Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

HWY-1 Roadway Settlement Repair DO (EA 4X460)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Caltrans HWY-1 Roadway Settlement Repair Notice of Exemption 4X460

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Juliane SmithSenior Environmental Scientist (NEPA/CEQA Specialist)

Full Description

Show more
Caltrans proposes repairing the roadway settlement on Highway 1 at PM 10.4 in Bodega Bay that was caused by storm events and a drainage failure. The existing pavement exhibits severe cracking and a settled outside shoulder on southbound Highway 1 that is approximately 30 feet in length. Water from the winter storms seeped into the pavement cracks, oversaturating the supporting soils and leading to a collapse of the pavement. The project will construct an 85-foot-long by 40-foot-deep micropile wall as recommended by Caltrans District 4 Office of Geotechnical Design – West. A new drainage inlet (DI) about 2.5-feet to 3-feet deep will constructed within the pavement crack/settled area at the southern edge of the store parking lot. This new DI will be connected to the DI across the road on the northbound shoulder by a new 18-inch corrugated steel pipe (CSP). The existing 75-foot-long asphalt concrete (AC) dike running along the southbound shoulder will be removed and replaced with a 130-foot-long AC dike. The settled pavement area will be ground and repaved. Temporary one-way traffic control will be required during construction.

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS