The contract entails performing maintenance dredging at the South San Francisco Ferry Terminal, with an option for additional dredging at Oyster Point Marina Dock 11 and Guest Dock. The scope of work includes disconnecting, removing, storing, and protecting the existing ferry loading float and temporarily supporting the permanent gangway using existing piles according to provided technical guidelines. The permanent ferry loading gangway and float will be transported to a designated berthing location within the South San Francisco Facility. Sediment dredged from the site must be disposed of at specified Army Corps of Engineers-approved sites, including Disposal in Bay (SF-11), Cullinan Ranch, or Montezuma. All work is to be completed within a defined period from June 1, 2026, through November 30, 2026. The contractor is required to submit a detailed schedule with their bid. After dredging, the permanent gangway and ferry float system will be reinstalled, and all utilities disconnected by the contractor will be reconnected, restored, and inspected. The project also includes hydrographic surveys conducted before and after the dredging, as well as condition surveys, to ensure compliance with contract requirements. The solicitation is issued by the San Francisco Bay Water Emergency Transportation Authority, with responses due by June 23, 2026.
General Info
Agency
NAICS
Place of Performance
CA, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Interested Companies (2)
Full Description
Base Scope of Work - South San Francisco Ferry Terminal: - Disconnection, removal, storage and protection of the existing ferry loading float. - Disconnection, lift, and temporarily support existing permanent gangway in place, in accordance with Lifttech memorandum provided in Attachment G, utilizing existing piles. - Transportation of permanent ferry loading gangway and float to a berthing location within the South San Francisco Facility. - Dredging and disposal of sediments at one of the Army Corps of Engineers disposal sites: Disposal in Bay (SF-11), Cullinan Ranch or Montezuma. - Complete all work within the following work window: June 1, 2026 to November 30, 2026.Contractor shall submit a schedule when submitting their bids. - Reinstallation of permanent gangway and ferry float system including reconnection, restoration and inspection of all Contractor-disconnected utilities as necessary. - Hydrographic Surveys, including pre, post and conditions surveys as detailed in the Contract Documents.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS