Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Defense was posted on November 2, 2018. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Indefinite Delivery Architect-Engineer Services Contract for HTRW, Primarily Various Locations, Alaska

Awarded
W911KB-17-R-0014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541330
New
SLED
2026 AC Water Main Replacement
Solicitation # 2026-RFQ-042
Solicitation 2026-RFQ-042 is a request for qualifications from the City of Mercer Island Public Works department for professional engineering services to design water system upgrades. The project focuses on replacing approximately 5,000 linear feet of aging asbestos cement water mains with ductile iron mains along SE 40th St and E Mercer Way. The scope is divided into two phases: Phase 1 involves water system and PRV vault replacement on SE 40th St from Greenbrier Ln to 97th Ave SE, and Phase 2 extends the replacement to 97th Ave SE and the 3700 and 3800 blocks of East Mercer Way. Additional components for replacement include fire hydrants and water services. The design must comply with the Reduction of Lead in Drinking Water Act and the City of Mercer Island Standard Details Water. The project follows a goal-based timeline with bid-ready plans for Phase 1 due by Q2 2027 and Phase 2 by Q3 2027, with overall construction completion targeted for Q2 2028. Qualified firms must be licensed in the State of Washington and submit a Statement of Qualifications limited to 12 pages, including a proposed timeline and three references from the last five years. Selection is at the sole discretion of the City, and the awarded firm will negotiate a scope and fee schedule using the City's standard professional services agreement. Administration is managed by the City Manager, with payments issued via City warrant within 45 days of receiving a proper monthly invoice.
Public Works

POSTED

about 12 hours ago

DEADLINE

in 14 days

AI Contract Overview

Show more

This Indefinite Delivery firm fixed price contract, procured under the Brooks A-E Act, seeks qualified Architect-Engineer firms to provide investigation, planning, and design for the cleanup of hazardous, toxic, and radiological wastes, debris, and other environmental contaminants across various locations in Alaska. The contract has a total capacity limit of 72 million dollars over five years, with a maximum task order limit of 20 million dollars. Between one and four contracts will be awarded concurrently, with work allocated based on best value, contractor capacity, and specific technical capabilities. Selected firms must demonstrate comprehensive expertise in CERCLA pre-decisional phases, including remedial investigations, feasibility studies, and risk assessments. Key requirements include providing a multi-disciplined team of professionals, such as program managers, chemists, engineers, geologists, and risk assessors, as well as proficiency in ArcGIS and National CAD Standards. Specific upcoming projects include work at Buskin Beach, the CANOL Pipeline, Fort Morrow, and the Eklutna Army Site, often involving remote arctic or subarctic environments. Awardees must be registered in the System for Award Management and, if they are large businesses, must adhere to specific small business subcontracting goals.

General Info

Contract Value

$72,000,000

NAICS

541330 - Engineering Services

Place of Performance

Primarily Various Locations, Alaska, AK, USA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

5 updates
PhaseAwarded
Posted

Combined Synopsis

Notice updated

Response deadline changed from Dec 3, 2016 to Dec 17, 2016. The notice description changed.

Notice updated

Response deadline changed from Dec 17, 2016 to Dec 30, 2016. The notice description changed.

Notice updated

Response deadline changed from Dec 30, 2016 to Jan 6, 2017. The notice description changed.

Notice updated

Response deadline changed from Jan 6, 2017 to Aug 1, 2017. The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W2SN Endist Alaska
Contacts2 people available
OfficeANCHORAGE, AK, 99506-0898, USA
Office AddressANCHORAGE, AK, 99506-0898, USA
Contacts
Kathy KinnettContract Specialist
Aldone GrahamContract Officer

Full Description

Show more
The following information, posted on 28 June 2017, supercedes all previous versions: 1. CONTRACT INFORMATION: No additional information shall be provided and no solicitation will be issued. Interested firms shall respond by submitting a SF 330 listing their qualifications in accordance with the instructions below. Submittals must be received at the address indicated above not later than 2:00 pm Alaska time on 31 July 2017. This is not a request for proposal. This Indefinite Delivery contract(s) is being procured in accordance with the Brooks A-E Act as implemented in FAR Subpart 36.6. Firms will be selected for negotiation based on demonstrated competence and qualifications for the required work. North American Industrial Classification System code is 541330, which has a size standard of $15,000,000 in average annual receipts. To receive award contractors must be registered in the System for Award Management (SAM). If a large business is selected for this contract, it must comply with FAR 52.219-9 regarding the requirement for a subcontracting plan for that part of the work it intends to subcontract. The FY 2017 subcontracting goals for this contract are a minimum of 41.50% of the contractor's intended sub-contract amount be placed with small businesses, with 25% of that to small disadvantaged businesses, 5% to woman-owned small businesses, 7% to HUB Zone small businesses, and 5% to service disabled veteran-owned small businesses. The subcontracting plan is not required with this submittal. More than one (1) contract is anticipated, but no more than four (4) contracts will be awarded. Because these contracts will share a pool of contract capacity, the contracts will be awarded concurrently. The contract(s) shall be indefinite delivery firm fixed price with a contract limit of $72,000,000 over five (5) years. This MATOC capacity will be shared among all awardees in the unrestricted MATOC pool and the maximum task order limit amount will be $20 million. The first contract award is anticipated for the 2nd quarter of FY 2018. This District currently has contracts in place for like services. The allocation of requirements to each of these contracts will be based on the assessment of best value for the Government, and may include an assessment by the Government of any or all of the following factors: a. Equitable allocation of work among contracts; b. Specific and unique capabilities; c. Apparent capacity of the contractor to perform the anticipated type of work; d. Past performance on earlier orders under the contract, including quality, timeliness and cost control; e. Ability to accomplish the order in the required time, and meet required delivery schedules; f. Experience and/or ongoing work (locality and/or type); understanding of local factors and geography; g. Remaining contract capacity to include potential impact on other orders placed with the contractor; h. Minimum order requirements; i. Available personnel; j. The amount of time contractors need to make informed business decisions on whether to respond to potential orders. In accordance with FAR 36.602, orders placed under any resultant contract(s) will be issued based upon contractor qualifications, following the procedures specified by the evaluation criteria provided below. All responders are advised that this contract may be revised or canceled at any time during the solicitation, selection, evaluation, negotiation and final award. In addition, no projects are yet authorized (see FAR 52.232-18). This solicitation does not guarantee work to selected firms. To be eligible for contract award, a firm must be registered in the System for Award Management (SAM). Register via the SAM Internet site at https://www.sam.gov/portal/public/SAM/#1. 2. PROJECT INFORMATION: The selected A-E firm would be required to have sufficient staff, flexibility, and capability to be available on an as-needed basis. The USACE HTRW program covers investigation, planning and design for cleanup of hazardous, toxic, and radiological wastes (HTRW), debris, military munitions response, and other environmental contaminants at various locations in Alaska. The selected firm must have the skills for and may perform any or all of the following tasks: technical expertise in all phases of environmental and HTRW management; environmental sampling; resource and regulatory agency coordination; RCRA/CERCLA/SARA/TSCA/ADEC compliance as appropriate for specific sites or projects; community relations; developing conceptual site models; performing preliminary assessments; site inspections; remedial investigation/feasibility studies; geophysical investigations, debris inventory, and drum characterization; establishment of Data Quality Objectives (DQOs); developing and implementing sampling analysis, QA/QC or UFP/QAPP, and health and safety plans; validation of chemical data and development of chemical quality assurance reports, reviewing and interpreting analytical chemical data, and developing alternative cleanup levels; performing human health and ecological screening/risk assessments; researching the most appropriate, cost effective remedial actions; preparing remedial action plans; preparing cost estimates; performing underground storage tank assessment work; and completing other tasks related to the investigation and characterization of HTRW and other environmental contaminants (including asbestos, lead-based paint, air emissions, storm water pollution and prevention plans, munitions and explosives of concern, etc.). The selected firm(s) must demonstrate the ability to provide survey-quality computer aided drafting (CAD) drawings in *.dwg format and all support files that conform to and are compatible with the Alaska District CAD systems through the life of this contract, as appropriate. This includes proficiency with U.S. National CAD Standards. The selected firm(s) must also demonstrate the ability to provide geographic information systems (GIS) deliverables compatible with ArcGIS (ESRI) software. Proficiency with the following GIS files is expected: *.mxd files, shapefiles, geodatabases, coverages, and raster imagery, as appropriate. Proficiency with the following GIS work processes is expected: GPS field data collection and processing, datum and coordinate system transformation, georeferencing and rectification, geodatabase development, Spatial Data Standards for Facilities, Infrastructure, and Environment (SDSFIE), and metadata preparation using Federal Geographic Data Committee (FGDC) standards. Laboratories performing analyses in support of this contract must be accredited for each applicable analyte and test method by the Department of Defense Environmental Laboratory Accreditation Program (DoD ELAP), which is compliant with ISO/IEC 17011:2004 standards. As part of this accreditation, all laboratories must demonstrate the ability to generate acceptable results from the analysis of proficiency-testing (PT) sample(s), subject to availability, using each applicable method in the specified matrix. Upon request, laboratories must make available to the Department of Defense, the results of all PT samples analyzed by the laboratory during the period of performance. The Contractor shall ensure the laboratory makes appropriate documentation available to the Government Chemist/QAM. All laboratories are subject to on-site assessments by authorized representatives of the Department of Defense. If the project work is sited in Alaska, the project laboratory must also hold current Alaska Department of Environmental Conservation (ADEC) approval for the appropriate analytes and methods. All deliverables required under individual task orders (reports, databases, figures, maps, etc.) shall be in the formats outlined in the most current Alaska District Corps of Engineers Environmental Engineering Branch Manual for Electronic Deliverables (MED, current version is April 2017). The MED requires data to be provided in standard formats that can be utilized more easily in the future. All plans and documents shall be submitted in electronic versions consistent with this guidance and as identified in the individual task orders. Submissions shall contain all drawings, photographs, and reports in native and pdf format in accordance with this guidance. A copy of the current MED will be made available to the contract awardees. In some task orders, all MED specifications will not be required; any allowed deviations to the MED will be documented in each task order. Specific projects planned for this contract include a Remedial Investigation at Buskin Beach on the Kodiak Navy/Army site, a Site Inspection at several pump stations along the CANOL Pipeline, continuation of a Remedial Investigation at the Eklutna Army Site, and continuation of a Remedial Investigation at Fort Morrow in Port Heiden. Additional task orders will be awarded on the IDA-E contracts as they are identified and programmed. The projects listed below are representative of the type of projects contractors should expect. The intent is to award each of these projects on this Indefinite Delivery Architect-Engineer contract (IDA-E). The following is a brief scope for each of these projects: Buskin Beach, Kodiak Buskin Beach is located in the Kodiak Island Borough, near the Kodiak Airport and Buskin River. Soil and groundwater are contaminated with a mixture of Bunker C and heating oil, deposited during WWII. The scope-of-work involves evaluating and presenting existing chemical and hydrogeologic data to assess groundwater flow. This analysis will be used to formulate a conceptual site model for the site. Additionally, three samples each of groundwater and product will be collected and analyzed for volatile petroleum hydrocarbons (VPH) and extractable petroleum hydrocarbons (EPH), to determine the aromatic, aliphatic and polar compound concentrations in the NAPL and groundwater. These data will be used to assess dissolved phase migration downgradient of the source area toward the Buskin River using a model to characterize fate and transport of contaminants through time and potential ecological risk to the Buskin River. The fate and transport calculations will be compared to previously-measured concentrations in the downgradient monitoring wells. Additionally, an effort will be undertaken to delineate the eastern edge of the boundary of the plume. 12 borings will be advanced in this effort. Two soil samples, one from near the water table and one from the vadose zone, will be collected from each boring and analyzed for diesel range organics (DRO) and residual range organics (RRO) via ADEC methods AK102 and AK103. Four of the borings will be completed as monitoring wells. One groundwater sample will be collected from each of the four wells and analyzed for DRO and RRO via methods AK102 and AK103. Groundwater samples will also be evaluated for Total Aromatic Hydrocarbons (TAH, or BTEX) and Total Aqueous Hydrocarbons (TAqH, or BTEX + Polynuclear Aromatic Hydrocarbons (PAHs)) by analyzing via EPA Method Methods 8021B or 8260B to quantify monoaromatic hydrocarbons and to measure TAH; and EPA method Methods 8270C (including SIMS) or 8310 for the list of 16 Polynuclear Aromatic Hydrocarbons listed by EPA Method 610. All locations of borings and samples will be surveyed for horizontal coordinates only. Deliverables are a pre-draft, draft and final work plan, to include a sampling and analysis plan, site safety and health plan and contractor quality control plan, and pre-draft, draft and final report. In accordance with the Manual for Electronic Deliverables (MED). CANOL Pipeline The CANOL pipeline extends for 605 miles from Whitehorse, Canada, to Fairbanks, Alaska. About 296 miles of the pipeline are in Alaska. The pipeline located in Canada is not eligible for DERP-FUDS funding. Along the 296 miles of pipeline, there are 1,079 tracts of land, owned by approximately 444 landowners. The CANOL project consists of the former pipeline right of way, possible dumps, staging areas and camps associated with construction of the pipeline; and valves, pump stations and maintenance facilities associated with operation of the pipeline. Operation of the CANOL pipeline ended in 1955, and since then much of the pipeline and associated facilities have been removed or demolished by contractors working for the Federal government or private individuals acting on their own. Fuel leaks and spills from operation of the pipeline may pose a risk to local residents. Contaminant sources include pipeline appurtenances associated with fuel storage and distribution, as well as sources associated with ancillary service of the CANOL pipeline (personnel camps and infrastructure, 55-gallon drums, oil cans, miscellaneous debris). Suspected contaminated media includes soil (surface and subsurface), groundwater, surface water, and sediment. The scope will include preparing planning documents, evaluating the nature and extent of contamination, reporting, and the associated project management. Media to be sampled and order of magnitude will vary by site, but will include soil, groundwater, surface water, and/or sediment. General fieldwork, sampling methodology, frequency, and standards shall conform to ADEC guidance documents, 18 AAC 75, 18 AAC 78, and ADEC UST procedures manual. Direct push and hollow-stem drilling methods typically achieve necessary soil sampling and groundwater well requirements, although air-rotary capabilities may be necessary in extreme cases. Typical contaminants of concern (COCs) include gasoline ranges organics (GRO), DRO, RRO, volatile organic compounds (VOCs), semivolatile organic compounds (SVOCs), and RCRA metals. Additional analytes may include ethylene dibromide (EDB), dichloroethane (DCA), and polychlorinated biphenyls (PCB). Environmental Laboratory Accreditation Program (ELAP) certification will be required for all appropriate analytical methods. Appropriate detection limits, limits of detection, and limits of quantitation to evaluate ADEC promulgated cleanup levels will be required. Analyses of historical documents, georeferencing of as-built drawings and historical photos necessary to locate sites and site features may be required. Coordination with SHPO for permitting may be required. GPS capabilities that adhere to the requirements of the MED are necessary. Geophysics may be required to locate subsurface site features and/or utilities. All deliverables are required to conform to the standards and specifications outlined in the MED, as well as ADEC Site Characterization Work Plan and Reporting Guidance. Deliverables will include draft and final work plans, updated ecological and human health conceptual site models and draft and final Site Investigation reports. Organizing and leading public meetings to inform local communities about proposed field efforts and incorporate public concerns into planning/reporting documents and the field efforts themselves is required. Meeting requirements typically include adequate advertising of the meeting to the local community, capacity to accommodate up to 20 meeting attendees, handicapped/disabled accessibility, teleconferencing capability, and multimedia presentation capability. Fort Morrow Additional RI work is required at the former Fort Morrow Army Post, located at Port Heiden, Alaska. Under the Formerly Used Defense Sites Program, the former Fort Morrow is eligible for environmental restoration funding. A remedial investigation is required under the Comprehensive Environmental Response, Compensation, and Liability Act prior to performing extensive remediation activities. A contractor conducted remedial activities between 2011 and 2015, and submitted a Final Phase II Remedial Investigation Report in November 2016. Additional investigation will be required to fully characterize the site. Closure of the Fort in 1945 resulted in the documented abandonment of thousands of drums of aviation fuel, petroleum, oil, lubricants, and other maintenance fluids. As a result of RI activities performed to date, the former Fort Morrow was divided into 13 Areas of Concern (AOCs), A through M, based on military activities that occurred within each area. A total of 195 features were screened for petroleum, oil, and lubricant (POL) contamination between AOC B (21 features), AOC M (171 features), AOC E (one feature), and AOC F (two features). Data gaps remain and additional soil and groundwater samples will be required to fill these gaps. Additional RI work will include surface and subsurface soil sampling (up to 100 samples) and the installation and sampling of additional monitoring wells (up to six). It is possible that additional geophysical surveys may need to be conducted (three areas) with subsequent test pits dug (up to two per survey area). Anticipated deliverables include a draft and final UFP-QAPP, Health and Safety Plan, project Fact Sheets, and draft and final reports in compliance with the MED. The contractor will host a public meeting in Port Heiden to present the status of the RI. The contractor will compare existing data from previous RI work against applicable cleanup levels. Eklutna Army Site The Eklutna Army Site is located 26 miles northeast of Anchorage, Alaska. The site was used by the United States Army as a suspected supply and storage area from 1957 to 1971. Widespread chlorinated solvent contamination has been identified in the site soils and groundwater. Hydrogeology at the site is extremely complex due to the Eklutna River, Chugach Mountains, and Cook Inlet. The Phase III RI will include the installation of additional groundwater monitoring wells, a tidal influence study, groundwater modelling, additional soil gas and sediment sampling, and a complete human health and ecological risk assessment that evaluates all likely future land use scenarios. The field portion of the Phase III RI will include the installation and sampling of 25 monitoring wells. Some wells will extend to more than 150 feet bgs. The Contractor will also collect approximately 10 sediment samples and 25 soil gas samples that will be used to support the risk assessment. The tidal study will be complex and likely include evaluating tidal influences on 10 monitoring wells. Deliverables from the Phase III RI will include an RI work plan, risk assessment work plan, RI report, and Risk assessment Report prepared according to the MED. Table 1 shows the anticipated workload that the IDA-E contracts will support. Table 1: IDA-E Contract Projected Workload Program FY17 FY18 FY19 FY20 FY21 FUDS $17,000 $18,000 $18,000 $20,000 $20,000 Army $15,000 $12,000 $12,000 $12,000 $12,000 Air Force $4,000 $4,000 $4,000 $4,000 $4,000 Other (BLM, Coast Guard) $1,000 $1,000 $1,000 $1,000 $1,000 Total: $32,000 $35,000 $35,000 $37,000 $37,000 Note: In $,000 Nature of Work: The selected Architect-Engineer (A-E) firm(s) would be required to have sufficient staff, flexibility and capability to be available on an as-needed basis and will be required to perform a full range of investigation, planning, and design for cleanup of HTRW, debris and other environmental contaminants within the State of Alaska. The task orders delivered under this contract will have low to high risk levels of complexity, pace, novelty, and technology. The majority of A-E environmental work for this contract is expected to encompass project scopes ranging from $100,000 to $10M. The A-E will likely be required to simultaneously complete multiple task orders. The work is pre-decisional and includes all CERCLA phases from preliminary assessment through record of decision/decision document, including chemical sampling; resource and regulatory agency coordination and compliance for specific sites and projects; community relations; developing conceptual site models; performing preliminary assessments; site investigations; remedial investigation/feasibility studies; geophysical investigations, debris inventory, and drum characterization; performing human health and ecological exposure/risk assessments; and other tasks related to the investigation and characterization of HTRW and other environmental contaminants (including asbestos, lead-based paint, etc.). The majority of projects will be located in arctic and subarctic locations, including some in geographically remote and undeveloped areas featuring harsh environmental conditions. 3. LOCATION: Various Locations, Primarily Alaska. 4. SELECTION CRITERIA: The candidate A-E firms shall be ranked in accordance with the selection criteria. The following selection criteria are listed in descending order of importance. Criteria (A)-(D) are primary selection criterion: (A) Minimum requirements for professional qualifications. AE Firms need to show the organization of the team that will support the HTRW contract as well as the qualifications of the staff on that team. The same person can meet the experience requirements of more than one position by submitting a resume specific to each position. The following are experience requirements for various positions on the team: (1.) Program Manager: One (1) senior level staff with a minimum of 10 years of professional experience of which 5 years shall be as a program manager or project manager of complex environmental investigation or remediation projects. This person will be responsible for overall management of the HTRW contract, including quality assurance and quality control of all deliverables. The Program Manager must show experience managing CERCLA pre-decisional projects (Preliminary Assessments, Site Inspections, Remedial Investigations, Treatability Studies, Feasibility Studies or Record of Decisions/Decision Documents). Having current professional registration (PE, PG, PMP, etc.), experience with remote Alaska projects, and experience with the Formerly Used Defense Site Program (FUDS), Army or Air Force Installation Restoration Program (IRP), and other Federal agencies is preferred. (2.) Project Manager: Three (3) staff with a minimum of six (6) years of professional experience of which four (4) years are specifically related to management of investigation or remediation of contaminated sites. This person will be responsible for management of one or more task orders issued on the HTRW contract. The Project Manager must show experience managing CERCLA pre-decisional projects (Preliminary Assessments, Site Inspections, Remedial Investigations, Treatability Studies, Feasibility Studies or Record of Decisions/Decision Documents). Having current professional registration (PE, PG, PMP, etc.), experience with remote Alaska projects, and experience with the Formerly Used Defense Site Program (FUDS), Army or Air Force Installation Restoration Program (IRP), and other Federal agencies is preferred. (3.) Senior Chemist: One (1) chemist with a minimum of six (6) years of professional experience related to providing chemistry support to environmental site investigations. This person must show experience with the Uniform Federal Policy for Quality Assurance Project Plans, the DoD Quality Systems Manual, ADEC analytical requirements, ADEC data quality work sheets, and project/program data quality management. The Senior Chemist must show experience communicating with subcontracted laboratories to ensure samples are run for the required methods and level of quality. Experience related to performing EPA test methods in an analytical laboratory is preferred. Experience with Environmental Resources Program Information Management System (ERPIMS) is preferred. Experience with remote Alaska projects is preferred. (4.) Professional Engineer: Two (2) professionally registered Environmental or Civil Engineers. All engineers must demonstrate a background in at least one of the following phases of work: investigations to characterize nature and extent of contamination in soil and groundwater or preparation of treatability or feasibility studies. Experience with multiple phases of work is preferred. Experience with remote Alaska projects is preferred. (5.) Professional Geologist: One (1) professionally registered geologist with recent (within the past five (5) years) experience in sampling media at contaminated sites and preparing site investigation reports. The geologist shall meet the requirements of an ADEC qualified person as defined by 18 AAC 75.990(100). The Professional Geologist must demonstrate experience overseeing different drilling methods. Experience with Alaska projects is preferred. (6.) Staff: Four (4) staff with a minimum of four (4) years of professional experience each. Include staff that will assist the PMs on awarded tasked orders. These staff can include scientists (chemists, geologists, environmental scientists, biologists) and engineers (environmental, civil, geotechnical, etc.) that fill out the remainder of the project team not mentioned above. Staff shall meet the requirements of an ADEC qualified person as defined by 18 AAC 75.990(100). These staff must show recent (< 4 years) experience performing at least one of the following activities: writing work plans, performing field sampling, preparing reports, or managing and analyzing data. Experience with CERCLA pre-decisional site investigation activities is preferred. Experience with Alaska projects is preferred. (7.) GIS/CADD: One (1) employee with a minimum of two (2) years' experience providing GIS support to environmental projects. The employee must show experience managing geodatabases to include various data sources, such as chemical data, survey data and aerial photos; experience creating figures using georeferenced data to depict the results of site investigations and accurately display site features and vicinity. Experience preparing MED compliant deliverables is preferred. (8.) Risk Assessor(s): One (1) or two (2) risk assessors with a minimum of six (6) years each of experience writing risk assessment work plans, managing and analyzing data for risk assessments, and preparing baseline human health or ecological risk assessment documents in accordance with ADEC or EPA guidance. The key personnel requirements may be met by either one person with experience in both human health and ecological risk assessment, or two (2) persons with experience in either human health or ecological risk assessment. Demonstrated experience with CERCLA regulated sites is required. Experience preparing risk assessments for ADEC regulated sites is preferred. Experience with Alaska projects is preferred. (9.) Archeologist: One (1) archeologist with a minimum of a graduate degree in archaeology, anthropology, or closely related field, plus at least one (1) year of full-time professional experience, at least four (4) months of supervised field and analytic experience in general North American archaeology, and demonstrated ability to carry research to completion. Field experience with Alaska projects is preferred. (10.) Certified Industrial Hygienist: One (1) American Board of Industrial Hygiene certified industrial hygienist who has experience with characterization of environmental sites is preferred. Experience with Alaska projects is preferred. (11.) Senior UXO Supervisor (SUXOS): One (1) senior unexploded ordnance supervisor (SUXOS) meeting the qualification as described in Technical Paper 18 - DDESB Minimum Qualifications for Personnel Conducting Munitions and Explosives of Concern-Related Activities, July 2015. NOTE: AE Firm(s) should be multi-disciplined in the environmental field but may subcontract certain specialized work such as, but not limited to: underground storage tank assessment work; preparation of risk assessments; treatability studies; and chemical data validation. Responding firms must address each discipline, clearly indicate which shall be subcontracted, and provide a separate SF330 Part II for each subcontractor. The first resume(s) presented in the proposal will be considered for each subject position. Additional resumes beyond the number requested above for Criteria (A) will not be reviewed. Resumes for positions not listed above will not be considered. A multi-disciplined AE firm with limited dependency on subcontracted personnel is preferred. (B) AE firms shall show specialized experience in the below areas. AE firms and their subcontractors shall show technical competence in the following areas (experience with Alaska projects is preferred). The effectiveness of the proposed project team (including management structure; coordination of disciplines, offices and/or subcontractors; and prior working relationships) will also be examined. NOTE: Submit projects which have been performed no longer than ten (10) years preceding the issue date of the synopsis; there is no minimum percentage of completion required for the submitted projects. (1.) Preparing planning documents and establishing data quality objectives for contaminated site investigations, including work plans and UFP-QAPPs in accordance with state and federal guidance. Documents prepared for CERCLA pre-decisional tasks is preferred. (2.) Executing complex environmental investigations with a variety of contaminants, multiple media (soil/groundwater/ sediment/surface water/air) and numerous point sources. Experience performing CERCLA environmental investigations for pre-decisional phases (Preliminary Assessment, Site Inspection and Remedial Investigation) is preferred. (3.) Preparing remedial investigation and feasibility study reports, human health or ecological risk assessments, proposed plans, decision documents/records of decision, Five Year Reviews, and community relations plans for sites regulated by CERCLA, RCRA, and/or ADEC. NOTE: The intent of Section B is to present relevant project experience. Limit each project to a single site or task order. Where experience gained over an entire contract is presented as project experience, the experience will not be considered. (C) AE firms shall show capacity to develop and maintain schedules, accomplish required work in the required time, and at the required quality level. Demonstrated experience in the development and maintenance of project schedules utilizing software programs such as Microsoft Project is required. (D) AE firms shall show past performance on DOD and other contracts with respect to cost control, quality of work, and compliance with schedules as listed in Criteria C. NOTE: Criteria (E)-(G) are secondary and will only be used as 'tie-breakers' among firms which are rated as technically equal after the interview phase of the selection process. The secondary selection criteria in descending order of importance are: (E) Small Business Participation: Extent of participation of small businesses to include service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns in performance of the contract, measured as a percentage of the total estimated value of the acquisition. (F) AE firms shall show geographic proximity to the area of required performance. (G) Prime AE firms shall show volume of DoD contract awards over the past 12 months. Describe nature of work performed for each contract and the dollar amount. 5. SUBMISSION REQUIREMENTS: Firms submitting their qualifications should provide TWO (2) hard copies of the SF 330 and ONE (1) electronic copy on a compact disk and must include the following additional information as indicated: a) Part I, block c (11): include if previously worked with subcontractor and estimated percentage involvement for each team member; b) Part I, block F (24): include value for professional fee for each project identified; and c) Part I, block H (30): summarize your team's capabilities and professional qualifications. Section H shall include no more than 20 pages. The latest available edition of the SF330 MUST be used, and may be obtained from the Government Printing Office at: http://www.gsa.go...

More opportunities from Department Of Defense → W2SN Endist Alaska

Same awarding agency

NAICS: 237990
New
Federal
Lowell Creek Tunnel Repairs, Seward, Alaska
Solicitation # W911KB27BA005
The Department of Defense, through the Alaska District of the U.S. Army Corps of Engineers, is issuing a presolicitation notice for the Lowell Creek Tunnel Repairs in Seward, Alaska. This project involves repairing worn areas and installing new center rails within a 2,100-foot, horseshoe-shaped tunnel that diverts Lowell Creek through Bear Mountain into Resurrection Bay. The scope of work includes structural repairs to the intake transmission tunnel and outlet, the construction of a concrete channel, and the use of abrasion-resistant concrete featuring silica fume and fly ash or slag for alkali-silica reactivity mitigation. The contractor will be responsible for providing all labor, equipment, materials, and supervision, including managing tunnel dewatering and winter construction challenges and implementing a temporary flood management plan. The project will be awarded as a firm-fixed-price contract under NAICS code 237990, with an estimated construction magnitude between 10 million and 25 million dollars. The solicitation is expected to be available via SAM.gov on or after November 3, 2026, with an anticipated award date in December 2026. The period of performance is estimated at 1,000 calendar days. Bids will be accepted electronically through the PIEE Solicitation Module under solicitation number W911KB27BA005. All offerors must be registered in SAM.gov, and the contract will adhere to Construction Wage Rates.
Other Heavy and Civil Engineering Construction

POSTED

1 day ago

DEADLINE

N/A
View Details
NAICS: 236220
New
Federal
Market Intelligence for EIE483 and EIE484
Solicitation # W911KB27RWP11
The U.S. Army Corps of Engineers, Alaska District, is seeking market intelligence via a Request for Information for two Military Construction projects at Eielson Air Force Base, Alaska. The first project, EIE483, involves the design and construction of a Joint Mobility Center Expansion, including a Deployment Processing Facility, hazardous materials storage, and exterior covered storage canopies, with an estimated magnitude of 249.2 million dollars. The second project, EIE484, consists of constructing a 225-bed permanent party dormitory with an estimated magnitude of 305 million dollars. Both projects are planned for a period of performance from FY27 through FY31, with design starting in FY27 and construction beginning in FY28 for the dormitory and FY29 for the mobility center. The government intends to utilize Other Transaction Agreements under 10 U.S.C. 2808a, with a planned two-phase approach consisting of design and pre-construction services followed by final design and construction. Potential delivery methods under consideration include Progressive Design-Build or Construction Manager at Risk. This RFI is strictly voluntary and is being used to assess industry capabilities, budget realism, and preferred acquisition strategies. Interested parties must submit the Market Intelligence Questionnaire by October 29, 2026, at 14:00 Alaska Time. The projects fall under NAICS code 236220 for Commercial and Institutional Building Construction, with a small business size standard of 45 million dollars.
Commercial and Institutional Building Construction

POSTED

6 days ago

DEADLINE

in 9 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS