This Government Contract opportunity from Mississippi was posted on July 13, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HVAC Equipment Replacement – Air Handling Unit (PAHU)
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the complete removal and replacement of the Primary Air Handling Unit at Cadence Bank Arena, encompassing all necessary steps including disconnection of the existing unit, rigging and safe transportation, installation of the new HVAC equipment, and full recommissioning to ensure operational integrity. The scope requires specialized technical expertise to handle the complexities of integrating a new primary air handling unit into an active facility without disrupting critical operations, with strict adherence to safety, compliance, and performance standards. Issued under the NAICS code 238220 for HVAC installation, this subcontract is managed by MPTAP through the Mississippi agency, with responses due by July 23, 2026. The work must be performed at the designated location within the arena, and contractors are expected to coordinate logistics, scheduling, and post-installation testing to meet operational requirements. While no set-aside preferences or point of contact information are provided, interested parties must submit proposals before the deadline to be considered for award.
General Info
Agency
NAICS
Place of Performance
MS, USASet-Aside
Documents
(0)AI Contract Breakdown
Uniform Contract FormatNo contract breakdown available.
Cannot generate Contract Breakdown because no documents were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
More opportunities from Mississippi → MPTAP
Same awarding agency
