Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Massachusetts was posted on November 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB 2025 Well Redevelopment

Closed
BD-25-2110-LELWD-LELWD-122614State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
SLED
Cedar Creek Section 2 Phase 2 Pipeline Replacement
Solicitation # 26-170
The Tarrant Regional Water District (TRWD) is soliciting proposals for the Cedar Creek Section 2 Phase 2 Pipeline Replacement Project, identified as solicitation 26-170. The project involves replacing approximately 4.4 miles of 72-inch prestressed concrete cylinder pipe with new welded steel raw water transmission pipelines ranging from 72 to 102 inches in diameter. The work extends from Mouser Way to the Kennedale Balancing Reservoir in southeast Tarrant County, Texas, and will be executed within a 130-foot-wide easement. The scope includes the use of open-cut and trenchless construction methods, including two new tunnel installations and the reuse of an existing casing for TxDOT and Union Pacific Railroad crossings. Additional requirements include the installation of air release, blow-off, and butterfly valves, as well as the abandonment or removal of existing facilities. The contract will be awarded based on best value, with evaluation criteria weighted across proposed price and timeline (40 points), project approach (20 points), offeror experience (20 points), and key personnel qualifications (20 points). Bidders must provide a bid bond and comply with Texas Government Code requirements, including the payment of prevailing wages and the provision of performance and payment bonds. Proposals are due by December 10, 2026, via the OpenGov electronic bidding system. The selected contractor will be required to implement a comprehensive Quality Control Plan and utilize a designated online project management information system for all documentation and communications with the TRWD project team.
Infrastructure Engineering

POSTED

about 2 hours ago

DEADLINE

in 27 days
NAICS: 237110
New
SLED
San Pablo Dam Road 24" ACP -CIPP Trunk Line Rehabilitation
Solicitation # 26-NIIB-052
The West County Wastewater District is soliciting bids for the San Pablo Dam Road 24 inch ACP CIPP Trunk Line Rehabilitation project, solicitation number 26-NIIB-052. The project involves the rehabilitation of a 24 inch ACP Class 5000 trunk sewer between manholes MHM17105 and MHM17106, where a previous liner has failed. The selected contractor will install approximately 420 linear feet of Cured-in-Place Pipe (CIPP) liner. To minimize impacts on traffic and sewage flow, construction must be performed during nighttime hours. Key deliverables include the liner installation, post-installation CCTV inspection videos, as-built drawings, and the acquisition of a Contra Costa County Encroachment Permit. The project is expected to be completed within 30 to 45 calendar days of the Notice to Proceed. The contract will be awarded to the lowest responsible bidder based on the total bid price and satisfactory qualifications. Bidders must submit a comprehensive package by November 13, 2026, including a bid form, a 5 percent bid security, a non-collusion declaration, a disqualification questionnaire, and a CARB In-Use Off-Road Diesel-Fueled Fleet Rules certification. Additionally, contractors must provide a statement of qualifications, a designation of subcontractors for work exceeding 0.5 percent of the total, and proof of DIR registration and CSLB licensing. The successful contractor is required to provide payment and performance bonds, adhere to California prevailing wage rates, and employ a project manager, on-site superintendent, and a designated safety representative.
Infrastructure and Planning

POSTED

about 3 hours ago

DEADLINE

in about 3 hours

General Info

Documents

1
PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Littleton Electric Light and Water Departments
Contacts1 person available
OfficeAyer Road Littleton, MA, 01460, USA

Full Description

Show more
The cleaning and redevelopment of all LWD wells through mechanical surging and chemical treatments including performance testing. Prospective bidders must complete a one-time registration process at lelwd.com in order to download bid documents

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS