Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

I-580 VMS End-of-Queue Detection Installation Project (EA 3X090)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The I-580 VMS End-of-Queue Detection Installation Project (EA 3X090) is a Caltrans District 4 initiative located in Oakland, Alameda County. The project involves installing end-of-queue detection systems for Variable Message Signs (VMS) on I-580 at the approaches to Golf Links Road, specifically spanning from post mile R35.497 to R37.365. The technical scope includes the installation of Wavetronix HD sensor equipment, two sets of microwave radios, conduits, poles, and antennas. These components will be integrated with service cabinets and PG&E service to enhance traffic monitoring capabilities. Construction activities will include clearing and grubbing the right of way either on or immediately adjacent to the roadway, with some elements occurring off the paved surface. Equipment staging is required to take place within the Caltrans right of way in areas devoid of vegetation. The project has been granted a Notice of Exemption under CEQA Class 1(c) for existing facilities, indicating that no significant environmental impacts are anticipated. While the specific contract value and period of performance are not disclosed, the project follows standardized Caltrans measures and is managed by the District 4 Office of Maintenance Environmental.

General Info

Caltrans District 4 installing VMS end-of-queue detection systems on I-580 in Oakland.

Agency

California → Caltrans, District 4 - Bay Area/Oakland

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Oakland, CA

Set-Aside

NONE

Documents

(1)

3X090 I-580 VMS End-of-Queue Detection Installation Project Notice of Exemption

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 4 - Bay Area/Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 4 - Bay Area/Oakland
Office AddressN/A
Contacts
Juliane SmithSenior Environmental Scientist (NEPA/CEQA Specialist)

Full Description

Show more
Caltrans proposes installing end-of-queue detection for Variable Message Signs (VMS) on I-580 at the approaches to Golf Links Road. Construction equipment to be used includes, but may not be limited to, Wavetronix HD sensor equipment, two sets of microwave radios, conduits, poles, and antennas. The end-of-queue detection will connect to service cabinets and PG&E service. Some project elements will occur off the paved roadway. Clearing and grubbing right of way (ROW) either on or immediately adjacent to the roadway. Equipment shall be staged within Caltrans ROW in areas absent of vegetation.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 9 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS