Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Missouri was posted on October 9, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Ifb 041-2025 James River Lift Station Improvements

Closed
IFB-IFB 041-2025-0-2025/KGState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The project involves a comprehensive rehabilitation of the James River Lift Station, focusing on upgrading and replacing critical process equipment to enhance operational reliability and safety. Key activities include the removal and replacement of four check valves along with associated piping and instrumentation, upgrading manual valve actuators to automated systems, and installing four vacuum relief valve vaults on existing force mains to prevent backflow and manage pressure. The scope also encompasses the rehabilitation of concrete pipe supports, installation of H2S sensors for improved odor and gas detection, and the replacement of pump vibration switches and power monitoring equipment to ensure optimal pump performance. Additionally, the project includes coating all piping within the station to prevent corrosion, along with electrical improvements such as duct banks, instrumentation, and control systems to support these upgrades. Site improvements are also part of the scope, including the construction of vaults, electrical infrastructure enhancements, and support for the installation of new equipment. The contract, issued by the City of Springfield, Missouri, has a project size estimated between $500,000 and $1.5 million, with a response deadline of November 12, 2024. The work aims to modernize the lift station infrastructure, improve safety measures, and ensure more efficient and reliable wastewater conveyance through targeted equipment replacements, system upgrades, and site enhancements.

General Info

Place of Performance

MO, USA

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMissouri → City of Springfield
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Rehabilitation of the James River Lift Station consisting of check valve replacements, installation of electric valve actuators, and other miscellaneous station rehabilitation. Vacuum relief valves will also be installed on the 24” and 36” force mains leaving the lift station.
Work of the Project generally includes the replacement of select process equipment, equipment and support repaired, coating of the existing piping, and associated electrical improvements within the booster pump station, as well as installation of four (4) vacuum relief valve vaults along existing force main. More specifically, the Work includes, but is not limited to, construction of the following:
1. Replacement of all four (4) check valves and associated piping and instrumentation improvements. 2. Replacement of existing manual valve actuators with automated valve actuators and associated electrical improvements. 3. Rehabilitation of two (2) concrete pipe supports at discharge piping elbows. 4. Installation of three (3) H2S sensors and associated electrical improvements. 5. Replacement of existing pump vibration switches and associated electrical improvements. 6. Replacement of power system monitoring equipment. 7. Preparation and recoating of all piping within the pump station. 8. Installation of four (4) vacuum relief valve vaults on existing forcemains. 9. Site improvements to support items above. 10. Site electrical improvements to support items above including duct banks, instrumentation and controls.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS