Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New York was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HT-224.228 (RFx 7*756) - (FEMA) - (ADV) - Holland Tunnel - Installation of Storage Facility for Flood Protection Equipment

Closed
HT-224.228 (RFx 7*756)State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Carlson Field Athletic Complex: Construction of new Pickleball Courts
Solicitation # BCP-REC-26
The Town of Hingham, Massachusetts, is soliciting sealed bids for the construction of eight new pickleball courts at the Carlson Field Athletic Complex, with an estimated project cost of $1,300,000. The scope of work includes site preparation such as the removal of trees and shrubs, re-grading, and the installation of the courts, posts, nets, walkways, benches, shade shelters, and ADA pathways. Additionally, the project requires a new asphalt parking lot and the installation of solid AF-6 Acoustifence Panels around the entire perimeter for sound attenuation. The contractor is responsible for maintaining construction fencing and erosion control, coordinating closely with the Town and the demolition contractor, Pasquazzi Bros, Inc. The contract will be awarded to the lowest responsible and eligible bidder who possesses at least seven years of experience constructing sports courts or similar athletic facilities. Bidders must provide a statement of qualifications, including three similar public project examples and three references, one of which must be a Massachusetts municipality from the last two years. This is a lump sum, fixed-price contract with no escalation for fuel, labor, or materials. Compliance with Massachusetts prevailing wage laws, OSHA regulations, and the Massachusetts Building Code is mandatory. Bids must be submitted electronically via the OpenGov portal by November 3, 2026, at 9:00 am, and must include a 5% bid security.
Recreation

POSTED

about 11 hours ago

DEADLINE

in 4 days

AI Contract Overview

Show more

The contract pertains to the construction of a new storage facility west of the Holland Tunnel Toll Building in Jersey City, New Jersey, for the storage of flood protection equipment under the Port Authority of New York and New Jersey. The scope includes comprehensive site development such as regrading, concrete pavement and footings, structural steel erection, an ornamental fence, standing seam metal roofing, lighting systems, and infrastructure to support access control and security cameras. All work must adhere to strict technical standards from ASTM, AASHTO, NFPA, and MUTCD, with performance metrics defined for compaction, density, surface smoothness, and material tolerances. Materials must meet precise packaging and labeling requirements, including traceable batch and lot numbers, manufacturer details, compliance statements, and temperature controls for thermoplastic and epoxy materials. Delivery and installation are subject to environmental conditions such as minimum ambient and surface temperatures, dry surfaces, and no precipitation during application. The contractor is obligated to complete all work within 571 calendar days after bid acceptance, with final acceptance occurring on-site and determined solely by the designated Engineer, who holds full authority to inspect, approve, or reject work. Payment is to be processed electronically via the Office of the Chief Procurement Officer at 4 World Trade Center, New York, NY, though no total contract value is disclosed. Compliance with labor standards, diversity goals including 20% MBE, 10% WBE, and 3% SDVOB participation, and mandatory certifications such as debarment clearance, lobbying disclosure, non-collusion, and participation in a DOL-approved apprenticeship program are required. Personnel must obtain SWAC credentials and complete information security training for access to restricted areas, with strict adherence to non-disclosure agreements and conflict of interest prohibitions. All proposals must be submitted electronically through the Bonfire platform by June 16, 2026, with no physical submissions accepted. The contract is structured as a lump sum arrangement, with modifications requiring written and signed authorization, and compensation for delays or suspensions is conditional and limited to specific circumstances defined in the contract clauses.

General Info

Construction and installation for Jersey City flood protection storage facility, including pavement, steel, fencing, and security.

Documents

8

Addendum No. 1 to Contract HT-224.228 Installation of Storage Facility for Flood Protection Equipment

PDF, High priority: read this firstamendment
High

Addendum No. 2 to Contract HT-224.228 Installation of Storage Facility for Flood Protection Equipment

PDF, High priority: read this firstamendment
High

HT-224.228 Contract Drawings Vol 1 of 2

PDF, High priority: read this firstcontract-drawings
High

HT-224.228 Holland Tunnel Storage Facility Flood Protection Equipment Advertisement

PDF, High priority: read this firstadvertisement
High

HT-224.228 Installation of Storage Facility for Flood Protection Equipment Contract Booklet

PDF, High priority: read this firstcontract-document
High

Notice to Bidders for Contract HT-224.228 Flood Protection Storage Facility

PDF, High priority: read this firstnotice-to-bidders
High

Notice to Bidders for Contract HT-224.228 Holland Tunnel Flood Protection Storage

PDF, High priority: read this firstnotice-to-bidders
High

HT-224.228 Available Documents

PDF, Low priorityother
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew York → Port Authority Of Ny & Nj
Contacts1 person available
OfficeNY, USA
Office AddressNY, USA
Contacts
Megan Lancelot-Zielinski

Interested Companies (42)

VMR Civil
Unicorn Construction
Gov AlphaBrooklyn, New York

See All 42 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Summary Description of Work: regrading, concrete pavement and footings, structural steel, ornamental fence, standing seam metal roofing, lighting, infrastructure for access control, security cameras and related Work at the new storage facility west of the Holland Tunnel Toll Building and vicinity thereof, Jersey City, New Jersey

More opportunities from New York → Port Authority Of Ny & Nj

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS