This Solicitation opportunity from Texas was posted on March 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
IFB for Replacement Cedar Fence – TSBVI Superintendent’s Residence
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The Texas Facilities Commission is requesting bids from qualified contractors to replace the existing fence surrounding the Superintendent’s residence at the Texas School for the Blind and Visually Impaired. The project involves removing the current perimeter fence, including gates, posts, and concrete footings, with proper disposal at approved facilities in compliance with regulations. The contractor must protect adjacent landscaping and utilities during demolition and handle wiring rerouting if necessary. The new fence will be constructed from quality cedar materials, specifically using No. 2 or better Western Red Cedar pickets with a height of 8 feet. The structure will include heavy-gauge galvanized steel posts set in concrete footings and pressure-treated rails, with all hardware being galvanized or stainless steel. One pedestrian gate and one vehicle gate must be installed, both reinforced for durability and equipped with appropriate locking mechanisms. The scope also requires thorough site work to ensure safety, with utility location and hand-digging near utilities as needed, and restoration of the site to its original condition, including landscape and irrigation repair. Quality workmanship is emphasized, requiring experienced personnel and direct supervision, along with a minimum one-year workmanship warranty and manufacturer warranties for materials used. Contractors must be prepared to respond by February 25, 2026, and direct any inquiries to the designated point of contact at the Texas Facilities Commission. The contract aims to enhance security, privacy, and aesthetics at the residence through durable materials and skilled installation.
General Info
Agency
Place of Performance
Set-Aside
Documents
7AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 10 days
- EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 10 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Deadline has passed
Response deadline changed from Feb 25, 2026 to Mar 6, 2026.
Submission Closed
Organization & Contact Information
Full Description
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
