Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 8 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from Nebraska was posted on August 27, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

I-80 District 5 High Mast Tower Replacement Project

Closed
51669State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in 2 months

DEADLINE

in 2 months

AI Contract Overview

Show more

The I-80 District 5 High Mast Tower Replacement Project is a construction solicitation issued by the Nebraska Department of Transportation, targeting the replacement of high mast lighting towers along Interstate 80 in District 5. The project is open for responses until October 2, 2025, and is expected to have a contract value ranging between 1 million and 5 million dollars. The project falls under NAICS code 237310, which pertains to highway, street, and bridge construction, indicating its focus on infrastructure improvements related to highway lighting. As a federally recognized state-level organization, the Nebraska Department of Transportation is overseeing the project, which aims to enhance safety and visibility along this section of I-80. Interested contractors can find additional details and submit proposals through the provided online link.

General Info

Agency

Nebraska Department of TransportationView Agency

NAICS

237310 - Highway, Street, and Bridge Construction View NAICS

Place of Performance

NE, USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska Department of Transportation
ContactsNo contacts available
OfficeN/A
Organization / Agency
Nebraska Department of Transportation
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
I-80, DISTRICT 5 HIGH MAST TOWER REPLACEMENT