This Solicitation opportunity from Texas was posted on October 1, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
HVAC Replacement District wide
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Granbury Independent School District is soliciting proposals for the district-wide replacement of 49 to 50 HVAC units. The scope of work includes the removal and disposal of old units and debris, as well as the potential replacement of ceiling tiles, grids, ductwork, plenums, and curbs. Selected vendors must handle all necessary roof work, electrical, drain piping, gas piping, and the integration of thermostats and control wiring into the existing Trane SC/Ensemble and Niagara systems. All services must be performed by licensed contractors who are responsible for obtaining all required permits. New self-contained units must be fully connected to existing utilities and controls, and must include a standard warranty of at least five years for parts and one year for labor. Proposals for solicitation 2024-17 are due by October 14, 2024.
General Info
Place of Performance
TX, USASet-Aside
Documents
0AI Contract Breakdown
Uniform Contract FormatNo documents to break down
The breakdown needs solicitation documents. None were found from this contract's source.
Timeline
Submission Closed
Organization & Contact Information
Full Description
We are requesting a proposal for replacement of 49-50 HVAC units.
Each unit will require removal and haul off of the old unit and any trash.
It may require removal and replacement of ceiling tile, ceiling grid, duct work, plenums, controls, curbs, and anything else needed to removed and replaced the old units with the new unit.
HVAC units may require curb adaptors, roof work, electrical, drain piping, gas piping, t-stats, and control wiring to existing Trane SC/ ensemble system as needed on each unit. The current control system which is the trance SC/Ensemble and Niagara. All work is to be completed by licensed contractors to Granbury ISD's satisfaction. All permits are the responsibility of the contractors. All self-contained units must be connected to existing drain lines, electrical, gas and controls. All new units will come a standard warranty of at least 5 year parts and 1 year labor.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
