Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on July 1, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IDC for Foundation Pressure Relief Well Engineering with Geophysical Surveying for the Great Lakes and Ohio River Division

Awarded
W91237-20-R-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

This Indefinite Delivery Contract, solicitation number W91237-20-R-0002, was awarded on July 1, 2020, to Geo Consultants Corporation for foundation pressure relief well engineering and geophysical surveying services. The project supports the Great Lakes and Ohio River Divisions and is managed by the Department of Defense through the W072 Endist Huntington office located in Huntington, West Virginia. The contract is established as a total small business set-aside under NAICS code 541330. It carries a not-to-exceed value of 25,000,000.00 dollars, providing the necessary engineering and surveying capabilities to maintain infrastructure stability within the designated performance areas.

General Info

Contract Value

$0

NAICS

541330 - Engineering Services

Place of Performance

Huntington, WV, 25701, USA

Set-Aside

SBA

Award Issued Date

Documents

1

Award Synopsis - W9123720D0011 - Geo Consultants Corporation

PDF, Low priorityaward
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

7 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 8, 2020 to Apr 22, 2020. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 22, 2020 to May 1, 2020. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from May 1, 2020 to May 4, 2020. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W072 Endist Huntington
Contacts1 person available
OfficeHUNTINGTON, WV, 25701-5000, USA
Office AddressHUNTINGTON, WV, 25701-5000, USA
Contacts

Full Description

Show more
ATTN REVISION: DUE TO RESTRICTIONS FROM COVID-19 PROTOCOL, THE GOVERNMENT WILL ONLY BE ABLE TO ACCEPT ELECTRONIC SF330'S FOR SOLICITATION W9123720R0002. DETAILS ON HOW TO SUBMIT THE PROPOSAL WILL BE FORTHCOMING IN THE NEXT FEW DAYS; HOWEVER, THE DEADLINE FOR SUBMISSION WILL REMAIN UNCHANGED. ELECTRONIC SUBMISSIONS WILL STILL BE REQUIRED TO BE RECEIVED NLT APRIL 8, 2020 AT 4:00 PM EASTERN STANDARD TIME. 1. CONTRACT INFORMATION: This contract is being procured in accordance with the Brooks Architect-Engineer (A-E) Act as implemented in FAR Subpart 36.6. Firms will be selected for negotiations based on demonstrated competence and qualifications for the required work. Foundation Pressure Relief Well and Geophysical Survey services are required for various types of civil works projects assigned to Districts within the U.S. Army Corps of Engineers, Great Lakes and Ohio River Division. Geographical boundaries for the Great Lakes and Ohio River Division include Buffalo, Chicago, Detroit, Huntington, Louisville, Nashville, and Pittsburgh Districts. One indefinite delivery contract will be negotiated and awarded with a one year base period and four, one year option periods. The amount of the contract will not exceed $10,000,000.00 over the life of the contract. Work will be issued by negotiated firm-fixed price task orders. This announcement is restricted to small businesses only. The North American Industrial Classification System code (NAICS) is 541330, which has a standard size of $16,500,000.00 in average annual receipts. Limitations on subcontracting are referenced in FAR clause 52.219-14(c)(1), at least 50 percent of the cost of contract performance incurred for personnel shall be expended for employees of the concern. A corporate Quality Control Plan will be required at the time of award. Each task order will require a task specific Quality Control Plan and if site work is required, a Site Specific Safety and Health Plan in accordance with the USACE Engineering Manual (EM) 385-1-1. To be eligible for contract award, firms must be registered in the System Award Management (SAM) at the time of submission (FAR 4.1102). Register via the SAM website at https://www.sam.gov/portal/public/SAM. PROJECT INFORMATION: The A-E services to be performed under this contract includes but is not limited to design, studies, geophysical surveys, sampling, testing, permit procurement, and other similar activities related to Relief Wells, Extraction Wells, and/or Monitoring Wells. Tasks would include but not be limited to: Establishment, rehabilitation, maintenance, and abandonment of Relief Wells, Extraction Wells, and/or Monitoring Wells; Characterization of relief well conditions through various methods including Step-Drawdown, Constant-Rate, Specific Capacity Testing, and Recovery Testing (Residual Drawdown Testing). Assess Relief Well and aquifer conditions by hydraulic testing methods. Downhole Imaging to determine comprehensive condition of relief well (structural integrity, biological plugging, geochemical clogging, etc.). Analysis of contaminants and water chemistry: Geochemical sampling and analysis to determine baseline chemical characteristics of the well and aquifer. Analysis of microbes using the Biological Activity Reaction Test analysis, and other tests to allow for complete characterization of levels of biological activity. Complex modeling of system(s), both numerical and finite-element modeling. Traditional modeling of systems using methods such as Theis, Rorabaugh, Jacob, and Hantush-Bierschenk. Contractor shall perform redevelopment and/or rehabilitation to re- establish the operating condition of the relief well by mechanical and or the Blended Chemical Heat Treatment method and as required other methods to rehabilitate. Maintain collection, disposal, and treatment of wastewater capabilities. Perform accurate assessments of post-treatment effectiveness from baseline conditions. Installation of new wells. Perform preventative well maintenance including condition assessments, monitoring of geochemical and biological condition, and period treatments. Abandonment of existing wells in accordance with all relevant guidance. Perform comprehensive site assessments in order to complete design of new pressure relief well systems for various dam and levee projects. Review existing systems for performance, and recommend changes to systems to enhance or augment operation. Develop individual wells, well systems by performing various well development techniques. Develop and/or manage Individual and District wide relief well operation and maintenance plans. Analyze wells for efficiency and aquifer parameters. Perform computer modeling for design and data analysis. Conduct as necessary video inspections, visual inspections, geochemical analysis and biofouling analysis for toe drain piping, seepage collection piping, and other related drainage structures to perform maintenance and rehabilitation. Develop and manage individual and district wide maintenance programs, including maintenance monitoring, for pressure relief piping, relief well collector piping, and other related drainage structures. Aerial, Surficial, and or downhole Geophysical Surveying of embankments and appurtenant components to include: Ground Penetrating Radar Direct Current Electrical Resistivity Frequency Domain Electromagnetics Self-Potential Transient EM Seismic Refraction and Reflection Techniques. Gravity Techniques Remote sensing Borehole geophysics Contaminated soil and groundwater cleanup related to wells. Environmental Studies and knowledge required related to Relief Wells, Toe Drains, and Collector Systems: All aspects of NEPA and other Federal Programs, State and Local Environmental Laws and Regulations - studies and designs Records of Environmental Consideration Site characterization Pollution prevention plans. Risk assessments Contamination assessment Corrective action plans Hazardous and toxic waste surveys Sampling and Testing Surface/subsurface sampling of soils, sediments, rock, and water Sewer sampling Storm water discharge evaluation Procurement of Environmental Permits National Pollutant Discharge Elimination System (NPDES) Clean Water Act (CWA) Work shall be accomplished in full compliance with established Corps of Engineers manuals, policies, standards, and practices and other professional practices and standards as necessitated by project conditions or job requirement. 3. SELECTION CRITERIA: The selection criteria for this contract is listed below in descending order of importance. Criteria A-E are primary. Criteria F is secondary and will only be used as a - tie- breaker among firms that are essentially technically equal. (A) Specialized Experience and Technical Competence: As listed below in descending order of importance; firms must demonstrate specialized experience, technical competence, availability of both staff and equipment to perform, monitor, and otherwise accomplish the defined work: Provide specific examples of utilization of approved Blended Chemical Heat Treatment in foundation pressure relief well rehabilitation efforts, number of wells treated, and document success ratios. Successfully document familiarity with projects and foundation pressure relief wells systems to include the ability to design, review and update existing foundation pressure relief well systems, as well as develop maintenance plans both local and wide area. Demonstrate successful completion of geochemical sampling and analysis and development of sampling methodology for determining condition of relief wells. Provide examples of step-drawdown testing, constant rate testing, and capacity testing of foundation pressure relief wells and well systems. Demonstrate experience with inspection, cleaning, evaluation and rehabilitation of lateral drainage systems; such as toe drain systems on dams and levees. Demonstrate successful analysis of microbial analysis and development of maintenance procedure for that microbe. Demonstrate ability to analyze specific relief well systems and foundation types and give recommendations and conclusions to the client that provides potential future cost savings based on suggested improved methods and analyses. Demonstrate ability to determine aquifer characteristics, classification, and relief well efficiencies given various influences including: partially penetrating wells, complex boundary conditions, and foundations (aquifers) providing high transmissivities and relatively small drawdowns. Demonstrate the ability to perform analyses to identify flow regimes during pumping test and detect aquifer boundaries (e.g. no-flow, weak re-charge boundary, etc.). Demonstrate familiarity with both numerical and finite-element analysis as well as Rorabaugh, Jacob, Hantush-Bierschenk, and Theis modeling methods and document experience assessing well losses and well efficiency parameters as relevant to well system design and existing system back-analysis. The software programs for aquifer and relief well analysis will be evaluated to determine the extent to which the programs and experience utilizing same can satisfactorily meet contract specifications. Document equipment types and quantities available to perform the work covered in this synopsis. Successfully install, maintain, upgrade, rehabilitate, and troubleshoot dam and levee foundation pressure relief wells and well systems. Document types of geophysical surveying methods accomplished and provide examples of the efforts. Firm shall provide documentation of successful aquifer mapping and characterization. Demonstrate proficiency with downhole imagery via video and camera. Document designs utilized for alternative foundation pressure remediation efforts and successes. (B) Professional Qualifications: The evaluation of professional qualifications will consider relevant experience, education, training, professional registration, organizational certifications and longevity with the firm. The firm should indicate professional registrations/licenses, certifications from commercial organizations, professional recognition, professional associations, advanced training and specific work experience of key personnel. The firm shall demonstrate the necessary senior professional staff to minimally include the job descriptions below. The professional qualifications criteria for this contract are listed in descending order of importance. Project Manager: Minimum of one (1) senior level registered Geotechnical Professional Engineer with a minimum of fifteen (15) years of professional experience of which ten (10) years specifically relate to Geotechnical and Dam and Levee Foundation Pressure Relief Well and other systems. This person will be responsible for overall management of the scoped work, and quality control of all deliverables. Contractor shall define why the submitted person qualifies for this role. Chemical Engineer: Minimum of one (1) senior level Chemical Engineer with a minimum of fifteen (15) years of professional experience of which ten (10) years are specifically related to analysis of found contaminants and groundwater chemistry and disposal of contaminants according to federal, state, and local laws and regulations. Candidate(s) shall be a registered professional engineer. Groundwater Specialist: Minimum of one engineer or geologist with advanced degree responsible for overall on the ground field programs and data acquisition as well as overseeing installs and all other field activities. Specialist must have a minimum of 15 years of experience in this field. (C)Past Performance: Firms must demonstrate past performance in work similar in technical scope on DoD and other contracts with respect to cost control, quality of work, ability to work independently and compliance with performance schedules as determined from the Contract Performance Assessment Reporting System (CPARS), Federal Awardee Performance and Integrity Information System (FAPIIS), and other sources. CPARS and FAPIIS are the primary sources of information on past performance. Verifiable, documented evaluations from sources outside CPARS and FAPIIS may be considered, but the government is not required to seek other information on the past performance of a firm if none is available from CPARS and FAPIIS. (D) Capacity: Capacity of the firm to perform as much as $2,500,000.00 in work per annum in a satisfactory and efficient manner. The evaluation will consider the firms ability to provide required personnel to meet the requirements above and the availability of an adequate number of persons in key disciplines. The firm should have one point of contact for this contract and demonstrate past/projected-working relationships with subcontractors. Include an organization chart of the key personnel assigned to the contract. Firms should demonstrate strong ability to provide comprehensive program and project management for complex work; strong ability to provide comprehensive complex technical support; ability to provide necessary personnel for expedited, complex and unexpected work; ability to initiate, manage and complete multiple concurrent task orders; ability to meet unforeseen schedule changes and maintain delivery of a quality product on a timely schedule. (E) Knowledge of the Locality: District and Division geologic features. Experience in creating foundation pressure relief systems within Divisional boundaries. (F) Equitable Distribution of DoD Contracts: Volume of DOD A-E contract awards in the last 12-months, with the objective of effecting an equitable distribution of DoD A-E contracts among qualified firms, including small business (SB) and small disadvantaged businesses (SDB). 4. SUBMISSION REQUIREMENTS: Responses shall reference the solicitation number assigned to this procurement on the face of the envelope/package containing the proposal. Interested firms having the capability to perform this work must submit four (4) copies of SF 330 Part I and four (4) copies of SF 330 Part II for the prime firm and all consultants to the above address not later than 4:00 PM Eastern Standard Time on April 8, 2020. Offerors shall also submit one copy of the submitted package on a CD or DVD, in a searchable PDF format. Include the firm's DUNS number in SF 330, Part II, Block 4. Facsimile and electronic transmissions will not be accepted. Solicitation packages are not provided and no additional project information will be given to firms during the announcement period. This is not a request for proposal. The POC for this procurement is Kristin Blake, contact@example.gov.

More opportunities from Department Of Defense → W072 Endist Huntington

Same awarding agency

NAICS: 237990
New
Federal
Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020
Solicitation # W9123726RA020
Solicitation W9123726RA020 is a new acquisition by the Department of the Army, Huntington District, for the rehabilitation of the intake structure and dam at Fishtrap Lake in Shelbiana, Kentucky. The scope of work includes providing all labor, materials, and supervision for electrical and mechanical replacements, specifically the manufacturing of one new service gate cylinder and the rehabilitation of two service gate cylinders and one low flow gate cylinder. The contract includes four optional components: cylinder rehabilitation, crane rehabilitation, elevator power and control system replacement, and full replacement of all three service gate cylinders. The base contract must be completed within 270 calendar days of the Notice to Proceed, with various options extending the period of performance up to 450 days. Proposals are evaluated based on past performance, a small business participation plan, and cost/price reasonableness. Submissions must be delivered in searchable PDF format via the PIEE Solicitation Module. The project is subject to the Davis-Bacon Act, requiring prevailing wage rates for Pike County, Kentucky, and must adhere to USACE EM 385-1-1 safety standards, including the submission of an Accident Prevention Plan and a critical lift plan. Performance and payment bonds are required for bids exceeding 150,000 dollars. Hazardous materials handling must comply with DOT and EPA standards, and all elevator work requires certification by a third-party Qualified Elevator Inspector.
Other Heavy and Civil Engineering Construction

POSTED

7 days ago

DEADLINE

in 8 days
View Details
NAICS: 237990
Federal
Winfield Locks and Dam Major Rehab Industry Day
Solicitation # W91237-27-SN-0001
The Winfield Locks and Dam Major Rehabilitation Project, managed by the U.S. Army Corps of Engineers Huntington District, is a comprehensive infrastructure modernization effort designed to extend the facility's operational life by 50 years. The scope of work includes the full replacement of five standard roller gates and one specialized flap gate, along with the rehabilitation of 1930s-era electro-mechanical drive systems. Critical structural repairs involve replacing the post-tensioned Tainter Gate anchorage system due to stress corrosion cracking and proactively replacing the Main Lock Miter Gate anchorages. Additionally, the project encompasses the replacement of the Dam Service Bridge, modernization of electrical service distribution and SCADA systems, and the replacement of worn components within the Main Lock Emergency Gate Machinery. To facilitate this effort, an Industry Day event is scheduled for November 02, 2026, featuring a presentation at the Winfield Community Center and a site walkthrough at the Winfield Locks and Dam. Interested prime contractors and subcontractors must register by November 01, 2026, at 12:00 PM Noon. The event includes opportunities for in-person one-on-one meetings for prime contractors on the day of the event, with virtual sessions available for all partners starting November 03, 2026. Technical requirements for the project include strict adherence to ASTM A578 for ultrasonic inspections of plates and AWS D1.5 for reinforcing fillet welds, with specific performance testing required for bar anchor installations.
Other Heavy and Civil Engineering Construction

POSTED

14 days ago

DEADLINE

in 3 days
View Details

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS