Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

This Solicitation opportunity from California was posted on January 6, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

IFB #S25-33166 Commercial Exhaust Hood Fire Suppression System, Service/ Repair, & Preventative Maintenance Service and Repair

Closed
S25-33166State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
2027016
Solicitation # 2027016
RFP# 2027016 is a unit price bid solicitation issued by the Spartanburg County Government for the Timberlake Circle Culvert Replacement Project in Inman, South Carolina. The scope of work encompasses comprehensive infrastructure improvements, including clearing and grubbing, demolition, the installation of concrete reinforced culverts and wing walls, site grading, erosion control, and asphalt paving. All construction must adhere to SCDOT standards, the Manual on Uniform Traffic Control Devices, and SCDHEC regulations. Key technical requirements include a maximum 10% transition for driveway tie-ins and a mandatory proof roll of all paving areas prior to the arrival of asphalt. The contract is governed by Spartanburg County General Terms and Conditions, requiring contractors to maintain a minimum of 1 million dollars in general liability insurance and comply with South Carolina state laws, including drug-free workplace mandates. Performance is tracked via a mandatory two-week look-ahead schedule submitted every Wednesday by noon. Final completion is achieved only after all pay items and punch list items are approved in writing by the County. Payment is made from appropriated funds, with undisputed invoices due upon receipt and considered past due after 30 days. The project is managed under the oversight of the Spartanburg County Attorney and requires strict adherence to non-discrimination and confidentiality protocols.
Spartanburg County Government

POSTED

1 day ago

DEADLINE

in 27 days
NAICS: 237310
New
Federal
Opportunity Available to NM FERM BPA Zone 1 Contractors ONLY with the USDA Forest Service
Solicitation # 127EAX26Q0102
Solicitation 127EAX26Q0102 is a Request for Quotation for RTLSA Road Maintenance on the Tres Piedras Ranger District of the Carson National Forest in New Mexico. This total small business set-aside is restricted exclusively to responsible contractors on the New Mexico Forest Engineering and Roads Maintenance Blanket Purchase Agreement in Zone 1. The project involves road reconditioning, aggregate surfacing, culvert installation and replacement, and the construction of drainage features and armored fords to support timber projects. The estimated magnitude of the requirement is between 1,000,000 and 5,000,000 dollars, and the award will be a firm-fixed price BPA call. The period of performance requires work to commence within 10 calendar days of the Notice to Proceed and be completed within 150 calendar days, spanning Fiscal Year 2026 to Fiscal Year 2027. Award will be based on best value, granted to the highest technically rated offeror provided the price is fair and reasonable and past performance is acceptable or neutral. Technical evaluations focus on quality, equipment, personnel, and timeliness on a pass/fail basis. Bidders must provide a 20% bid bond and submit pricing for all base and optional line items to be considered responsive. Compliance with the Davis-Bacon Act, the Carson National Forest Fire Plan, and specific sustainable product requirements is mandatory.
Forest Service

POSTED

1 day ago

DEADLINE

in 22 days

AI Contract Overview

Show more

This contract establishes an agreement between the California Department of Rehabilitation and a contractor to provide semiannual or as-needed service, repair, and preventative maintenance for commercial exhaust hood fire suppression systems located in various cafeterias, snack bars, and vending facilities managed under the Department's Business Enterprise Program. These facilities are situated in state, federal, and county office buildings, as well as privately owned locations. The contractor is responsible for inspections, repairs, recharging, replacement of system components, and providing service tags. If a system must be removed for off-site servicing, the contractor must supply a suitable replacement unit at no additional cost to the State to minimize business disruptions. All necessary supplies and equipment are to be furnished by the contractor, who must coordinate closely with Business Enterprises Consultants and vendors while adhering to safety protocols and logistical requirements. Services are to be delivered Monday through Friday, between 7:00 a.m. and 5:00 p.m., excluding holidays, with provisions for after-hours, Sunday, or holiday work at premium rates upon prior written approval. The contractor must respond to service requests within 24 to 48 hours, with emergency repairs prioritized within 24 hours. All repairs come with a 30-day warranty period during which the contractor is responsible for any needed follow-up work at no cost to the Department. Parts and materials charges are capped at 40% above the contractor’s wholesale cost, must be original manufacturer parts, and cannot exceed specified maximum job costs without approval. The contractor must maintain cleanliness and protect facilities during work, promptly report and rectify damages at no cost to the State, and ensure timely and documented communication with facility staff and the Department’s Contract Administrator for service authorizations and completion verification. The contract is managed from Sacramento, California, with Gaurav Chopra as the primary point of contact.

General Info

Contractor provides semiannual service, repair, and maintenance for fire suppression systems in California cafeterias.

Place of Performance

Sacramento, CA, USA

Set-Aside

NONE

Documents

(5)

California STD 204 Payee Data Record

PDF•payee-data-record

DVBE Incentive Program Information and Instructions

PDF•9 pages•special-notice

California Darfur Contracting Act Certification Form

PDF•certification-form

Certified Small Business Participation Form

PDF•4 pages•other

IFB_Solicitation_-_S25-33166.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Rehabilitation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
A) Type of Service 1) The Department of Rehabilitation's (DOR) Business Enterprise Program (BEP) equipment is located in State, Federal, County office buildings, privately owned buildings cafeterias, snack bars, convenience stores and vending machine facilities. 2) The Contractor will provide semiannual, or as required, Commercial Exhaust Hood Fire Suppression System Services, Repairs & Preventative Maintenance for the Department of Rehabilitation¿s Business Enterprise Program cafeterias, snack bars, and vending facilities located in state and federal buildings. The contractor will provide repairs, recharging and service tags to various types of commercial exhaust hood fire suppression systems. Contractor will provide inspections that may lead to repair and/or replacement of fire suppression system components when needed. When exhaust hood systems must be removed for servicing at the contractor¿s facility, the contractor will provide, at no cost to the State, a suitable replacement until the unit has been repaired and installed. Contractor to provide all fire suppression system supplies and equipment. Timely services must be provided to ensure the BEP vendor has limited interruption of business operations. This includes planning logistics, ensuring safety protocols, and coordinating with the Business Enterprises Consultant (BEC) and BEP vendors when necessary. B) Locations Locations listed in Exhibit G are subject to change. The Contractor will be notified through an amendment of any change in locations. C) Service Hours All Services shall be provided five (5) days a week, excluding holidays, between the hours of 7:00 a.m. to 5:00 p.m. For work which needs to be accomplished before or after normal working hours, a charge of one-and-one-half (1-1/2) times the bid rate will be granted. For work which needs to be accomplished on a Sunday or official State holiday, an amount of twice the bid rate will be granted. Prior authorization must be obtained, in writing, from the DOR's Contract Administrator and/or designee for time requested other than normal working hours, Sundays and official State holidays. A list of official State holidays is available from the DOR. D) Estimates The DOR's Contract Administrator and/or designee requires¿ the Contractor to provide an estimate prior to authorizing any services. E) Response Time From the time the DOR initiates a service request to the time the service commences shall not exceed twenty-four to forty-eight (24-48) hours, unless an extension of time is approved by the DOR's Contract Administrator and/or designee. Occasionally, the DOR will inform the Contractor that an emergency condition exists and the Contractor shall complete the required service within a twenty-four (24) hour period to the satisfaction of the DOR. In general, service shall be completed within a reasonable and acceptable time period to the DOR taking into consideration the nature and degree of the difficulty of the work involved. Emergency shall be defined as a health and safety or hazardous working environment situation. F) Call Back Services All work shall be under warranty for thirty (30) days from date of completed repair. Time and costs for call backs to previous repairs under warranty shall be borne by the Contractor. G) Notification The Contract Administrator will notify the Contractor, via an Authorization for Repairs and Service - DR 1308, of location(s) requiring service and location contact person. The Contractor shall schedule service date(s) and time(s) with the BEP vendor. If the BEP vendor or designee is not on site at the scheduled time and date, the Contractor is to contact the Contract Administrator/designee for further instructions. If Contract Administrator/designee cannot be reached, Contractor is to leave the site without performing any service and will charge the DOR one (1) hour at the Contract labor rate. The Contractor shall obtain the BEP vendor or designee¿s signature on the Authorization for Repairs and Service - DR 1308 upon work completion and verification that equipment is in working order and submit signed Authorization for Repairs and Service - DR 1308 for payment. H) Verification of Arrival The Contractor/service technician is required to have the BEP vendor or his or her staffs verify time of arrival on the job site, as well as the time of departure. BEP vendor or his or her staff must be on site while the service is being performed. The Contractor shall leave a copy of the work order signed by the BEP vendor or his or her staff indicating: 1) minimum time of arrival; 2) time of departure; and 3) general description of work performed at the location. I) Parts and Materials The charges for parts and materials shall not exceed forty percent (40%) of the Contractor's wholesale costs; excluding tax, i.e.; $100.00 parts cost x 40%x 7.75 (City Sales) Tax = $129.30. The Department of Rehabilitation may pay any applicable sales and use tax imposed by another State. Only original manufacturer parts and materials shall be used. Removed parts shall be left at the location with the BEP vendor or his or her staff for BEP inspection. The maximum amount that may be charged per job shall be $2,000.00. The maximum amount that may be charged per job may be increased with the approval of the Contract Administrator or the Business Enterprise Program Manager. See Exhibit B - paragraph 1. Invoicing and Payments - Item 9 for parts and materials cost reimbursements. Used or refurbished or rebuilt parts are not allowed. J) Freight Charges Contractor will be allowed to recover freight or shipping costs for parts, with no allowance for mark-up, by: 1) Itemizing the cost of freight or shipping on the invoice. 2) Attaching a copy of the freight or shipping invoice (original whenever possible) to the invoice. 3) An original receipt is required for any freight/shipping cost over $50.00. 4) When the freight or shipping invoice includes costs not specifically associated with the billing, the Contractor will only charge for the costs associated with the billing and note the freight or shipping invoice accordingly. K) Work Area Contractor will ensure that the work area is kept clean and free of debris, as necessary, to maintain a safe working environment in and around the location. While working on equipment, Contractor agrees to perform services with as little disruption to the State¿s and BEP vendor operations as possible. All tools, equipment and other work materials belonging to the Contractor will be removed from the work location at the end of each working day. The State shall not be responsible for storage of any Contractor property. L) State Property 1) It shall be the Contractor's responsibility to make all necessary arrangements with office or building manager and local traffic authorities for use of elevators, loading docks, adjacent streets, sidewalks, and/or malls. 2) Any damages by the Contractor to portions of building, premises, equipment, furniture, material or other property will be repaired or items will be replaced by Contractor to the satisfaction of the DOR with no expense to the DOR. 3) Any damages by the Contractor to portions of buildings or premises for which the DOR is responsible, the DOR may, itself, at its option, repair or replace damages and deduct the cost thereof from the Contractor's invoice. 4) Contractor shall provide dust covers, temporary dust barriers, pads, etc., as required to protect building occupants and contents during its operation. Any items lost or stolen while in the Contractor's custody will be replaced by the Contractor at no expense to the State/Federal government. Contractor must receive approval from the State/Federal government to remove equipment from a location. 5) Floors, walls, and ceilings of buildings, including elevators, will be adequately protected by Contractor to prevent marring and scratching or other damages. The State may, itself, at its option, repair any damage or replace any lost or stolen items and deduct the cost thereof from Contractor's invoice. 6) Contractor shall keep site clean as work progresses. Upon completion of the work, all surfaces involved in this project shall be clean of any foreign material. Contractor shall remove all waste materials from the work site and dispose of as required to maintain a safe working environment.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS