Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on May 31, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB #C24-32710 Vending Machine Relocation, Installation, Removal, Service and Repair (San Joaquin, Stanislaus and Tuolumne Counties)

Closed
C24-32710State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. The comprehensive scope of work includes underground construction such as tunneling, boring, jacking, and micro tunneling, as well as site preparation activities including land surveying, site clearing, shoring, and subgrade roadbed work. Additional requirements encompass environmental services like storm water pollution prevention, the installation of utilities, manholes, traffic signals, lighting, and landscaping, and the supply of materials such as ready mix and precast concrete. This solicitation is open to qualified Small Businesses, including SBA certified Women-Owned Small Businesses and Disadvantaged Business Enterprises. To be considered responsive, bidders must possess a valid California Contractor license, provide acceptable insurance, and be capable of providing bonding for 100 percent of their contract value, for which Kiewit will reimburse the premiums. Bidders must also demonstrate an ability to maintain labor harmony on the project. Interested parties must contact Lead Estimator Ken Johnston to receive an Invitation to Bid via the Building Connected system, with a final response deadline of November 18, 2025.
Kiewit Infrastructure West Co.

POSTED

about 5 hours ago

DEADLINE

in 19 days
NAICS: 237310
New
SLED
SB Minor B 03A4243 - Bicycle Railing Installation - Placer County
Solicitation # 03A4243
The California Department of Transportation is soliciting bids for contract 03A4243, which involves the installation of bicycle railings at the Maple Street Overcrossing on Route 80 in Auburn, Placer County. This is a Small Business Minor B set-aside project with an estimated cost of $253,000.00. The contract will be awarded to the lowest responsible bidder who is a certified small business at the time of bid opening and award. The project must be completed within 20 working days, and the scope includes the implementation of temporary traffic control systems and the installation of traffic stripe tape meeting specific retroreflectivity and durability standards. Bids must be submitted via email to [email hidden] by November 12, 2026, and any bid exceeding $484,000.00 will be rejected. While no specific DVBE goal is established, participation is encouraged. The successful bidder will be required to provide a payment bond if the bid exceeds $25,000, along with certificates of insurance, a Payee Data Record, and Postconsumer-Content Certification. All construction materials must comply with Build America Buy America standards under 2 CFR 184.6. Payment for contracts of 20 working days or less is made after contract acceptance, while longer contracts allow for progress payments via itemized invoices.
California Department of Transportation

POSTED

about 5 hours ago

DEADLINE

in 14 days
NAICS: 237310
New
SLED
SB Minor B-Install passageway for emergency vehicles-San Diego County
Solicitation # 11A4469
The California Department of Transportation is soliciting bids for contract 11A4469 to install a passageway for emergency vehicles in San Diego County. This is a Small Business Minor B set-aside, requiring bidders to be certified as a small business by the Department of General Services by 5:00 p.m. on the bid opening date. The scope of work includes traffic control, electrical system installation for detectors, environmental controls such as temporary water pollution and concrete washout facilities, and the installation of signage and pavement markings. The project is governed by 2025 Standard Specifications and Standard Plans, with specific requirements for Buy America compliance and strict quality standards for local materials, including pH and lead concentration limits. Bids must be submitted exclusively via email to [email hidden] by November 12, 2026, as hard copies will not be accepted. Any bid exceeding 484,000.00 dollars will be rejected per Public Contract Code 10105(b). The contract will be awarded to the lowest responsible bidder within 30 days of the bid opening. Successful awardees must provide payment bonds and insurance at the time of award and complete the Payee Data Record and Standard Agreement forms. Payment terms vary based on project duration, with progress payments available for contracts exceeding 20 working days, provided the work meets specifications and the value exceeds 5,000 dollars.
California Department of Transportation

POSTED

about 5 hours ago

DEADLINE

in 14 days

General Info

Documents

8

Addendum 1 for IFB C24-32710 Vending Machine Services - Revise Key Action Dates

PDF, High priority: read this firstamendment
High

DGS Certified Small Business Participation Information

PDF, High priority: read this first4 pages · special-notice
High

DVBE Incentive Program Information for Bidders

PDF, High priority: read this first9 pages · special-notice
High

IFB C24-32710 Addendum 2 - Revise Key Action Dates

PDF, High priority: read this firstamendment
High

IFB C24-32710 Vending Machine Relocation and Service

PDF, High priority: read this firstifb
High

California STD 204 Payee Data Record (Rev. 03/2021)

PDF, Low prioritypayee-data-record
Low

Darfur Contracting Act Certification Form

PDF, Low prioritycertification-form
Low

STD 1000 GenAI Disclosure & Factsheet

PDF, Low priorityspecial-notice
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jun 17, 2024 to Jul 1, 2024. NAICS code changed from 237310 to 454210. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Rehabilitation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
A) Type of Service 1) The Department of Rehabilitation's (DOR) Business Enterprise Program (BEP) equipment is in State, Federal, County office buildings, privately owned buildings cafeterias, snack bars, convenience stores and vending machine facilities.
2) The Contractor shall provide Vending Machine Repairs and Service, Preventative Maintenance, Relocation, Installation, and Removal for DOR BEP cafeterias, snack bars, roadside rests, and vending facilities at locations such as CDCR correctional facilities, state and federal buildings. Equipment for repair will include but is not limited to coin mechanisms, bill validators, card readers, spiral motors, cold beverage dispensing motors, basic components for hot beverage machines, control and display boards, position sensors for carousel machines, doors, and electrical plugs. Services will include all problems or malfunctions with the vending machine in order to ensure that each vending machine is fully operational and able to dispense products and maintain temperature. Timely services must be provided to ensure the BEP vendor has limited interruption of business operations. This includes planning logistics, ensuring safety protocols, and coordinating with the Business Enterprises Consultant (BEC) and BEP vendors when necessary.
3) Equipment is not to be removed from the location without the written approval of a Business Enterprise Consultant (BEC) or the Contract Administrator. No exceptions.  Only when approval has been received in writing granting authorization to remove equipment, Contractor shall complete the "Equipment sign out control log" DR287. 
4) The Contractor shall provide service listed on the Authorization for Repairs and Service (DR 1308) only.  If additional work is required the Contractor shall obtain written approval from the Contract Administrator/designee prior to additional work commencing.
B) Locations  Locations listed in Exhibit G are subject to change.  The Contractor will be notified in writing of any change in locations. 
C) Service Hours All Services shall be provided five (5) days a week, excluding holidays, between the hours of 7:00 a.m. to 5:00 p.m.  For work which needs to be accomplished before or after normal working hours, a charge of one-and-one-half (1-1/2) times the bid rate will be granted.  For work which needs to be accomplished on a Sunday or official State holiday, an amount of twice the bid rate will be granted.  Prior authorization must be obtained, in writing, from the DOR's Contract Administrator and/or designee for time requested other than normal working hours, Sundays and official State holidays.  A list of official State holidays is available from the DOR.
D) Estimates The DOR's Contract Administrator and/or designee requires¿ the Contractor to provide an estimate prior to authorizing any services.
E) Response Time From the time the DOR initiates a service request to the time the service commences shall not exceed twenty-four to forty-eight (24-48) hours, unless an extension of time is approved by the DOR's Contract Administrator and/or designee.  Occasionally, the DOR will inform the Contractor that an emergency condition exists and the Contractor shall complete the required service within a twenty-four (24) hour period to the satisfaction of the DOR.  In general, service shall be completed within a reasonable and acceptable time period to the DOR taking into consideration the nature and degree of the difficulty of the work involved.  Emergency shall be defined as a health and safety or hazardous working environment situation.
F) Call Back Services All work shall be under warranty for thirty (30) days from date of completed repair.  Time and costs for call backs to previous repairs under warranty shall be borne by the Contractor.
G) Notification The Contract Administrator will notify the Contractor, via an Authorization for Repairs and Service - DR 1308, of location(s) requiring service and location contact person.  The Contractor shall schedule service date(s) and time(s) with the BEP vendor.  If the BEP vendor or designee is not on site at the scheduled time and date, the Contractor is to contact the Contract Administrator/designee for further instructions.  If Contract Administrator/designee cannot be reached, Contractor is to leave the site without performing any service and will charge the DOR one (1) hour at the Contract labor rate.  The Contractor shall obtain the BEP vendor or designee¿s signature on the Authorization for Repairs and Service - DR 1308 upon work completion and verification that equipment is in working order and submit signed Authorization for Repairs and Service - DR 1308 for payment.
H) Verification of Arrival The Contractor/service technician is required to have the BEP vendor or his or her staffs verify time of arrival on the job site, as well as the time of departure.  BEP vendor or his or her staff must be on site while the service is being performed.  The Contractor shall leave a copy of the work order signed by the BEP vendor or his or her staff indicating:  1) minimum time of arrival; 2) time of departure; and 3) general description of work performed at the location.
I) Parts and Materials The charges for parts and materials shall not exceed forty percent (40%) of the Contractor's wholesale costs; excluding tax, i.e.; $100.00 parts cost x 40%x 7.75 (City Sales) Tax = $129.30.  The Department of Rehabilitation may pay any applicable sales and use tax imposed by another State.  Only original manufacturer parts and materials shall be used.  Removed parts shall be left at the location with the BEP vendor or his or her staff for BEP inspection.  The maximum amount that may be charged per job shall be $2,000.00.  The maximum amount that may be charged per job may be increased with the approval of the Contract Administrator or the Business Enterprise Program Manager. See Exhibit B - paragraph 1. Invoicing and Payments - Item 9 for parts and materials cost reimbursements.
The Contractor shall have readily available on the service truck the following parts: ¿ Coin Mechanisms both 24 volt and 110 volt logic and MDB ¿ Bill acceptors both 24 volt and 110 volt, logic and MDB ¿ Spiral Motors for National, AMS and A.P. including hubs ¿ Cold beverage dispensing motors for can and bottle beverage machines (Dixie Marco, Vendo, Royal) ¿ Whipper motors, brew baskets and basic components for hot beverage machines, valves and temperature probes, etc. ¿ Door and position sensors for National and Rowe carousel cold food machines, drum roller and stop pins ¿ A limited supply of control, display boards, and EPROMS for Ams Sensit snack, Rowe and National Cold Food, National and API Hot Beverage, Royal and Vendo can/bottle Ventronics and Fast Corp Frozen Food Machines.
Refurbished or rebuilt parts are not allowed with the exception of the coin mechanism and validator parts.  Refurbished/rebuilt coin mechanisms and validator parts must carry a three (3) month warranty.
J) Freight Charges Contractor will be allowed to recover freight or shipping costs for parts, with no allowance for mark-up, by: 1) Itemizing the cost of freight or shipping on the invoice. 2) Attaching a copy of the freight or shipping invoice (original whenever possible) to the invoice. 3) An original receipt is required for any freight/shipping cost over $50.00. 4) When the freight or shipping invoice includes costs not specifically associated with the billing, the Contractor will only charge for the costs associated with the billing and note the freight or shipping invoice accordingly.
K) Work Area Contractor will ensure that the work area is kept clean and free of debris, as necessary, to maintain a safe working environment in and around the location.  While working on equipment, Contractor agrees to perform services with as little disruption to the State¿s and BEP vendor operations as possible.  All tools, equipment and other work materials belonging to the Contractor will be removed from the work location at the end of each working day.  The State shall not be responsible for storage of any Contractor property.
L) State Property 1) It shall be the Contractor's responsibility to make all necessary arrangements with office or building manager and local traffic authorities for use of elevators, loading docks, adjacent streets, sidewalks, and/or malls. 2) Any damages by the Contractor to portions of building, premises, equipment, furniture, material or other property will be repaired or items will be replaced by Contractor to the satisfaction of the DOR with no expense to the DOR.  3) Any damages by the Contractor to portions of buildings or premises for which the DOR is responsible, the DOR may, itself, at its option, repair or replace damages and deduct the cost thereof from the Contractor's invoice. 4) Contractor shall provide dust covers, temporary dust barriers, pads, etc., as required to protect building occupants and contents during its operation.  Any items lost or stolen while in the Contractor's custody will be replaced by the Contractor at no expense to the State/Federal government.  Contractor must receive approval from the State/Federal government to remove equipment from a location. 5) Floors, walls, and ceilings of buildings, including elevators, will be adequately protected by Contractor to prevent marring and scratching or other damages. The State may, itself, at its option, repair any damage or replace any lost or stolen items and deduct the cost thereof from Contractor's invoice. 6) Contractor shall keep site clean as work progresses.  Upon completion of the work, all surfaces involved in this project shall be clean of any foreign material.  Contractor shall remove all waste materials from the work site and dispose of as required to maintain a safe working environment.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS