HVAC Replacement at USCG STA Washington
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract governs the complete replacement of the HVAC system at U.S. Coast Guard Station Washington located at Joint Base Anacostia-Bolling in Washington, DC, under a Firm-Fixed Price arrangement. The work requires the contractor to perform detailed heat load calculations using the existing ductwork to determine properly sized indoor and outdoor units, ensuring compatibility with the current infrastructure. All new equipment must use EPA-approved A2L refrigerants, preferably R-454B, and involve pulling entirely new line-sets including suction and liquid lines, installing a new liquid line drier indoors near the air handler to mitigate corrosion, and removing and disposing of all existing units with no refrigerant remaining. The contractor must replace all wiring and conduit from existing disconnects to the new equipment, upgrading any corroded components and installing fused disconnects where needed. Thermostat wiring throughout the system must be replaced with UV-rated wire, and the existing thermostat must be upgraded to match the new system’s functionality. All work must be completed within 30 calendar days of award, with performance beginning no later than 10 days after notification to proceed, and must comply with OSHA standards and manufacturer specifications. The system must pass rigorous pressure and vacuum tests, achieve correct CFM airflow through Test and Balance, and be formally accepted at the site by the Contracting Officer’s QAE Representative. The solicitation is a total small business set-aside under NAICS code 238220, with a size standard of $19.0 million, restricting eligibility to small businesses that self-certify their status. All offerors must maintain an active Unique Entity ID in SAM.gov and comply with federal reporting requirements, including executive compensation disclosures and affirmative action obligations. Security protocols mandate that all personnel provide full personal identification details five days before work starts to obtain site access passes, and all vehicles must be labeled with the contractor’s name and display valid licenses and inspections. Contractor safety programs require prior approval from the Base Safety Officer, and environmental compliance with 40 CFR is mandatory. The government retains final inspection and acceptance authority at the site, and all modifications must be in writing. Invoices must be submitted electronically via the Invoice Processing Platform (IPP), with prompt payment provisions for small business subcontractors enforced. Contractual clauses cover differing site conditions, material and workmanship standards, accident prevention, permits, and dispute resolution, with specific emphasis on safety, environmental, and administrative compliance. The contract explicitly prohibits oral changes and requires strict adherence to site access, work hours
General Info
Agency
Contract Value
$61,830NAICS
Place of Performance
Bolling AFB, DC, 20032, USASet-Aside
Awardee
Award Issued Date
Timeline
Submission Closed
Organization & Contact Information
Full Description
HVAC replacemet in accordance with the Attached SOW, to include:
a. Determine heat load calculations for the HVAC system using installed ducting system. Use heat load calculations to determine an appropriate size/capacity for indoor and outdoor units utilizing installed ducting. Provide owner with a written copy of load calculations. If it is determined that any duct work needs to be modified, changed or resized in any way due to the heat load calculations, contractor shall provide and install. New unit shall be EPA approved A2L based refrigerant either R-454B or R-32, preferably R-454B. Contractor shall pull and entire new line-set to include new suction lines and liquid lines that run from heat pump to air handler. Contractor shall install a new liquid line drier for each circuit and locate the new liquid line drier indoors near the air handler to prevent unnecessary corrosion from outside elements.
b. Remove and dispose of the current outdoor and indoor units. Unit will not have refrigerant in it.
c. Replace wiring and conduit from existing service disconnects to new pieces of equipment. Replace any corroded or damaged conduit or wiring found during the demo of existing equipment. If disconnects are not fused, then contractor shall replace any and all associated disconnects with new fused ones.
d. Replace all thermostat control wiring inside and outside with new UV rated wire. Provide and replace existing thermostat to match the system function.
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 650+ contractors already using CLEATUS