Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

I-580 Culvert Replacements (EA 04-0V190)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The California Department of Transportation, District 4, intends to replace two corrugated steel pipe culverts on Interstate 580 in Pleasanton, Alameda County. The project involves the in-kind replacement of an 18-inch diameter culvert at post mile 16.85 and a 24-inch diameter culvert at post mile 16.88. Work will include clearing and grubbing of shrubs, trenching the roadway for removal and installation, and subsequent repaving. The contractor will be responsible for replacing any damaged pavement delineation and striping. Operations will utilize a variety of equipment, including excavators, rollers, and trucks. This forecast is managed by the California Department of Transportation with Juliane Smith serving as the primary point of contact.

General Info

Caltrans District 4 will replace two steel pipe culverts on I-580 in Pleasanton.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Pleasanton, CA

Set-Aside

NONE

Documents

(1)

0V190 NOE_Signed

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Juliane SmithSenior Environmental Scientist (NEPA/CEQA Specialist)

Full Description

Show more
The California Department of Transportation (Caltrans) proposes replacing two culverts on Interstate (I-) 580 in the City of Pleasanton, Alameda County, at post miles (PM) 16.85 and 16.88. The culvert at PM 16.85 is an 18-inch diameter corrugated steel pipe (CSP) and the culvert at PM 16.88 is a 24-inch CSP. Both will be replaced in-kind. Some project elements will occur off the paved roadway. Clearing and grubbing and trimming or removal of a few shrubs may be required prior to construction. Trenching of the roadway will be required to remove and replace the culverts and then the roadway will be repaved. Any damaged or removed pavement delineation and striping will be replaced. Construction equipment may include, but not be limited to, trucks, excavators, rollers, small equipment, and hand tools.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified subcontractors, material contractors, and suppliers for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, utilities, asbestos abatement, tunneling, boring, asphalt and concrete paving, electrical work, and the installation of various piping systems and telecommunications. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters, to ensure labor harmony. Eligible bidders must possess a valid California Contractor's license and provide acceptable insurance. Small Business Enterprises and Veteran-Owned Small Business Enterprises must provide certification from the Department of General Services and the Port of Long Beach PlanetBids portal. Responsible contractors may be required to provide bonding for 100 percent of their contract value, with Kiewit reimbursing the bond premiums. This project is partially funded by multiple grants from the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Interested firms must contact the Lead Estimator to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 7 hours ago

DEADLINE

in 12 days
View Details
NAICS: 237310
New
SLED
Annual Pavement Replacement at Barbours Cut and Bayport Container Terminals - 2027
Solicitation # port-of-houston-authority-1254667
The Port of Houston Authority is soliciting Competitive Sealed Proposals for the 2027 Annual Pavement Replacement project at the Barbours Cut and Bayport Container Terminals. This project involves the replacement of damaged or deteriorated asphalt and concrete pavement across these terminal locations. Interested parties must submit their responses through the Port Authority’s Workday eProcurement System no later than 11:00 a.m. on October 7, 2026. A pre-proposal conference is scheduled for September 24, 2026, at 10:00 a.m. via Microsoft Teams, and registration for this meeting is mandatory. All submitted proposals and required documentation must remain valid for 120 calendar days following the response deadline. Bidders are required to provide a bid security equal to 5% of the highest bid or proposal amount. To receive Small Business Enterprise participation credit, contractors must submit an executed Statement of Intent for each proposed SBE, which must be signed by both the prime contractor and the SBE. This statement must detail the project, subcontract scope, and subcontract amount, while certifying that the SBE will perform a commercially useful function rather than acting as a pass-through entity. The Port Authority reserves the right to reject any or all responses received during this procurement process.
Port of Houston Authority

POSTED

about 14 hours ago

DEADLINE

in about 1 month
View Details