Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 16, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB #C25-33025 Commercial Exhaust Hood Fire Suppression System, Service/ Repair, & Preventative Maintenance Service and Repair (Sacramento County)

Closed
C25-33025State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 423930
New
Federal
Sale of Empty Used Condition Code (S) Ammunition Containers
Solicitation # QRP27-0003
The Fort Knox Qualified Recycle Program is soliciting bids for the sale of one load of empty used condition code (S) ammunition containers, totaling approximately 35,000 lbs. The inventory consists of 8 skids of PA108 SAW containers, 13 skids of M19A1 7.62 containers, and 27 skids of M2A2 .50 CAL containers. The award will be granted to the highest conforming offer. Interested bidders must submit their offer price and a fully completed, signed, and initialed solicitation agreement to Jamie Daley and Anita Overton via email by November 3, 2026, at 2:00 PM EST. The winning bidder is responsible for providing a 53-foot van trailer for transport and must pick up the materials within five working days of notification during shipping hours of 8:00 AM to 2:30 PM EST. Weight verification will be conducted using government scales at Building 2962, requiring signatures from both the bidder and a QRP representative. Payment must be made via cashier's check, certified check, traveler's check, or postal money order to the U.S. Treasury Department, Fort Knox QRP. Typically, 80% of the award amount is due at or before pickup, with the balance due within 15 calendar days, although 100% upfront payment may be required if the bidder cannot be vetted for solvency via SAM, DUNS, or Cage Code. Bidders must comply with all applicable laws for material disposal and acknowledge that vehicles are subject to search upon entry to the Fort Knox installation.
W6CD Usag Ft Knox

POSTED

about 18 hours ago

DEADLINE

in 7 days
NAICS: 423930
New
Federal
Sale of Two (2) Used Condition Code (S) Scrap Metal Conex Shipping Containers
Solicitation # QRP27-0001
The Fort Knox Qualified Recycle Program is soliciting bids for the sale of two Used Condition Code (S) Scrap Metal Conex Shipping Containers under solicitation number QRP27-0001. The winning bidder will be allowed to select two containers from a total of seven available units, each measuring 8 feet wide, 8.6 feet high, and 40 feet long, with an approximate weight of 8,220 pounds per unit. Bids must be submitted via email to Jamie Daley and Anita Overton by November 3, 2026, at 2:00 PM EST. The award will be granted to the highest conforming offer based on the best price per pound offered. The winning bidder is responsible for all transportation costs and must use a low boy trailer to pick up the materials within ten working days of notification. All loads must be weighed on government scales at the Fort Knox QRP site to determine invoicing weights. Payment terms require 80 percent of the award amount at the time of pick-up, with the remaining balance due within 15 calendar days, although 100 percent payment may be required if the bidder cannot be properly vetted for solvency via SAM, DUNS, or Cage Code. Payments must be made to US Treasury Payables, Fort Knox QRP, using accepted forms such as cashier's checks or bank drafts. Bidders must ensure all solicitation pages are initialed and signed to be considered responsive.
W6CD Usag Ft Knox

POSTED

about 18 hours ago

DEADLINE

in 7 days
NAICS: 423930
New
SLED
ITB# RS-27-02 Scrap Metal Recycling-Cooperative Revenue Bid
Solicitation # RS-27-02
The Town of Davie, acting as the lead agency for the Southeast Florida Governmental Purchasing Cooperative Group, is soliciting bids under ITB# RS-27-02 for as-needed scrap metal recycling and disposal services. The scope involves the collection of ferrous and nonferrous metals, such as steel, copper, aluminum, brass, bronze, and stainless steel, with optional e-scrap services for electronic accessories. This is a revenue-based contract where the awardee is required to pay the Town a percentage of the Fastmarkets AMM pricing. Bidders must own and operate a state-certified scale to ensure accurate weighing of containers and must comply with Florida Statute Chapter 538, Part II, and OSHA safety standards. The solicitation requires electronic submission via the OpenGov portal by 3:30 pm on October 29, 2026. Qualified bidders must provide proof of insurance, a W9, and State of Florida Sunbiz registration. Evaluation is based on the bidder's pricing percentage, financial stability, equipment capacity, and past performance. Key contractual obligations include maintaining asbestos-free materials, adhering to Florida law, and providing a bid bond to guarantee the execution of performance and payment bonds. Payments are processed via VISA Procurement card or purchase order, with a standard payment timeline of 30 to 45 days.
Procurement Division

POSTED

1 day ago

DEADLINE

in 9 days

General Info

Documents

6

DGS Certified Small Business Participation Information

PDF, High priority: read this first4 pages · special-notice
High

DVBE Incentive Program Information for Bidders

PDF, High priority: read this first9 pages · special-notice
High

IFB #C25-33025 Addendum 1 - Q&A

PDF, High priority: read this firstq-and-a
High

IFB #C25-33025 Commercial Exhaust Hood Fire Suppression System

PDF, High priority: read this firstifb
High

California STD 204 Payee Data Record (Rev. 03/2021)

PDF, Low prioritypayee-data-record
Low

Darfur Contracting Act Certification Form

PDF, Low prioritycertification-form
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

NAICS code changed from 339113 to 423930. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Rehabilitation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
A) Type of Service
1) The Department of Rehabilitation's (DOR) Business Enterprise Program (BEP) equipment is located in State, Federal, County office buildings, privately owned buildings cafeterias, snack bars, convenience stores and vending machine facilities.
2) The Contractor will provide semiannual, or as required, Commercial Exhaust Hood Fire Suppression System Services, Repairs & Preventative Maintenance for the Department of Rehabilitation¿s Business Enterprise Program cafeterias, snack bars, and vending facilities located in state and federal buildings.  The contractor will provide repairs, recharging and service tags to various types of commercial exhaust hood fire suppression systems. Contractor will provide inspections that may lead to repair and/or replacement of fire suppression system components when needed. When exhaust hood systems must be removed for servicing at the contractor¿s facility, the contractor will provide, at no cost to the State, a suitable replacement until the unit has been repaired and installed. Contractor to provide all fire suppression system supplies and equipment. Timely services must be provided to ensure the BEP vendor has limited interruption of business operations. This includes planning logistics, ensuring safety protocols, and coordinating with the Business Enterprises Consultant (BEC) and BEP vendors when necessary.
B) Locations  Locations listed in Exhibit G are subject to change.  The Contractor will be notified through an amendment of any change in locations.
C) Service Hours All Services shall be provided five (5) days a week, excluding holidays, between the hours of 7:00 a.m. to 5:00 p.m.  For work which needs to be accomplished before or after normal working hours, a charge of one-and-one-half (1-1/2) times the bid rate will be granted.  For work which needs to be accomplished on a Sunday or official State holiday, an amount of twice the bid rate will be granted.  Prior authorization must be obtained, in writing, from the DOR's Contract Administrator and/or designee for time requested other than normal working hours, Sundays and official State holidays.  A list of official State holidays is available from the DOR.
D) Estimates The DOR's Contract Administrator and/or designee requires¿ the Contractor to provide an estimate prior to authorizing any services.
E) Response Time From the time the DOR initiates a service request to the time the service commences shall not exceed twenty-four to forty-eight (24-48) hours, unless an extension of time is approved by the DOR's Contract Administrator and/or designee.  Occasionally, the DOR will inform the Contractor that an emergency condition exists and the Contractor shall complete the required service within a twenty-four (24) hour period to the satisfaction of the DOR.  In general, service shall be completed within a reasonable and acceptable time period to the DOR taking into consideration the nature and degree of the difficulty of the work involved.  Emergency shall be defined as a health and safety or hazardous working environment situation.
F) Call Back Services All work shall be under warranty for thirty (30) days from date of completed repair.  Time and costs for call backs to previous repairs under warranty shall be borne by the Contractor.
G) Notification The Contract Administrator will notify the Contractor, via an Authorization for Repairs and Service - DR 1308, of location(s) requiring service and location contact person.  The Contractor shall schedule service date(s) and time(s) with the BEP vendor.  If the BEP vendor or designee is not on site at the scheduled time and date, the Contractor is to contact the Contract Administrator/designee for further instructions.  If Contract Administrator/designee cannot be reached, Contractor is to leave the site without performing any service and will charge the DOR one (1) hour at the Contract labor rate.  The Contractor shall obtain the BEP vendor or designee¿s signature on the Authorization for Repairs and Service - DR 1308 upon work completion and verification that equipment is in working order and submit signed Authorization for Repairs and Service - DR 1308 for payment.
H) Verification of Arrival The Contractor/service technician is required to have the BEP vendor or his or her staffs verify time of arrival on the job site, as well as the time of departure.  BEP vendor or his or her staff must be on site while the service is being performed.  The Contractor shall leave a copy of the work order signed by the BEP vendor or his or her staff indicating:  1) minimum time of arrival; 2) time of departure; and 3) general description of work performed at the location.
I) Parts and Materials The charges for parts and materials shall not exceed forty percent (40%) of the Contractor's wholesale costs; excluding tax, i.e.; $100.00 parts cost x 40%x 7.75 (City Sales) Tax = $129.30.  The Department of Rehabilitation may pay any applicable sales and use tax imposed by another State.  Only original manufacturer parts and materials shall be used.  Removed parts shall be left at the location with the BEP vendor or his or her staff for BEP inspection.  The maximum amount that may be charged per job shall be $2,000.00.  The maximum amount that may be charged per job may be increased with the approval of the Contract Administrator or the Business Enterprise Program Manager. See Exhibit B - paragraph 1. Invoicing and Payments - Item 9 for parts and materials cost reimbursements.
Used or refurbished or rebuilt parts are not allowed.
J) Freight Charges Contractor will be allowed to recover freight or shipping costs for parts, with no allowance for mark-up, by: 1) Itemizing the cost of freight or shipping on the invoice. 2) Attaching a copy of the freight or shipping invoice (original whenever possible) to the invoice. 3) An original receipt is required for any freight/shipping cost over $50.00. 4) When the freight or shipping invoice includes costs not specifically associated with the billing, the Contractor will only charge for the costs associated with the billing and note the freight or shipping invoice accordingly.
K) Work Area Contractor will ensure that the work area is kept clean and free of debris, as necessary, to maintain a safe working environment in and around the location.  While working on equipment, Contractor agrees to perform services with as little disruption to the State¿s and BEP vendor operations as possible.  All tools, equipment and other work materials belonging to the Contractor will be removed from the work location at the end of each working day.  The State shall not be responsible for storage of any Contractor property.
L) State Property 1) It shall be the Contractor's responsibility to make all necessary arrangements with office or building manager and local traffic authorities for use of elevators, loading docks, adjacent streets, sidewalks, and/or malls. 2) Any damages by the Contractor to portions of building, premises, equipment, furniture, material or other property will be repaired or items will be replaced by Contractor to the satisfaction of the DOR with no expense to the DOR.  3) Any damages by the Contractor to portions of buildings or premises for which the DOR is responsible, the DOR may, itself, at its option, repair or replace damages and deduct the cost thereof from the Contractor's invoice. 4) Contractor shall provide dust covers, temporary dust barriers, pads, etc., as required to protect building occupants and contents during its operation.  Any items lost or stolen while in the Contractor's custody will be replaced by the Contractor at no expense to the State/Federal government.  Contractor must receive approval from the State/Federal government to remove equipment from a location. 5) Floors, walls, and ceilings of buildings, including elevators, will be adequately protected by Contractor to prevent marring and scratching or other damages. The State may, itself, at its option, repair any damage or replace any lost or stolen items and deduct the cost thereof from Contractor's invoice. 6) Contractor shall keep site clean as work progresses.  Upon completion of the work, all surfaces involved in this project shall be clean of any foreign material.  Contractor shall remove all waste materials from the work site and dispose of as required to maintain a safe working environment.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS