Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 22, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB 04A7264 Maintenance Facility Upgrades in Solano County

Closed
04A7264State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238150
New
CBP5501 Bldg. 181 Door Replacement Services
Solicitation # CBP5501
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum subcontract to replace two commercial storefront door assemblies at the San Diego Job Corps Center in Imperial Beach, California. The project focuses on the north entrances of Building 181 to improve security, accessibility, and weather resistance. According to Addendum 1, the contractor will retain existing full-height storefront framing and upper glazing, focusing instead on the doors, headers, thresholds, and hardware, while repairing any minor defects in the retained aluminum framing. The work must be completed within 30 consecutive business days following the receipt of all parts or a written Notice to Proceed. Bids are evaluated based on overall best value and must include a detailed cost breakout, proof of insurance, and three references. A physical site visit is mandatory prior to submission. For bids equal to or greater than $25,000, a bid bond of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The project is subject to the Davis-Bacon Act, requiring weekly certified payroll reports and compliance with prevailing wage rates. Additionally, all work must adhere to ADA and California accessibility standards, including the installation of 10-inch ADA bottom rails. Contractors must provide a minimum one-year workmanship warranty and submit two sets of operation and maintenance manuals upon completion. Required onboarding documentation includes a UEI number, IRS Form W-9, and supplier self-certification regarding small business status under FAR 52.219-8. Insurance requirements include general liability of at least $1,000,000 and worker's compensation with employer's liability limits of $500,000. Final payment is contingent upon the submission of a Notice of Final Completion, a final certified payroll report, and certificates confirming the release of liens and payment of debts.
San Diego Job Corps Center

POSTED

about 1 hour ago

DEADLINE

in 15 days
NAICS: 238150
New
SLED
IH-25043/ State Parking Garage Single Entrance Remodel-1350
Solicitation # One (1)
The State Parking Garage Single Entrance Remodel project, identified as IH-25043, involves a turnkey installation of a single storefront entrance at 1350 Lincoln Street in Denver, Colorado. Managed by Richard Sartirana for the Department of Personnel and Administration, the project has a budget of $75,000 and requires the procurement, assembly, and installation of the storefront entrance, including electrical and security access. The contractor is responsible for generating shop drawings for architect approval and ensuring all work conforms to engineered drawings, OSHA standards, and ADA accessibility requirements. The project must be fully closed out by June 30, 2027, to comply with State fiscal year rules. The contract will be awarded to the lowest responsible bidder, with preference given to Colorado resident bidders and labor. Bidders must submit quotes on company letterhead via a single zip file to the project manager by November 6, 2026. Because the budget is $75,000, a bid security of at least 5% of the bid price is required. Awarded vendors must be registered in CORE and the State of Colorado, participate in E-Verify, and provide full manufacturer warranties for all parts and labor. Strict quality standards are enforced, including specific installation tolerances for plumb and level alignment and the use of an independent architectural hardware consultant for field quality control.
DPA - Capital Construction/controlled Maintenance

POSTED

about 11 hours ago

DEADLINE

in 9 days

General Info

Documents

3

IFB #04A7264 Addendum No. 1 - Maintenance Facility Upgrades in Solano County

PDF, High priority: read this firstamendment
High

IFB #04A7264 Addendum No. 2 - Maintenance Facility Upgrades in Solano County

PDF, High priority: read this firstamendment
High

IFB # 04A7264 - Maintenance Facility Upgrades in Solano County

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A
Contacts
Benjamin Tran

Full Description

Show more
The documents and files attached to this solicitation do not have any updates for digital accessibility at this time. Updates will be applied as soon as they are available. For an accessible version of solicitation documents published on this page, please submit a request to contact@example.gov or call +1 (555) 000-0000.
1. Contractor shall furnish all labor, tools, equipment, travel, and incidentals necessary to remove and legally dispose of existing windows, floors, door, exterior lights and bathroom fixtures, install new windows, floors, door, exterior lights and bathroom fixtures, and paint the interior and exterior of office building at Caltrans Benicia Maintenance Yard in Solano County.
2. Refer to the Proposed Form of Agreement, Exhibit A, which is attached to this IFB, for a more complete description of services.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS