Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

I-15 CAPM

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Caltrans, District 8 is undertaking a highway rehabilitation project on Interstate 15 in Riverside County, spanning from 0.4 miles south of the SR-79 interchange to 1.5 miles north of the Winchester Road interchange, covering Postmile 3.0 to PM 8.1. The work includes cold plane and overlay of the existing pavement, localized dig-outs to repair distressed sections, replacement of one nonstandard crash cushion, upgrading Metal Beam Guard Rail systems to Midwest Guardrail Systems with compliant end treatments and vegetation control, and modernizing Transportation Management System components. The primary goals are to extend the service life of the pavement, improve ride quality, and bring safety infrastructure up to current standards to address documented deficiencies in guardrails, crash cushions, vegetation management, and TMS elements. Environmental compliance is established through a CEQA categorical exemption under Class 1(d), with a certified exemption document required as part of the project documentation. The project is forecasted under the title I-15 CAPM, with no formal solicitation or contract number yet issued, indicating it is in the planning phase. Performance is limited to the specified I-15 corridor in Temecula and Murrieta, California, with inspections and acceptance conducted at the project site by Caltrans District 8. No contract value, pricing details, payment office, invoicing method, contracting officer, or COR/COTR have been specified in the available materials. There are no packaging, marking, preservation, or MIL-STD requirements, as all work is construction-based and governed by Caltrans standards and the MUTCD. No evaluation factors, proposal submission instructions, or offeror certifications are detailed, and the document does not include clause references to FAR or DFARS provisions. All administrative correspondence and environmental compliance matter are handled through Malisa Lieng, Senior Environmental Planner at Caltrans District 8, with no additional attachments or special contract requirements identified beyond the environmental exemption.

General Info

Caltrans District 8 to rehabilitate I-15 pavement, upgrade guardrails, crash cushions, and TMS in Riverside County.

Agency

California → Caltrans, District 8 - San Bernardino/Riverside

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption for I-15 CAPM Project

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 8 - San Bernardino/Riverside
Office AddressN/A
Contacts
Malisa LiengSenior Environmental Planner

Full Description

Show more
Caltrans is proposing to rehabilitate a section of Interstate 15 (I-15) in the Cities of Temecula and Murrieta, from 0.4 miles south of I-15/State Route 79 (SR-79) Separation to 1.5 miles north of Winchester Road Interchange, Postmile (PM) 3.0 to PM 8.1, in southwestern Riverside County. The project scope includes the following: • Cold plane and overlay • Perform localized dig outs • Upgrade Metal Beam Guard Rail (MBGR) to Midwest Guardrail Systems (MGS), including end treatments and vegetation control to meet current standards • Upgrade Transportation Management System (TMS) elements • Replace one crash cushion to meet current standards The purpose of this project is to preserve and extend the service life of the existing pavement and to improve ride quality. This project will also upgrade existing traffic safety systems to current standards within the project limits. This segment of I-15 has several deficiencies within the project limits. These deficiencies include distressed pavement, nonstandard guardrail and end treatments, lack of vegetation control, a nonstandard crash cushion, and inadequate TMS elements. This project is needed to address those deficiencies.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
LACSD Surface Water PFAS Removal Project No. 251, CA
Solicitation # lacsd-surface-water-pfas-removal-project-no-251-ca
The contract involves the design and construction of PFAS treatment facilities at the Bernina and Cedar Glen Water Treatment Plants in California, encompassing comprehensive civil, structural, mechanical, electrical, instrumentation, and process system upgrades to remove per- and polyfluoroalkyl substances from surface water. The scope requires integrated engineering solutions to meet evolving regulatory standards for drinking water safety, with specialized focus on advanced filtration and extraction technologies tailored to the existing infrastructure at both sites. Work will include site-specific modifications to ensure seamless operational integration while maintaining continuous water service during implementation. This solicitation, issued by Pyramid Building & Engineering, Inc., is designated for Disadvantaged Business Enterprises under the Department of Transportation set-aside program and falls under NAICS code 237310 for Water and Wastewater Pipeline and Related Structures Construction. Proposals must be submitted by September 3, 2026, with primary point of contact John Garrison available for inquiries via phone or email. The project is located entirely within California, with no specified city or zip details provided in the public record, and all contractual obligations are tied to performance at the two designated treatment plants. Participation is open to qualified firms seeking to support critical public health infrastructure improvements in compliance with state and federal water quality mandates.
Pyramid Building & Engineering, Inc.

POSTED

about 6 hours ago

DEADLINE

in 26 days
View Details