Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on April 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

HVAC System Maintenance Services

Closed
HVAC System Maintenance ServicesState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 334412
New
Federal
MULTI-PURPOSE SERVE
Solicitation # SPRMM126QGF14
Solicitation SPRMM1-26-Q-GF14, issued by NAVSUP Weapons Systems Support for the Department of Defense, is a request for the manufacture and delivery of one Multi-Purpose Serve (NSN 5998-01-705-5773). The procurement is a fixed-price effort requiring the contractor to adhere to strict quality assurance and physical identification standards, specifically MIL-STD-130 Rev N. While drawings and technical data are unavailable, the item must match the design represented by Cage Code 4NCQ6. Offerors who are not the original equipment manufacturer must identify the OEM and their CAGE code, and authorized distributors must provide signed proof of authorization on company letterhead. Quotes must remain valid for 60 days and may require an informal cost breakdown to determine fair and reasonable pricing. The contract mandates rigorous packaging and marking protocols per MIL-STD-2073 and MIL-STD-129, with specific requirements for CONUS and OCONUS shipments and electrostatic discharge protection where applicable. Inspection and acceptance are conducted at the source, and the contractor is responsible for maintaining inspection records for 365 days post-delivery. Administrative requirements include the mandatory use of PIEE-WAWF for the electronic submission of combined invoice and receiving reports. Evaluation of offers will be based on the Supplier Performance Risk System (SPRS), focusing on item, price, and supplier risk, with a strict prohibition on the use of additive manufacturing unless specifically authorized. Delivery is designated for the DLA Distribution DDSP New Cumberland facility in Pennsylvania.
SPRMM1 DLA Mechanicsburg

POSTED

about 16 hours ago

DEADLINE

in 22 days
NAICS: 334412
New
Federal
CIRCUIT CARD ASSEMB
Solicitation # N0038327QAA13
Solicitation N00383-27-Q-AA13, issued by NAVSUP Weapon Systems Support Philadelphia, is a request for quotations for the overhaul, upgrade, repair, testing, and inspection of various printed circuit boards and assemblies. The scope includes five specific line items, including printed circuit boards and circuit card assemblies with NSNs 5998-01-512-3463, 015123482, 015215180, 1680-01-619-4547, and 5998-01-620-1746. The objective is to return these assets to a Ready for Issue condition. The government intends to make a single award based on a combination of price and past performance, with past performance weighted as the more important factor. The contractor is responsible for providing all labor, materials, and tooling, with a strict prohibition on the use of MIL-W-81381 wire in favor of SAE-AS22759 series wire. Key performance requirements include adherence to Repair Turnaround Times and the use of the Commercial Asset Visibility system for reporting. Quality standards are rigorous, requiring compliance with ISO 9001/SAE AS9100 and specific calibration standards such as ANSI/NCSL Z540.3. The contract includes detailed provisions for Beyond Economical Repair and Over and Above Repair determinations, both of which require written concurrence from DCMA. Packaging must meet MIL-STD-2073-1 and MIL-STD-129 standards, and all invoicing must be processed electronically through the Wide Area Workflow system.
Navsup Weapon Systems Support

POSTED

about 16 hours ago

DEADLINE

in 30 days

General Info

Documents

3

Contract No. 20240267 - Addendum No. 1 (HVAC Maintenance Services)

PDF, High priority: read this firstamendment
High

Contract No. 20240267 - Addendum No. 1 (HVAC Maintenance Services)

PDF, High priority: read this firstamendment
High

Contract No. 20240267 - HVAC System Maintenance Services

PDF, High priority: read this firstrfb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Deadline changed

Response deadline changed from Apr 23, 2024 to Apr 16, 2024.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Vernon
Contacts1 person available
OfficeN/A
Organization / AgencyCalifornia → City of Vernon
Office AddressN/A
Contacts

Full Description

Show more
General Scope of Work:1.) Quarterly maintenance (January, April, July and October) shall include: Inspect for refrigerant and oil leakage. Conduct operating checks; verify proper operation, safety switch operation, and set points. Check all alarms. Confirm that crankcase heaters are operational. Observe & note refrigerant sight glass and crankcase oil level. Confirm proper condensate drainage; connect hose and rinse all cooling coils, flush all drain pans, and drain lines each quarter. Check all fan belts for proper tension; adjust as required. For the 20-ton chiller, check integral chilled water storage tank and pump for proper operation. For boilers, verify proper heating operation, safety switch operation, set points and check alarms. Visually check chilled and hot water loop water at pot feeders (4 total). Verify proper chilled water and hot water expansion tank air cushion (bladder pressure in the event of a bladder tank) and adjust as required. Check City water make-up PRV for each chiller and boiler loop (4 total) and note make-up water pressure downstream of each PRV. Air filter replacement will be handled by City personnel and is not part of this scope of work. 2.) Annual maintenance for cooling units (the two chillers, the 50-ton Trane rooftop unit, two 12-ton Trane condensing units, and all listed air handling units) shall take place in conjunction with the spring quarterly maintenance visit. Perform quarterly tasks. Perform SCAQMD / EPA refrigerant audit. Visually check all electrical contractors and tighten exposed terminations. Wash condenser coils with water and an EPA-approved, pH-neutral coil cleaner. Wash all cooling coils with pH-neutral evaporator coil cleaner. Check pump down cycle or drop isolation solenoid operation for each refrigeration circuit. Check hot gas bypass valve operation and setting for basement air handling unit. Check temperature, operation, and safety circuits. Calibrate sensors. Inspect all contractors. Clean chilled water strainers at each penthouse air handling unit and in the 20-ton chiller. Log chiller operation. 3.) Annual maintenance for Variable Frequency Drive (VFD) controlling the Trane rooftop unit supply fan. Blow out all circuit boards with nitrogen. Wipe down inside of housing. Tighten all high-voltage terminations. Check and investigate alarms. Verify proper response to duct static pressure transducer and note transducer setting vs. measured duct pressure. 4.) Annual maintenance for the two boilers shall take place in conjunction with the fall quarterly maintenance visit. Work to include performing quarterly tasks. Fully remove the entire burner assembly. Blow out firebox and thoroughly blow out the soot on the heat exchanger tubes. Clean burners. Replace hot surface ignitors and flame sensors. Check temperature, operation, and safety circuits. Calibrate sensors. Inspect all contractors. Clean hot water strainers at each penthouse handling unit. Reassemble and log operation.5.) The City has several areas of the City Hall/PD complex that have a LON/BACnet Multi-protocol control system, graphics driven, using Smart Controls controllers. Quarterly, a four-hour on-site (not remote) control system review for the purposes of both reviewing system operation and training City staff will be included. During this review, the contractor will compare “set point” vs. “actual” operation data for each zone, as well as check overall system operation.

More opportunities from California → City of Vernon

Same awarding agency

NAICS: 237310
SLED
Atlantic Bridge Localized Pavement Repair & Bandini Blvd. Street Improvements – Indiana Street To Sunol Drive
Solicitation # 20261021046
The City of Vernon is soliciting bids for street improvements on Atlantic Bridge and Bandini Boulevard between Indiana Street and Sunol Drive, with an estimated contract value between 900,000 and 1,000,000 dollars. The scope of work includes asphalt grind and overlay, pavement removal and restoration, curb and gutter replacement, sidewalk and driveway approach replacement, and curb ramp upgrades. Additionally, the project requires the installation of traffic signal loops, relocation of pedestrian push buttons, and the furnishing and installation of a new Type 332LS Traffic Signal Cabinet Assembly with a 2070LX Controller and D4 Software. The contractor is responsible for all labor, materials, and equipment, including traffic control, survey monument preservation, and coordination with railroad agencies. All work must adhere to the 2021 Standard Specifications for Public Works Construction, 2024 Caltrans Standard Plans and Specifications, and the City of Vernon Standard Plans. The contract will be awarded to the lowest responsive and responsible bidder. Mandatory qualifications include a Class A General Engineering Contractor License from the California State License Board and a proven track record of completing at least three similar public works projects in California within the last three years. Bidders must provide a bid bond of at least 10 percent of the base bid and comply with California Labor Code Section 1720 regarding prevailing wages. The project has a strict performance timeline, requiring substantial completion within 70 calendar days from the notice to proceed. Bids must be submitted in a sealed envelope to the City Clerk's Office by 2:00 p.m. on November 17, 2026.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS