove

POSTED

about 9 hours ago

DEADLINE

in 24 days

AI Contract Overview

Show more

The City of Austin is seeking bids for the construction of an on-site Ammonia Removal Facility at the Hornsby Bend Biosolids Management Plant to treat high-strength ammonia and nitrogen side streams generated from anaerobic digestion of wastewater sludge. Currently discharged into the on-site pond system, this effluent must be treated to meet environmental regulatory standards, with the new facility projected to reduce ammonia loads by 80 to 90 percent. The project also includes essential drainage and stormwater management upgrades to support the facility’s operation and ensure proper site hydrology. The work is structured under CIP IDs 3164.125 and 3164.094, which are being bundled and bid together as a single project. The solicitation, identified as IFB 6100 CLMC1165, has a response deadline of August 6, 2026, and is open to local contractors with an NAICS code of 237990. The total estimated contract value ranges from $6.4 million to $8.0 million, anchored by a $6.07 million lump sum allowance for the ANITA MOX® MBBR deammonification system, along with supplementary allowances for the equalization basin mixer, contaminated soil and water removal, rip rap, and security upgrades. The contract is structured as a fixed-price arrangement, with payments based on unit prices and mobilization timelines, and is subject to a 25 percent maximum increase without contractor consent. The performance requirements are rigorous and comprehensive, demanding the installation of a 60x70-foot concrete equalization basin, a three-pump transfer lift station, and all associated mechanical, electrical, and control systems, with full operational testing and certification mandated. Equipment must meet UL, CSA, NEC, OSHA, and other industry standards, and includes stringent labeling, spare parts provisions (10 percent of each item or minimum two units), and long-term warranties—10 years for door closers and five years for panic hardware. All construction personnel must hold OSHA 10-hour certification, and submittals must include detailed shop drawings, operational and maintenance manuals, factory test reports, and seismic certifications. The contractor must also comply with MBE and WBE participation goals through a documented compliance plan, with good faith efforts required if targets are not met. The place of performance is the Hornsby Bend facility in Austin, Texas, with materials delivered to the

General Info

City of Austin to build ammonia removal facility and drainage upgrades at Hornsby Bend to reduce ammonia by 80–90%.

Place of Performance

Not specified

Set-Aside

NONE

Documents

5

Solicitation CLMC1165 Hornsby Bend BMP Process Ammonia Removal Facility Volume 1 of 3

PDF, High priority: read this firstrfb
High

Solicitation CLMC1165 Volume 3 of 3 - MBE/WBE Procurement Packet

PDF, High priority: read this firstrfb
High

Solicitation Documents Volume 2 of 3 - Hornsby Bend BMP Process Ammonia Removal Facility

PDF, High priority: read this firstspecifications
High

Pre-Bid Attendance List for CLMC1165-Hornsby Bend Ammonia Removal Facility

PDF, Low prioritypre-bid-attendance-list
Low

Plans/Drawings

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → City of Austin
Contacts3 people available
OfficeTX
Organization / AgencyTexas → City of Austin
Office AddressTX
Contacts
Jules ParrishProject Related Questions
Veronica HawkinsSmall Minority Business Resources Questions

Full Description

Show more
The anaerobic digestion process to treat wastewater sludge produces a side stream with high ammonia and nitrogen concentrations. This side stream flow is from the Dewatering Facility which currently discharges directly to the on-site pond system. To treat this high strength ammonia and to meet environmental regulatory requirements a new on-site Ammonia Removal Facility is required. It is projected that this facility will significantly reduce the high ammonia load by 80 to 90%. Improve existing drainage and storm water management systems at Hornsby Bend Biosolids Management Plant. These drainage improvements are required to provide positive drainage for the proposed (future) Ammonia Removal Facility (3164.125). CIP 3164.125 and 3164.094 are being permitted and bid together as one project.

More opportunities from Texas → City of Austin

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS