Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 2, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB # 10200813 Traffic Control Services

Closed
0000031247State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
SLED
Seminole Boat Ramp
Solicitation # 26-0075-MA
The City of Clearwater is soliciting bids for the Seminole Boat Ramp Restoration project in Clearwater, Florida. The scope of work involves the comprehensive repair and reconstruction of eight launching ramps across four bays, designed to accommodate vessels exceeding 35 feet and weighing over 10 tons. Key project activities include the demolition of existing concrete structures, dredging and grading of native soils, placement of various gravel fills, and the installation of new concrete ramps using either a precast slab system or pour-in-place solution. Additionally, the contractor is responsible for the temporary relocation and re-anchoring of floating docks to ensure ADA-compliant travel, the installation of articulated concrete mattresses for scour protection, and the implementation of strict environmental controls, including turbidity curtains and stormwater pollution prevention plans. Bidders must be pre-qualified in Marine Construction for at least 750,000 dollars and provide a bid security deposit equal to 10 percent of their maximum bid price. The project must be completed within 180 calendar days from the Notice to Proceed, with a hard deadline for full public restoration by February 15, 2027. To minimize public disruption, the contract limits the simultaneous closure of all four ramps to a maximum of 45 calendar days. Performance will be verified through third-party topographic surveys, with acceptance based on post-grading soundings compared to the design template. Progress payments will be prorated monthly based on the physical percentage of project completion.
Public Works

POSTED

about 5 hours ago

DEADLINE

in 21 days

Documents

4

IFB 10200813 Addendum 1 DVBE Revised

PDF, High priority: read this firstamendment
High

IFB 10200813 Addendum 2 - Bid Key Action Dates Revised

PDF, High priority: read this firstamendment
High

IFB 10200813 Addendum 3 Q&A for Traffic Control Services

PDF, High priority: read this firstamendment
High

IFB 10200813 Traffic Control Services

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from May 30, 2024 to May 20, 2024. NAICS code changed from 237310 to 237990.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Water Resources
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
The Department of Water Resources, Sacramento Maintenance Facility (DWR SMF). DWR SMF will be performing various tasks on project sites that will require traffic control on publicly accessible roadways that are within project boundaries. Projects will vary in size and duration, varying from 500 to 1,500 feet in distance and 1 to 45 days in duration, and include the possibility of services required during off- hours or on a 24 hours a day, 7 days a week basis during emergency work. Project requirements may include closing shoulders, lanes of traffic, and could involve metering traffic around the project area. Samples of projects that require traffic control may include clearing brush, drainage/shoulder work, opening manholes to access the pipeline for draining, and road surface repair.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS