This Solicitation opportunity from Arizona was posted on January 9, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Solicitation BPM007341, issued by the Arizona Department of Administration, covers the ASPT-Parker-River Island OHV Phase Two project for the Arizona State Parks Department. The scope of work involves the development of an off-road vehicle trailhead, including the installation of CXT prefabricated restrooms, water production well drilling, sewer systems, paving, landscaping, and electrical work. The project is guided by technical specifications from J2 Engineering and Environmental Design and adheres to 2023 MAG Uniform Standard Specifications and 2018 IBC standards.
Following a competitive bidding process involving four vendors, the contract was awarded to TSG Constructors LLC as the lowest responsive and responsible bidder. The final award amount is not to exceed 2,224,975.00 dollars, minus any deductive alternates. The agreement, designated as Contract Number CTR080883, requires the contractor to provide statutory bonds and insurance certificates prior to the commencement of work and the scheduling of a pre-construction conference.
General Info
TSG Constructors LLC awarded $2,224,975 for Arizona State Parks OHV trailhead development.
HighAI Summary for BPM007341 Amendment 1 - ASPT-Parker-River Island OHV Phase Two: Solicitation Amendment 1 for IFB PB-25-011 (BPM007341) regarding the ASPT-Parker-River Island OHV Phase Two project. Dated January 23, 2026, it extends the bid due date to February 5, 2026, at 3:00 p.m. Arizona time. The document includes a detailed Q&A section addressing technical queries on CXT restrooms, water availability, prevailing wages, bid bond submissions, and structural design clarifications.
PDF
PDF, High priority: read this firstifb
HighAI Summary for BPM007341 ASPT-Parker-River Island OHV Phase Two: Invitation for Bids (IFB) issued by the Arizona Department of Administration for the development of River Island State Park – OHV Trailhead Phase 2 (Project No. PB-25-011). The project includes restroom installation, well drilling, water and sewer systems, and paving, with an estimated value of 2.5-3.5 million. Bids are due by January 29, 2026, via the APP portal.
PDF
PDF, High priority: read this firstrfb
HighAI Summary for BPM007341 ASPT-Parker-River Island OHV Phase Two Attachments: This document contains multiple bid submission forms for Solicitation No. BPM007341 (Project No. PCS-25-011) for the ASPT-Parker-River Island OHV Phase Two project. It includes Attachment A (Offer and Acceptance Form), Attachment C (Arizona Statutory Bid Bond), and the beginning of Attachment D (Bidder's Statement of Qualifications). These forms are critical for the submission of a valid bid to the Arizona Department of Administration.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for BPM007341 Solicitation Amendment 2 - PB-25-011 ASPT-Parker-River Island OHV Phase Two: Solicitation Amendment 2 dated 1/28/2026 for IFB BPM007341 (PB-25-011 ASPT-Parker-River Island OHV Phase Two). This amendment provides a Q&A session addressing electrical specifications, drawing references, and water treatment system allowances, and replaces the IFB Forms ATT B Bid Schedule with Revision 1.
PDF
PDF, High priority: read this firstaward
HighAI Summary for CTR080883 - ASPT-Parker-River Island OHV Phase Two Offer and Acceptance: Offer and Acceptance form for the ASPT-Parker-River Island OHV Phase Two construction project. The document includes the bidder's certification (TSG Constructors, LLC), bid bond requirements, and the formal acceptance of the offer by the State, resulting in Contract Number CTR080883.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for Exhibit 2 - Construction Fence Location (Rizm Street Camp Fire Patch): Technical exhibit providing a map and layout for the construction fence location at the Rizm Street Camp Fire Patch as part of the Oregon Trail Massive Development Plan. Includes scale (1:7,500), coordinate system data, and site markers for rain gathering sites.
XLSX
XLSX, High priority: read this firstbid-schedule
HighAI Summary for IFB - ASPT-Parker-River Island OHV Phase Two Agency - Attachment B Bid Schedule: Revision 1 of the Attachment B Bid Schedule for Solicitation BPM007341 (Project PCS-25-011) issued by the Arizona Department of Administration. The document provides a detailed line-item cost breakdown for the Parker-River Island OHV Phase Two project, covering general conditions, demolition, well site construction, civil utilities, architecture, landscaping, irrigation, hardscape, and electrical work.
XLSX
XLSX, High priority: read this firstbid-schedule
HighAI Summary for IFB - ASPT-Parker-River Island OHV Phase Two Agency Bid Schedule: Attachment B Bid Schedule for Solicitation No. BPM007341 (Project PCS-25-011) issued by the Arizona Department of Administration. The document provides a detailed line-item breakdown for construction costs, including general conditions, demolition, well site development, civil utilities, architecture, landscaping, irrigation, hardscape, and electrical work.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for River Island Phase II Construction Project - Addendum No. 02: Issued January 7, 2026, by J2 Engineering and Environment Design, LLC for the Arizona State Parks Department. This addendum clarifies that the CXT prefabricated restroom and well drilling work are included in the Phase II Construction Contract and must be part of the Base Bid, notwithstanding any 'Not in Contract' notations on certain drawings.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for River Island State Park Improvements - Geotechnical Evaluation: Geotechnical evaluation report dated July 21, 2023, prepared by Ninyo & Moore for J2 Engineering and Environmental Design. The document provides subsurface conditions, soil boring and test pit results, and technical recommendations for the OHV Trailhead Phase One project in Parker, Arizona, including guidance on earthwork, foundations, pavements, and seismic design parameters.
PDF
PDF, High priority: read this firstamendment
HighAI Summary for River Island State Park - OHV Trailhead Phase 2 - AS1: Architectural Supplemental Instruction (ASI) #1 and related revisions for the River Island State Park OHV Trailhead Phase 2 project. Issued between 11/13/2025 and 11/17/2025 by J2 Design and Entellus, Inc., the document provides technical revisions to fencing, water line plans, and septic system changes, including detailed specifications for well pumps, diaphragm tanks, and schematic profile/plan views.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for River Island State Park OHV Trailhead Phase 2 - Construction Plan Set: Construction plan set and general notes for the River Island State Park OHV Trailhead Phase 2 project (Project No. PB25D011), dated June 11, 2025. The project involves the construction of a new off-road vehicle parking lot and future water/sewer utility connections. The document includes a comprehensive sheet index covering civil, structural, electrical, and landscape plans, as well as general construction requirements and contractor responsibilities regarding staking, permits, and utility coordination.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for River Island State Park – OHV Trailhead Phase 2 Technical Specifications: Technical specifications for Project No. PB-24-013, River Island State Park – OHV Trailhead Phase 2. The document outlines construction requirements for restrooms, water/sewer systems, paving, and landscaping, adhering to 2023 MAG Uniform Standard Specifications. It includes professional seals from J2 Engineering, Entellus, and CRE, dated June 11, 2025.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for River Island State Park - River Island Production Well Technical Specifications: Technical specifications dated December 16, 2024, for the drilling and installation of one water production well at River Island State Park in La Paz County, Arizona. Prepared by Matrix New World Engineering for J2 Engineering & Environmental Design, the document details the scope of work using reverse circulation dual rotary drilling, contractor qualifications, materials, well development, aquifer testing, and a detailed measurement and payment schedule.
PDF
PDF, High priority: read this firstspecifications
HighAI Summary for River Island State Park - Structural Design Calculations: Structural design calculations dated June 09, 2025, for walls and light pole foundations at River Island State Park (Project No. PB-25-011). The document includes technical specifications for cantilevered retaining walls, drilled shaft calculations for parking area light poles, and stability ratios, referencing IBC 2018 and ASCE 7-16.
PDF
PDF, Low prioritybid-tabulation
LowAI Summary for BPM007341 Bid Tabulation: A bid tabulation document from the Arizona Department of Administration General Services Division comparing total and deductive bid amounts for four vendors: Blue World Construction Inc, Low Mountain Construction Inc, Sharp Construction LLC, and TSG Constructors LLC.
PDF
PDF, Low prioritybid-tabulation
LowAI Summary for BPM007341 Bid Tabulation: A bid tabulation document from the Arizona Department of Administration General Services Division comparing total and deductive bid amounts for four vendors: Blue World Construction Inc, Low Mountain Construction Inc, Sharp Construction LLC, and TSG Constructors LLC.
PDF
PDF, Low priorityaward
LowAI Summary for BPM007341 IFB Contract Award and Executive Summary: Procurement determination and award for solicitation BPM007341 (PB-25-011 ASPT-Parker-River Island OHV Phase Two). The document outlines the solicitation timeline, bid tabulation from four vendors, and the final determination to award the contract to TSG CONSTRUCTORS LLC for $2,224,975.00 (minus deductive alternate) as the lowest responsive and responsible bidder.
PDF
PDF, Low priorityaward
LowAI Summary for Notice of Award - ASPT-Parker-River Island OHV Phase Two (BPM00734): Notice of Award dated February 25, 2026, from the Arizona Department of Administration to TSG Constructors, LLC for the ASPT-Parker-River Island OHV Phase Two project (Solicitation No. BPM00734). The award amount is not to exceed $2,224,975.00. The letter outlines required documentation for the final agreement, including insurance certificates and statutory bonds, and requests the scheduling of a pre-construction conference.
XLSX
XLSX, Low priorityother
LowAI Summary for Responsive Responsibility Checklist - River Island OHV Phase Two: A responsibility and responsiveness checklist for TSG Constructors LLC regarding project BPM007341 PB-25-011 ASPT-Parker-River Island OHV Phase Two. It tracks the submission of required documents including the bid schedule, bid bond, qualifications, and various certifications, as well as verification of licensing and registration with the State of Arizona.
ZIP
ZIP
ZIP
ZIP
AI Contract Breakdown
Uniform Contract Format
Contract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
PhaseClosed
Posted
Solicitation
Response Deadline
Deadline has passed
Submission Closed
Find active opportunities like this
Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.
State WILL conduct a NON-MANDATORY Pre-Bid Conference/Site Visit for this Solicitation to be held on Wednesday, January 21, 2026 at 11:00 AM (Arizona Time) Location.https://maps.app.goo.gl/euPgSXcnMqeDeB9B8. If you are going to attend the site visit please sign up before 1/16/2026. https://docs.google.com/document/d/15InXxiZUY3B-7nK4ksdbnMlU4SBsjRDu/edit?usp=sharing&ouid=108741715366085015397&rtpof=true&sd=true