Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Defense was posted on April 10, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Indefinite Delivery Indefinite Quantity Paving - Fort Stewart/Hunter Army Air Field, GA

Closed
WG-304-9JFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation (MTC), operating the Joliet Job Corps Center, is seeking quotes for a fixed-price, single lump sum subcontracting opportunity to perform road and parking lot repairs in Joliet, Illinois. The project scope includes asphalt pavement replacement covering approximately 62,500 square feet across five key areas, including the guard shack, dorm parking lot, west side of dorms, kitchen/BCT, and dumpster/maintenance areas. Additionally, the contractor is responsible for repairing five drain structures and five potholes. The estimated contract value ranges from $100,000 to $250,000, with a performance period of 90 consecutive business days following a written Notice to Proceed. Bids are due by October 21, 2026, at 3:00 PM CT and must be submitted via email to Fran McGraw. To be considered, bidders must complete a mandatory physical site visit, provide a detailed cost breakout, and submit the MTC Bid for Lump Sum Contract form. For bids equal to or greater than $25,000, a bid bond guarantee of 20% is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. This opportunity is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. The project is subject to Construction Wage Rate Requirements, necessitating compliance with prevailing wages and the submission of weekly certified payroll. Award decisions will be based on overall best value. Payment is processed through pay applications using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance is contingent upon a successful final inspection and the submission of two complete sets of Operation and Maintenance manuals and product data sheets.
Joliet Job Corps

POSTED

about 2 hours ago

DEADLINE

in 1 day
NAICS: 237310
New
SLED
Environmental Trust Department, Owhi Flats 2026
Solicitation # Owhi-Flats-RFB-2026.pdf
The Confederated Tribes of the Colville Reservation Environmental Trust Department is soliciting bids for the Owhi Flats 2026 project, a firm fixed price construction contract focused on watershed restoration within the Little Nespelem WMU. The primary objectives are to improve water quality, enhance riparian habitats, promote natural water flow, and reduce the impact of open-road density on wildlife. The scope of work requires the contractor to decommission six road segments totaling 3.29 miles, install two tank traps, and transport all removed non-natural materials, such as culverts and fencing, to a COR-approved disposal facility. All activities must adhere to specific Colville Indian Reservation Tribal Law and Order Codes regarding cultural resources, forest practices, water quality, hydraulic practices, fire management, and industrial safety, as well as 43 CFR 10.4 for inadvertent discoveries. This is an Indian Preference set-aside under the Tribal Employment Rights Ordinance (TERO), requiring a minimum of 51 percent of seasonal or project-based employees to be of Indian preference origin. Award will be granted to the lowest, responsive, and responsible bidder who demonstrates technical experience in stream crossings, road cross drainage, and bank stabilization. Bidders must submit a comprehensive packet by October 29, 2026, including a signed bid sheet for the entire project, a detailed work plan with equipment and schedules, TERO certification, a debarment form, and proof of liability insurance of at least 1,000,000 dollars. The Contracting Officer Representative (COR) will oversee material acceptance and work plan approval to ensure compliance with environmental and safety standards.
Confederated Tribes of the Colville Reservation

POSTED

about 2 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2027022
Solicitation # 2027022
RFP 2027022 is a unit price solicitation issued by the Spartanburg County Government for the Tier 3 Subdivision Reclamation project focusing on Group 1, specifically the Timberlake and Wicklow areas in South Carolina. The scope of work involves road reclamation and paving, with core requirements including the installation of 2 inch Surface C and 8 inch CMRB Method B, as well as the application of temporary and thermoplastic pavement markings. Technical specifications require the use of a sloped edge longitudinal shoulder joint attachment per SCDOT Standard 401.3.19.2, with devices sourced from Qualified Products List 75. Additional project components include 8 inch full depth patching, removal and disposal of existing asphalt pavement for driveway tie-ins, maintenance stone, and as-needed wrecker services. The contract is administered as a unit price agreement where final payment is based on field-verified quantities of work performed. Proposers must maintain minimum insurance coverage, including 1 million dollars in general liability, and certify compliance with the Federal Civil Rights Act, the Americans with Disabilities Act, and the Drug Free Workplace Act. Proposals must remain valid for 60 days following the opening date. Payment for undisputed invoices is due upon receipt and considered past due after 30 days, with no interest accruing on late payments. All work must adhere to industry standards and SCDOT specifications, and the contract is subject to appropriation by the county.
Spartanburg County Government

POSTED

about 3 hours ago

DEADLINE

in 9 days
NAICS: 237310
New
SLED
2026-40 Capital Connector Construction Project
Solicitation # 2026-40
The City of Charleston, West Virginia, is soliciting bids for the Capital Connector Project, a multimodal corridor improvement initiative funded by a federal RAISE grant. The project aims to transform the Kanawha Boulevard Bike and Walkway corridor into a complete street, encompassing approximately 3.25 miles of improvements along Kanawha Boulevard East (US Route 60) from Magic Island to the 35th Street Bridge, as well as 0.25 miles of safety upgrades on Greenbrier Street. Key deliverables include lane reductions, protected intersection improvements, signal modifications, the installation of bioswale systems, and the widening of shared-use paths. All work must adhere to 2023 WVDOH Standard Specifications, ADA Section 504, PROWAG standards, and the Build America Act and Buy America requirements. Eligible bidders must be listed on the West Virginia Division of Highways' Prequalified Contractors List and must not be delinquent in Business and Occupation taxes or owe more than 1,000 dollars to the state or its political subdivisions. The contract will be awarded to the lowest responsive and responsible bidder, with a performance period of 548 calendar days from the Notice to Proceed. Bids must be submitted electronically via BidExpress by December 3, 2026, and must include a bid bond for 5 percent of the total amount. Successful vendors are required to provide performance and labor/material payment bonds for 100 percent of the contract value, maintain commercial general liability insurance of at least 1,000,000 dollars per occurrence, and comply with Davis-Bacon prevailing wage standards.
City of Charleston

POSTED

about 4 hours ago

DEADLINE

in about 1 month
NAICS: 237310
New
Federal
Guardrail Installation, Mansfield Hollow Lake, Mansfield, CT
Solicitation # W912WJ27QA003
Solicitation W912WJ27QA003 is a firm-fixed-price construction contract issued by the Department of Defense, W2SD Endist New England, for the installation of approximately 250 linear feet of new pressure-treated wooden guardrail at the Mansfield Hollow Dam in Mansfield Center, Connecticut. The project requires the contractor to provide all necessary equipment, materials, and labor, ensuring posts are set three feet below and three feet above finished grade, spaced every six feet on center and secured with carriage bolts. The estimated magnitude of construction is between $25,000 and $100,000, with a period of performance of 210 calendar days from the receipt of the notice to proceed. Work is restricted to Monday through Friday, from 7:00 AM to 3:30 PM. This procurement is a total set-aside for small business vendors under NAICS code 237310. To be considered responsive, vendors must maintain an active registration in SAM.gov and submit comprehensive documentation covering technical capabilities, price, and past performance from the last three years. Key safety requirements include strict adherence to USACE EM 385-1-1 standards and the submission of an Accident Prevention Plan, Activity Hazard Analysis, and Site Safety and Health Officer Designation Letter within 21 days of the notice to proceed. No field work may begin until these pre-construction submittals are accepted. Award will be granted to the responsible vendor whose quotation is most advantageous to the government based on a comparative evaluation of price and technical factors.
W2SD Endist New England

POSTED

about 6 hours ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
Solano State Route 12 Pavement Preservation (04-0AA53)
Solicitation # 04-0AA53
The Solano State Route 12 Pavement Preservation project (EA 04-0AA53) is a Caltrans District 4 initiative located in Solano County, California, spanning State Route 12 between postmiles 14.10 and 20.68. With a total programmed cost of approximately 37.388 million dollars, the project focuses on comprehensive roadway improvements including pavement dig-outs, cold planing, asphalt concrete overlay, and the installation of AC dikes. Additional scope elements include shoulder widening, drainage improvements, the upgrade of metal beam guardrails, traffic signing panel updates, and the installation of centerline and shoulder rumble strips and pavement delineation. The project is governed by the 2025 Caltrans Standard Specifications, with specific requirements for job site management and the handling of hazardous waste and contamination. Environmental compliance is a primary focus, as evidenced by a Mitigated Negative Declaration under CEQA and the requirement for various permits, including a 1602 Lake and Streambed Alteration Agreement and a Section 401 Clean Water Act Permit. Strict protocols are in place for the delineation of Environmentally Sensitive Areas using high-visibility markings and the implementation of biological inspection measures for pipes, culverts, and open trenches. The project also adheres to Title VI of the Civil Rights Act and the Americans with Disabilities Act to ensure non-discrimination and accessibility.
Caltrans, District 4 - Bay Area/Oakland

POSTED

about 11 hours ago

DEADLINE

N/A
NAICS: 237310
New
SLED
CONSTRUCTION ON STATE HIGHWAY IN SANTA CRUZ COUNTY 0.1 MILE SOUTH OF SARATOGA TOLL ROAD AT THE SAN LORENZO RIVER
Solicitation # 05-1K9014
The California State Department of Transportation (CalTrans) is soliciting bids for contract 05-1K9014 to construct a bridge structure for fish passage restoration on State Highway Route 9 in Santa Cruz County. Located 0.1 mile south of Saratoga Toll Road at the San Lorenzo River, the project involves the construction of the northbound bridge and pavement sections, the implementation of reversing traffic for vehicles and bikes, and the relocation of AT&T underground fiber to an overhead position. All work must adhere to 2025 Standard Specifications and Standard Plans, with project plans approved as of May 4, 2026. The contract is awarded on a unit price basis, with specific line items including concrete barriers, thermoplastic traffic striping, and asphalt concrete rumble strips. The project mandates strict adherence to environmental work windows for creek activities and requires a full-time, on-site Safety Quality Control Manager. Quality standards include a welding QC plan, specific test sample lengths for reinforcing steel, and compliance with the RWQCB basin plan for local materials. Contractors must comply with Buy America/Build America requirements and pay the higher of either the U.S. Secretary of Labor or the California Department of Industrial Relations prevailing wage rates. Additional requirements include the submission of DVBE quotes and certificates of reported compliance for off-road diesel-fueled vehicles. Bids are due by December 3, 2026, and contractors must provide a 72-hour notice before starting job site activities.
California State Department of Transportation (CalTrans)

POSTED

about 11 hours ago

DEADLINE

in about 1 month

General Info

NAICS

237310 - Highway, Street, and Bridge Construction

Place of Performance

GA, 31314, USA

Set-Aside

HZC

Documents

6

Amendment 0002 - W9124M20B0002 IDIQ Paving

PDF, High priority: read this first3 pages · amendment
High

FS-4043 / H-2031 Paving Details Sheet

PDF, High priority: read this first12 pages · specifications
High

W9124M20B0002 Amendment 0001 - IDIQ Paving

PDF, High priority: read this first11 pages · amendment
High

W9124M20B0002 Amendment 0003 - Bid Opening Change

PDF, High priority: read this first2 pages · amendment
High

W9124M20B0002 IDIQ Paving Solicitation

PDF, High priority: read this first262 pages · ifb
High

W9124M-20-B-0002 Bid Abstract - IDIQ Paving FS/HAAF

PDF, Low priority1 page · other
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Presolicitation

Type Changed

Presolicitation → Solicitation

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Apr 6, 2020 to Apr 9, 2020.

Response Deadline

Deadline has passed

Notice updated

Notice details unchanged. Attachments may have changed.

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W6QM Micc-Ft Stewart
Contacts2 people available
OfficeFORT STEWART, GA, 31314-3324, USA
Office AddressFORT STEWART, GA, 31314-3324, USA

Full Description

Show more
Mission and Installation Contracting Command (MICC) Fort Stewart, GA is issuing a SOLICITATION NOTICE for a Invitation for Bid (IFB) firm fixed price construction contract for a Paving Indefinite Delivery Indefinite Quantity (IDIQ) contract to construct new parking lots, new asphaltic, paved roads, resurface existing pavements, pavement striping, concrete work, modify existing traffic light signal system and remove/install fencing at any location that is owned by the Fort Stewart/Hunt Army Air Field (HAAF) Reservation. This acquisition is 100% competitive HUBZone set aside under NAICS 237310 Highway, Street and Bridge Construction (Size Standard $39.5 Million). The magnitude of the procurement is estimated to be between $10,000,000 and $40,000,000. The purpose of this project is to construct paving requirements on Fort Stewart/HAAF. The contractor shall provide all plant, supervision, labor, materials, equipment, supplies and transportation necessary to complete this scope of work. Except as provided elsewhere in this contract, all work shall comply with applicable State, local and Federal laws and regulations, industry and construction codes and standards, manufacturer's specifications and recommendations, and all contract special provisions, terms and conditions. All work under this contract will be performed within the confines of the Fort Stewart/HAAF Military Installation, GA. The bid guarantee in the amount shall be at least 20% of the total bid price for the base year. Performance and payment bonds must equal 100 percent of the original contract price. Payment and Performance Bonds shall be required at the Task Order level, the price payable shall be 100% of the task order price. An organized site visit will be held at Fort Stewart, BLDG 621, 3rd Floor Conference Room, 09:00 AM 17 March 2020 for this procurement. Details of the site visit are available in the solicitation, section L. Bids due 6 April 2020 and completing contract performance within the timeline specified in the task orders. The technical exhibits will be available for inspection without charge thru the Contract Opportunities at https://www.beta.SAM.gov. No paper copies of this solicitation are available. Once the solicitation is posted, it is incumbent upon the interested parties to review this site frequently for any updates/amendments to all documents. Interested parties must be currently registered in the System for Award Management (SAM) at https://www.sam.gov to receive a government contract award. Offerors shall ensure SAM information is current. The point of contacts for this acquisition are Sheung Li, Contract Specialist, and can be contacted by email at sheung.c.li.civ@mail.mil. Mary Hightowe, Contracting Officer, and can be contacted by email at mary.l.hightower2.civ@mail.mil

More opportunities from Department Of Defense → W6QM Micc-Ft Stewart

Same awarding agency

NAICS: 562920
New
Federal
Recycling Services
Solicitation # W9124M27QA005
Solicitation W9124M-27-Q-A005 is a firm fixed price request for proposals for recycling services at Fort Stewart and Hunter Army Airfield, Georgia. This acquisition is set aside 100 percent for 8(a) small business concerns under NAICS code 562920. The contractor will be responsible for collecting recyclable materials from containers, processing and preparing materials for resale in local markets, and maintaining government furnished property, including the quarterly cleaning and repair of 25 percent of all containers. The period of performance begins with a one month phase in period from April 1, 2027, to April 30, 2027, followed by a base period and four one year option periods, extending the total performance through March 31, 2032. Award will be granted to the responsible offeror meeting all specifications who provides the lowest evaluated price. Evaluation is based on three factors: technical capability, past performance, and price. To be eligible, offerors must receive an acceptable rating for technical capability, which includes their approach to scheduled and unscheduled events, a 48 hour vehicle replacement strategy, and a verified equipment inventory. Past performance requires three relevant recycling references from the last three years. Offers are due by November 16, 2026, at 1:00 PM EST and must be submitted electronically via the Procurement Integrated Enterprise Environment portal. All offerors must be registered in the System for Award Management database to be eligible for award.
Materials Recovery Facilities

POSTED

6 days ago

DEADLINE

in 27 days
View Details
NAICS: 238330
Federal
IDIQ Flooring
Solicitation # W9124M26BA004
Solicitation W9124M26BA004 is a Firm Fixed Price Indefinite Delivery/Indefinite Quantity (IDIQ) contract issued by the Department of Defense, specifically the W6QM Micc-Ft Stewart. This 8(a) Competitive set-aside under NAICS 238330 is for the removal and installation of various floor coverings, including carpet, resilient flooring, ceramic tile, and special epoxy coatings, at Fort Stewart and Hunter Army Airfield. The project magnitude is estimated between 5 million and 19 million dollars, with a performance period consisting of a base year from November 16, 2026, to November 15, 2027, and four subsequent option years extending through November 15, 2031. Bids will be evaluated solely on price and price-related factors. To be considered responsive, bidders must be active in SAM.gov, provide a bid guarantee of 20 percent of the bid price or 3 million dollars, and submit a properly signed sealed bid package. The contract mandates strict adherence to quality standards, including ASTM and TCNA guidelines, and requires prior approval of samples by the Contracting Officer. Special requirements include the use of the Wide Area WorkFlow system for invoicing, compliance with the Davis-Bacon Act for labor standards, and adherence to ADA and ABA accessibility guidelines. Additionally, the contractor must follow specific hazardous waste protocols for asbestos-containing materials and ensure all materials are delivered and stored in undamaged condition.
Flooring Contractors

POSTED

12 days ago

DEADLINE

in 23 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS