HSDR Project Patrick Air Force Base, Mid-Reach and South Reach Segments

Closed
W912EP19Z0567Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

General Info

NAICS

237990 - Other Heavy and Civil Engineering Construction

Place of Performance

FL

Set-Aside

NONE

Documents

1

RFI_BrevardProjectMap.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

2 updates
PhaseClosed
Posted

Sources Sought

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W074 Endist Jacksnvlle
Contacts1 person available
OfficeJACKSONVILLE, FL, 32207-0019, USA
Office AddressJACKSONVILLE, FL, 32207-0019, USA
Contacts
William WallaceContract Specialist

Full Description

Show more
This notice constitutes a REQUEST FOR INFORMATION (RFI). This announcement seeks information from industry and will ONLY be used for preliminary planning purposes. THIS IS NOT A SOLICITATION FOR PROPOSALS AND NO CONTRACT SHALL BE AWARDED FROM THIS RFI. Respondents will not be notified of the results of the evaluation. The Government will not pay for any response expenses. Interested parties are responsible for adequately marking proprietary or competition sensitive information contained in their response. The Government is specifically interested in technologies, ideas and solutions for the construction of Patrick Air Force Base (PAFB), Mid-Reach and South-Reach Segments of the Brevard County Hurricane Storm Damage Reduction (HSDR) project. The information received will be used to support a market analysis for the project with an overall goal to reduce risk and increase efficiency and successful execution of the project. Project Description Project consists of placement of beach compatible material along 16 miles coastline in Brevard County Florida. The project is broken into three segments: Patrick Air Force Base (PAFB), Mid-Reach, and South-Reach with a total combine yardage for all three projects is approximately 1.14 million cubic yards. PAFB is a 3.7 mile long project between monuments R-55 and R-75.4 placing a total volume of approximately 350,000 CY from Canaveral Shoals II offshore borrow area. PAFB project is split between two segments. The northern 1.9 mile PAFB segment (R-55 to R-65) will hydraulically place approximately 235,000 cubic yards (CY) by conventional hydraulic placement with an average fill density of 25 CY /linear feet (LF). Hydraulic placement south of R-65 to R-75.4 cannot occur due to the presence of emergent nearshore rock outcrops. Therefore, a stockpile area on the beach is provided between R-61 to R-65 which can be hydraulically stockpiled with up to 90,000 CY. The stored material can then be mechanically transferred via truck haul on the beach or A1A to place approximately 115,000 CY as beach and dune fill between R-65 and R-75.4. The Mid-Reach project is a 7.8 mile small-scale beach fill project which begins at the south end of Patrick Air Force Base, approximately 16 miles south of Cape Canaveral, and spans 7.8 miles of shoreline between Monuments R-75.4 and R118.3 ending just north of the Town of Indialantic. The volume to place is approximately 280,000 CY with an expected fill density between 2 to 10 CY/FT. Hydraulic placement within Mid-Reach is prohibited. Beach quality sediment can be attained from a South Reach beach stock pile constructed for the purpose. The south reach stockpile area is approximately 8 miles south of the Mid-Reach placement site with a maximum and minimum distance of 11.6 miles and 4 miles, respectively. The stockpile area can be hydraulically filled and then mechanically transferred to the placement area along Highway A1A only. Once delivered to the Mid Reach sand will be offloaded at construction access/staging areas before being distributed by off road dump truck. A residual beach fill of approximately 65,000 CY (above the 280,000 CY mid reach volume) will be left within the stockpile area at the south end of the South Reach after the truck haul is completed. Stockpile geometry and approximate volume is shown in the attached drawings. Up to 80,000 CY for the Mid Reach beach fill may be obtained from upland sand sources containing beach quality sand meeting Corps specifications. The South Reach is a 3.8 mile long project between R-monuments 118.3 and R-139. The South Reach can be constructed using conventional hydraulic placement via hopper dredge. The South Reach fill quantity is expected to be approximately 465,000 CY with an average fill density of 22.3 CY/LF that ranges between 12 CY/LF to 37 CY/LF. The borrow source for PAFB, South Reach, and the South Reach Stockpile area is Canaveral Shoals II. The Canaveral Shoals II Borrow Area is located east of Cape Canaveral, and is centered approximately 4.5 miles offshore of Cape Canaveral Air Force Station (CCAFS) and 8 miles from Port Canaveral. The PAFB beach fill element of the project (350,000 cy) shall be an Option for which award will be made by 1 October 2019 and completion of the project construction by 30 April 2020 Project Location Brevard County is located on Florida's central east coast bordering the Atlantic Ocean just south of Cape Canaveral. The Brevard County shoreline is a barrier island approximately 72 miles long separated from the mainland by the Mosquito Lagoon and Banana River to the north and the Indian River Lagoon, and extends the length of the county. Access to the Atlantic Ocean is provided at Cape Canaveral to the north and Sebastian Inlet to the south. Estimated Magnitude of Construction $25,000,000 to $35,000,000 Estimated Period of Performance (After Notice to Proceed) Total Period of Performance is 245 days. Any work or equipment activity seaward of the dunes is limited from November 1st to April 30th. Responses Industry is asked to provide a response to this RFI and shall be limited to 10 pages where the major objectives of this RFI are to: 1) Firm's name, address, point of contact, phone number, website, and email address. 2) Obtain information if a Firm is interested in bidding on the solicitation as an invitation for bid (IFB) or Request for Proposal (RFP) when the contract is issued. 3) It is the intent of the government to have the material placed in one placement season. Obtain a list of assurances or needs for bidders, if a contract of this magnitude and complexity can be completed in one placement season. A placement season is November 1st to April 30th where any work on the beach cannot occur. This includes demobilizing pipe or trucks on the beach. a) Understand the type, size, and number of support vessels needed to complete this project in one placement season. b) Obtain information what is needed by bidders prior to advertisement. 4) Gain knowledge if using tonnage for placement at Mid-Reach is the best method for payment for truck hauling material from the beach stockpile area to the placement area. Please note, it is the intention of the government not to pay for material placed at the stockpile pit, but for residual beach fill quantity once the stockpile area is no longer needed. 5) To reduce the cost of multiple mobilizations, understand if firms are interested in bidding on the solicitation if the Alternates were introduced. Alternate A would consist of dredging only with no upland mines and Alternate B would consist of Placement in two seasons with the second season only consisting of placement using truck haul only on Mid-Reach segment. Please note, it is the intention of the government not to have two dredging seasons. a) If Contract was broken out into these Alternates, obtain a clearer understanding on how to breakout contract tonnages for placement within Mid-Reach between Alternate A and Alternate B. b) Provide an understanding what would make this a preferred approach. 6) Gain knowledge on how stock pile areas provided could be adapted to support contractor's operations, such as widths of access, beach heads, excavation limits. Include in this discussion where the use of weight stations would be implemented. 7) Gain understanding what size hopper dredge/s size could complete this job. 8) The government's intention is to restrict hopper dredges with a size limit no smaller than 3,500 cubic yards. Based on this constraint, does this make the requirement too restrictive and/or jeopardize the project? If so, why? Additionally For interested Offerors, Conference Call is rescheduled to 17 April 2019 at 10:00am. This is your opportunity to ask questions and to make sure that you have an understanding of what this requirement entails prior to your response submittal. The Conference Call In Numbers are listed below: USA Toll Free: +1 (555) 000-0000 Access Code: 6546236 Security Code: 2873 Responses to this RFI must be received no later than 30 April 2019 at 2:00pm and shall be sent to William Wallace at contact@example.gov NOTE - DO NOT SUBMIT PROPRIETARY AND/OR BUSINESS CONFIDENTIAL DATA. All interested parties shall respond in as clear manner as possible to each of the areas listed above. Information is preferred in soft-copy form in Microsoft Word and shall not exceed 10 pages. The official Synopsis citing the solicitation will be issued on Federal Business Opportunities WWW.FBO.GOV and inviting firms to register electronically to receive a copy of the solicitation when it is issued. All interested firms must be registered in SAM.gov to be eligible for award of Government contracts.

More opportunities from Department Of Defense → W074 Endist Jacksnvlle

Same awarding agency

NAICS: 541620
New
Federal
Notice of Intent to solicit a single source – Fish and Macroinvertebrate (Nekton) Monitoring (St. Johns River)
Solicitation # W912EP-27-Q-1CTH
The U.S. Army Corps of Engineers, Jacksonville District, intends to award a sole-source contract to the Fish and Wildlife Research Institute of the Florida Fish and Wildlife Conservation Commission. The project focuses on nekton monitoring within selected zones and tributaries of the Lower St. Johns River in Northeast Florida. This effort is categorized under NAICS code 541620 for Environmental Consulting Services and is designed to assess the ecological impacts of a 2022 channel deepening project that increased the river depth to 47 feet to accommodate larger vessels for the Jacksonville Port Authority. The primary objective is to evaluate how changes in salinity and water quality resulting from the deepening affect the spawning, recruitment, and population dynamics of commercially and recreationally important species, such as blue crab, white shrimp, and red drum. Monitoring will specifically target critical habitats between river kilometers 14 and 48, as well as areas upstream of Julington Creek, to determine if shifting salinity gradients are impacting nursery habitats or resident freshwater species. This long-term sampling will provide the necessary data to gauge the overall environmental effects of the channel modifications on the estuary's nekton assemblages.
Environmental Consulting Services

POSTED

1 day ago

DEADLINE

in 13 days
View Details
NAICS: 237990
New
Federal
Tampa Harbor Improvements Industry Day
Solicitation # W912EP27Z1CUA
The U.S. Army Corps of Engineers, Jacksonville District, has issued a special notice for an Industry Day event scheduled for November 18, 2026, regarding the Tampa Harbor Improvements project. This notice is for preliminary planning purposes and is not a solicitation for proposals. The event aims to gauge the capabilities and interest of the construction community, including small businesses, for a requirement slated for a fiscal year 2028 award. The overall project is expected to span six contracts over an eight to ten-year period, with a construction magnitude estimated between 100 million and 500 million dollars under NAICS code 237990. The specific focus of this Industry Day is Contract 1, which involves construction dredging to deepen and widen various sections of the Tampa Harbor federal navigation channel. Key deliverables include deepening Cut-C (HB), Port Sutton Channel, Port Sutton Turning Basin, East Bay Channel, and Cut-D (HB) to 49 feet MLLW, the Port Sutton Terminal Channel to 44 feet MLLW, and East Bay Channel Extensions 1 and 2 to 41 feet MLLW. The scope includes widening the Port Sutton Channel, Port Sutton Turning Basin, and East Bay Channel, with an estimated dredging volume of 4.4 million cubic yards. All work will incorporate one foot of allowable overdepth, and dredged materials will be disposed of in the East Bay Placement Area, DMMA 2-D, and DMMA 3-D. Interested parties must be registered in the System for Award Management to be eligible for future awards.
Other Heavy and Civil Engineering Construction

POSTED

6 days ago

DEADLINE

in 20 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS