Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on March 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB for Replacement Cedar Fence – TSBVI Superintendent’s Residence

Closed
0006644State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238990
New
EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2
Solicitation # SD-462
The EBMUD Secondary Reactors Rehabilitation Phase 2 project, solicitation SD-462, is a comprehensive infrastructure project located at the Main Wastewater Treatment Plant in California. Managed by Ranger Pipelines Incorporated, the work involves the rehabilitation of covered and open concrete structures, relining and replacement of small and large diameter steel and ductile iron pipes, and the installation of valves and piping appurtenances. The scope further includes the operation of a temporary 11 MGD pumped bypass, rehabilitation of reactor mixers and aerators, upgrades to electrical and instrumentation systems, replacement of motor control center components, and modifications to sluice and slide gates. Additional tasks include installing platforms for access, rerouting sump pump discharge lines, excavation, trench work, and surveying. The project has an estimated contract value between $18.5 million and $19.5 million, with a bid opening date of December 2, 2026. This opportunity is set aside for Small Business (SB), SBA certified Veteran Owned Small Business (VOSB), SBA certified Service-Disabled Veteran Owned Small Business (SDVOSB), SBA certified Women-Owned Small Business (WOSB), and SBA certified HUBZone Small Business (HUBZone SB). The solicitation specifically seeks certified DBE, DVBE, and SBE subcontractors for specialized services such as coating, lining, concrete rehabilitation, and electrical work, requiring all participants to comply with applicable state, county, and federal regulations.
Ranger Pipelines Incorporated

POSTED

about 5 hours ago

DEADLINE

in 10 days
NAICS: 238990
New
International
Security Enhancement Works: Motorized Sliding Compound Main Gates and Safe Room Security Reinforcement – UNICEF Jigjiga Field Office NA NA - [email hidden]
Solicitation # LRFP-2026-9207436
UNICEF has issued solicitation LRFP-2026-9207436 for security enhancement works at the Jigjiga Field Office in Ethiopia. The project is a non-LTA for construction works divided into two primary components: the supply and installation of three heavy-duty motorized sliding steel gates (5m x 3m) with pedestrian gates and reinforced-concrete foundations, and the security reinforcement of a safe room involving external security grills and double-steel-plated protection for windows and doors. The contractor is responsible for full fabrication, installation, testing, commissioning, and providing training for UNICEF security staff, as well as delivering as-built drawings and maintenance documentation. The contract requires a performance security of 10% of the total price, a 5% retention, and a 12-month equipment warranty and defects liability period. Work must commence by December 31, 2026, with a seven-day mobilization period and a total implementation timeframe of two and a half calendar months. Award evaluation is based on a 70% technical and 30% financial weighting, with a minimum technical pass threshold of 49/70. Technical criteria include the provision of specific equipment such as concrete mixers, generators, and transport vehicles, as well as financial standing and capacity. All works must comply with Ethiopian national laws and international standards including ASTM, ACI, IEC, ISO, and NFPA. There is no set-aside status specified for this solicitation.
UNICEF

POSTED

1 day ago

DEADLINE

N/A

AI Contract Overview

Show more

The Texas Facilities Commission is requesting bids from qualified contractors to replace the existing fence surrounding the Superintendent’s residence at the Texas School for the Blind and Visually Impaired. The project involves removing the current perimeter fence, including gates, posts, and concrete footings, with proper disposal at approved facilities in compliance with regulations. The contractor must protect adjacent landscaping and utilities during demolition and handle wiring rerouting if necessary. The new fence will be constructed from quality cedar materials, specifically using No. 2 or better Western Red Cedar pickets with a height of 8 feet. The structure will include heavy-gauge galvanized steel posts set in concrete footings and pressure-treated rails, with all hardware being galvanized or stainless steel. One pedestrian gate and one vehicle gate must be installed, both reinforced for durability and equipped with appropriate locking mechanisms. The scope also requires thorough site work to ensure safety, with utility location and hand-digging near utilities as needed, and restoration of the site to its original condition, including landscape and irrigation repair. Quality workmanship is emphasized, requiring experienced personnel and direct supervision, along with a minimum one-year workmanship warranty and manufacturer warranties for materials used. Contractors must be prepared to respond by February 25, 2026, and direct any inquiries to the designated point of contact at the Texas Facilities Commission. The contract aims to enhance security, privacy, and aesthetics at the residence through durable materials and skilled installation.

General Info

Replace existing fence at Texas School for Blind residence with cedar, steel posts, gates, and warranty.

Agency

Texas Facilities Commission

Place of Performance

TX, USA

Set-Aside

NONE

Documents

7
DOC, High priority: read this first9 pages · amendment
High
DOC, High priority: read this first9 pages · ifb
High
PDF, High priority: read this first3 pages · amendment
High
DOC, High priority: read this first9 pages · ifb
High
PDF, High priority: read this first6 pages · guidelines
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityother
Low

Read all 7 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 10 days
  • EBMUD – SD-462 – Secondary Reactors Rehab. – Phase 2Open now, due in 10 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Deadline changed

Response deadline changed from Feb 25, 2026 to Mar 6, 2026.

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas Facilities Commission
Contacts1 person available
OfficeTX, USA
Organization / Agency
Texas Facilities Commission
Office AddressTX, USA

Full Description

Show more
Introduction & PurposeThe Texas Facilities Commission (TFC) is soliciting bids from qualified contractors to remove the existing perimeter fence and furnish and install a new cedar security fence around the Superintendent’s residence at the Texas School for the Blind and Visually Impaired (TSBVI). The purpose of this project is to restore security, privacy, and aesthetics using durable materials and workmanship.Scope of WorkThe successful bidder shall provide all labor, materials, equipment, layout, permits (if required), and services to complete a turnkey fence replacement, including:Demolition & DisposalRemove and properly dispose of the existing fence, gates, posts, concrete footings, and related debris.All removed materials shall be transported to an approved recycling or disposal facility in compliance with local, state, and federal regulations.Vendor is responsible for disposal and must be able to provide disposal receipts or documentation upon request to verify proper handling.Protect adjacent landscaping, irrigation, structures, and utilities during demolition.Cap or reroute any low-voltage or gate wiring (if present) per code. New Fence Construction Fence Type: Cedar security fence.Height: 8 ft.Lineal Footage: Contractor to verify during site visit.Pickets: No. 2 or better Western Red Cedar or Cedar pickets; thickness ≥ 5/8 in; width 5½–6 in; flat-top (TSBVI to select).Rails: Pressure-treated pine or cedar 2x4 rails, minimum 3 rails for fences ≥6 ft.Posts: Heavy-gauge, galvanized steel posts, 2-3/8” diameter, set in concrete footings.Footings: Fast-setting concrete mix; hole depth ≥ 30 in, diameter 8–12 in, centered and plumb.Fasteners: Exterior-grade hot-dipped galvanized or stainless steel ring-shank nails or screws; no staples.Top Treatment: Cap and trim (cedar 2x4 cap and cedar trim).Hardware: Galvanized or stainless hinges, latches, handles; lockable latches at gates.GatesProvide one pedestrian gates (width 36–48 in) and one vehicle/drive gate(s) (width 12 ft).Construct gates with reinforced wood frame(s) or steel frame(s) (Alternate A) to prevent sagging; install drop rods and stops for double-leaf gates.Ensure smooth operation, alignment, and clearance; include compatible locking/latching hardware.Site Work & RestorationCall utility locate before digging; hand-dig near marked utilities, if needed.Maintain site safety and cleanliness; restore grade, sod, irrigation, and disturbed areas to pre-project condition.Remove all debris daily; final clean-up upon completion.Quality & WarrantyWork to be performed by experienced personnel under direct supervision.Provide 1-year minimum workmanship warranty and manufacturer warranties for materials.Correct any defects in materials or workmanship at no additional cost during warranty period.

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS