Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

HVAC Design & Installation

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

This subcontract for HVAC Design and Installation involves the installation and upgrading of heating, ventilation, and air cooling systems for prime contractors supporting City of Lebanon, NH recreation projects. The scope of work includes evaluating existing systems for code compliance, designing and installing new AC systems, and upgrading heating plant components and ventilation ductwork. All work must adhere to the 2018 International Energy Conservation Code and ASHRAE standards to ensure the delivery of a fully operational, code-compliant system. Managed by the Recreation, Arts, and Parks agency in New Hampshire under NAICS code 238220, the project was posted on November 19, 2026, with a response deadline of December 18, 2026. There is no specified set-aside status for this contract.

Documents

This scope was carved out of 2026-RFx-064.

The full solicitation package (7 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Storrs Hill Lodge Renovation - MEP

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Due in 29 days

Read the full solicitation package

This scope is part of a larger contract. Its documents live on the prime.

  • 7 documents on the prime contractFrom Storrs Hill Lodge Renovation - MEP
Read the prime's documents

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyNew Hampshire → Recreation, Arts, and Parks
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs and upgrades heating, ventilation, and air cooling systems for prime contractors on City of Lebanon, NH recreation projects. Evaluates existing systems for code compliance, designs and installs new AC systems, and upgrades ventilation ductwork and heating plant components. Work must comply with 2018 International Energy Conservation Code and ASHRAE standards. Delivers a fully operational, code-compliant HVAC system.

Similar Contracts

Same NAICS industry code

NAICS: 238220
New
SLED
Install Pier D High Pressure Air System, NSBREM-724-A
Solicitation # N4425527RB003
The Install Pier D High Pressure Air System project (NSBREM-724-A) is a Design-Build effort located at the Puget Sound Naval Shipyard in Bremerton, Washington. The scope of work involves the design, construction, and commissioning of a permanent high pressure air (HPA) system at Pier D, B724A of Naval Base Kitsap. Key requirements include incorporating the existing HPA cross connection into a system supplied by HPA compressors at the south end of Pier D and providing HPA to shore risers at five specific bollard locations (East #11, #59, #101, and West #47, #59). All new piping must be installed under service grates with all valves located topside. The project is estimated to have a construction magnitude between $1,000,000 and $5,000,000, with a period of performance of 538 calendar days from the date of award. This solicitation is a 100% set-aside for 8(a) businesses located within SBA Region X, which includes Alaska, Idaho, Oregon, and Washington. The basis of award is the proposal determined to be most advantageous to the Government, evaluated based on price only with MACC past performance. The contractor is required to adhere to strict safety and design standards, including EM 385-1-1, UFC requirements, and ASME codes. Security is a primary concern, requiring specific base access badges, background checks, and the integration of cybersecurity for facility-related control systems. Liquidated damages for construction delays are set at $500.00 per calendar day.
Bristol Alliance of Companies

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238220
New
SLED
Rend Lake Resort - propane tanks
Solicitation # 27-422DNR-DIREC-B-54948
The Illinois Department of Natural Resources is seeking a vendor to provide labor, parts, and supplies to repair, upgrade, and expand the propane tank infrastructure at the Wayne Fitzgerald State Recreational Area (Rend Lake Resort) in Whittington, Illinois. This project is necessitated by HVAC system upgrades following a large renovation. The scope of work includes the installation of four new 1,000-gallon propane tanks—three at the Conference Center and one at the Flagship Botel—as well as the replacement of the propane tank manifold system at the restaurant location. Additionally, the vendor must refurbish six existing tanks by replacing valves, gauges, and regulators, install eight first-stage regulators, and perform cleaning, surface preparation, painting, and placarding for eight existing tanks in accordance with Office of the State Fire Marshall requirements. The prime contractor is required to complete a minimum of 51% of the work. All equipment and installations must meet industry standards and be fully compliant with all regulations. The vendor must maintain General Commercial Liability insurance of $1,000,000 per occurrence and Worker's Compensation Insurance as required by law. Payments will be made according to the State Prompt Payment Act, with invoicing typically occurring at the completion of the contract. This contract is issued by the Office of Land Management and is subject to the Illinois Freedom of Information Act and prevailing wage laws. No specific set-aside status is designated for this solicitation.
LNDMGMT422 - Office of Land Management

POSTED

about 3 hours ago

DEADLINE

in 12 days
View Details
NAICS: 238220
New
Springdale JCC –Recreation HVAC Repair or Replacement
Solicitation # springdale-jcc-recreation-hvac-repair-or-replacement
The Career Systems Development Corporation is seeking quotes for the repair or replacement of two failed 25-ton AAON rooftop HVAC units (Model RH-25-2-00-222) at the Springdale Job Corps Center in Troutdale, Oregon. It is suspected that the heat exchangers on both units have failed. Bidders must provide two separate quotes—one for repair and one for replacement—including itemized pricing for parts and labor, a description of work with exclusions, and a professional recommendation on the most suitable approach based on cost, unit age, and parts availability. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). Replacement of the units is subject to Davis-Bacon Act Wage Determination OR20260100, R.1, while repairs are subject to Service Contract Act Wage Determination 2015-5563, R.28. Quotes must include an Oregon CCB contractor's license number and remain valid for 90 days from the closing date. For replacement quotes, all necessary installation components such as cranes, roof supports, and curb adapters must be included. Required warranties include one year for parts and workmanship, and five years for the compressor and thermostat. Payment and Performance bonds are required for any quotes totaling $100,000 or more. The response deadline is December 11, 2026.
Career Systems Development Corporation

POSTED

about 3 hours ago

DEADLINE

in 21 days
View Details
NAICS: 238220
New
Los Angeles Job Corps- Sprinkler Head Repairs
Solicitation # LA JCC Lobby Sprinkler Repairs
Management & Training Corporation is seeking a subcontractor to perform sprinkler head repairs at the Los Angeles Job Corps center located at 1020 South Olive Street, Los Angeles, California. The scope of work involves furnishing and installing one additional fire sprinkler head in the lobby area to extend existing coverage, which includes extending and connecting piping from the existing system above the T-bar ceiling. The contractor must provide all labor, supervision, materials, and safety measures, including the use of a man lift, with rental costs included in the lump sum bid. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). The solicitation is under NAICS code 238220, and the award will be based on best value as determined by MTC. Interested offerors must submit a bid sheet with a lump sum fee, a completed supplier packet including a W-9 and self-certification form, three references for projects of similar scope, and proof of insurance. Subcontractors are required to acquire a Unique Entity Identification number for reporting per FAR 52.204-10. The contract is subject to Service Contract Labor Standards under Wage Determination No. 2015-5613 Rev 31. Invoicing should be submitted to MTC on a weekly or bi-weekly basis and must include the purchase order number and a breakdown of service dates.
Los Angeles Job Corps

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details

More opportunities from New Hampshire → Recreation, Arts, and Parks

Same awarding agency

New
SLED
Storrs Hill Lodge Renovation - MEP
Solicitation # 2026-RFx-064
The City of Lebanon is soliciting Design-Build proposals for the renovation of the Mechanical, Electrical, and Plumbing (MEP) systems at the Storrs Hill Ski Lodge located at 60 Spring Street, Lebanon, NH. The project involves the evaluation of existing heating, ventilation, plumbing, electrical, fire alarm, and communications systems to ensure code compliance and suitability for reuse. The contractor is responsible for designing and installing upgrades to meet current codes, providing air cooling, and accommodating new rooms, equipment, and fixtures. Key deliverables include a comprehensive system assessment, cost-effective upgrade options, and a detailed Cost Not to Exceed quote. Performance milestones include substantial completion by July 30, 2027, and final completion and acceptance by August 27, 2027. Proposals must be submitted via the OpenGov portal by December 17, 2026. Award quantities will be determined based on final bid pricing and budget limitations. The contractor must adhere to NHDOT Roadway Standards, 29 CFR Part 1926 safety regulations, and DOT Federal Motor Carrier Safety Regulations. Required insurance includes Workers' Compensation, Employer's Liability, Comprehensive General Liability, and an installation floater, with a minimum financial rating of A- or better. Payment terms are net thirty days following the receipt of a correct invoice. This solicitation is not set aside for any specific category of business.

POSTED

about 7 hours ago

DEADLINE

in 28 days
View Details
New
SLED
Storrs Hill Lodge Renovation - Site Work
Solicitation # 2026-RFx-065
The Storrs Hill Lodge Renovation - Site Work project, solicitation 2026-RFx-065, is a construction effort managed by the New Hampshire Recreation, Arts, and Parks agency for the City of Lebanon. The project aims to refurbish the Storrs Hill Ski Lodge, which requires updated interior conditioned space and improved kitchen and toilet facilities to meet current usage levels. The scope of work for the site contractor includes the installation and maintenance of temporary erosion and stormwater control measures, as well as the backfill and compaction of all fill materials. Specific line items for the bid include rough excavation, drainage piping, concrete work, micro grading, and final grading and lawn. The project must adhere to NHDOT Roadway Standards, U.S. Department of Transportation Federal Motor Carrier Safety Regulations, and OSHA safety and health regulations under 29 CRF Part 1926. Substantial completion is expected by July 30, 2027, with final completion and acceptance by August 27, 2027. Bidders must submit proposals through the City of Lebanon eProcurement Portal by December 17, 2026. The contract requires the provision of bid, performance, and payment bonds, and mandates compliance with equal employment opportunity requirements. Invoices are due monthly by the third Friday of the following month, with payment terms set at net thirty days. There is no set-aside status specified for this solicitation.

POSTED

about 7 hours ago

DEADLINE

in 28 days
View Details

Get AI-powered intelligence on this solicitation and the ones like it

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS