Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Department Of Transportation was posted on June 2, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

INFRA Grants

Closed
NSMFHP-26-INFRAGrant

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
North Hollywood Central Remediation Well Collector Line; IFB No. 8003R1
Solicitation # 8003R1
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North Hollywood Central Remediation Well Collector Line project, an initiative for the City of Los Angeles Department of Water and Power located in California. This comprehensive infrastructure project requires a wide array of specialized services and materials, including site preparation, land surveying, subsurface investigation, and shoring. The scope further extends to complex pipeline and utility work such as tunneling, boring, jacking, micro tunneling, and the installation of cathodic protection and steel casing. Additional requirements include surface work like asphalt paving, landscaping, and the installation of traffic signs, signals, and lighting, as well as the supply of ready mix, precast concrete, and manhole materials. The solicitation is open to qualified Small Business, Women-Owned Small Business, and Disadvantaged Business Enterprise subcontractors and suppliers. To be considered responsive, bidders must hold a valid California Contractor's license and provide acceptable insurance. Furthermore, responsible subcontractors and material contractors are required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. Kiewit also emphasizes the importance of labor harmony and notes its existing collective bargaining agreements with several trade unions. Interested parties must submit their quotes by November 18, 2025, via the Building Connected system.
Kiewit Infrastructure West Co.

POSTED

about 2 hours ago

DEADLINE

in 10 days
NAICS: 237310
New
SLED
Katella Ave & State College Blvd Rehabilitation Project
Solicitation # RCP2025-23565
The Katella Ave and State College Blvd Rehabilitation Project (RCP2025-23565) is a public works initiative by the City of Anaheim with an estimated construction cost of $4,213,400. The scope of work involves the removal and reconstruction of asphalt concrete pavement using rubberized asphalt concrete within the existing right of way on Katella Ave from Auburn Way to Douglass Rd and State College Blvd from Katella Ave to Gene Autry Way. Additional infrastructure improvements include the reconstruction of ADA access ramps, sidewalks, curb and gutter, and the adjustment of utility pull-boxes and traffic detection devices, as well as the installation of signage and pavement markings. The project must be completed within 70 working days from the Notice to Proceed. Contractors must hold a General Engineering (A) license and be registered with the Department of Industrial Relations. A key requirement is compliance with the Community Workforce Agreement, requiring the awarded contractor and all subcontractors to sign a Letter of Assent. Bids are evaluated based on the lowest responsive Total Base Bid Proposal submitted via OpenGov, with a required 10% bid bond. Performance is subject to strict work hour constraints, specifically between 10:00 p.m. and 5:00 a.m. for work affecting Caltrans right-of-way. The contract also mandates adherence to MUTCD standards for traffic control and ANSI/TIA/EIA standards for fiber optic installations.
Public Works

POSTED

about 20 hours ago

DEADLINE

in 5 days
NAICS: 237310
New
SLED
Weatherford Parking Lot Replacement
Solicitation # 405-26R0027374
The Texas Department of Public Safety is soliciting bids for the Weatherford Parking Lot Replacement at the Weatherford Highway Patrol and Driver License Office. This turnkey project involves milling all existing asphalt surfaces to a minimum depth of 2.5 inches, repairing soft areas and potholes with base compaction to 98 percent, and installing new asphalt to a minimum finished depth of 2.5 inches. The scope also includes the removal, painting, and resetting of wheel stops, as well as full restriping of the lot, including fire lanes and handicap markings. All work must be performed by qualified craft persons with at least three years of experience and must comply with state and local codes. Electronic responses are due by November 13, 2026, at 5:00 P.M. CT via email or the DPS Online Bid Room. Bids will be evaluated based on responsiveness and past performance, with the award going to the responsible bidder representing the best value. Required submission volumes include contract forms, an information bid section with key personnel resumes, a subcontracting plan for contracts over 100,000 dollars, and a mandatory pricing schedule. Performance and payment bonds are required for contracts exceeding 100,000 dollars and 25,000 dollars, respectively. The contractor must provide a work phasing plan to ensure safe building access, including off-hours work, and adhere to prevailing wage rates per Texas Government Code Chapter 2258.
Department of Public Safety

POSTED

about 23 hours ago

DEADLINE

in 6 days

AI Contract Overview

Show more

The INFRA Grants program, identified by solicitation number NSMFHP-26-INFRA, is a competitive federal funding opportunity administered by the U.S. Department of Transportation through the Office of the Under Secretary for Policy, offering approximately $626.7 million in surface transportation infrastructure funding for projects of national or regional significance. This total includes $319.8 million from FY 2023 INFRA funds, $106.9 million from FY 2024 INFRA funds, and $200 million from FY 2026 INFRA Commercial Motor Vehicle Parking funds, allocated across two distinct tracks. Track 1 supports broad surface transportation projects focused on improving safety, efficiency, and reliability of freight and passenger movement, while Track 2 is exclusively reserved for commercial motor vehicle parking projects. Applicants must select one track and may submit only one application; multiple submissions will result in only the first being considered. The program is governed by Title 23 of the U.S. Code and operates as a reimbursable grant with funding released only after execution of a grant agreement, incurrence of allowable expenses, and submission of valid reimbursement requests. Pre-award costs are ineligible unless specifically authorized in writing. Projects must comply with the Buy America and Build America, Buy America requirements, the Americans with Disabilities Act, and all applicable federal laws, including the Constitution and Executive Order 14173 regarding DEI initiatives. Applicants must be registered in SAM with a valid UEI and maintain current registration throughout the award period, and those with active federal awards exceeding $10 million must maintain up-to-date integrity and performance data in FAPIS. Applications must be submitted via Grants.gov by the respective deadlines: July 1, 2026 for Track 1 and July 15, 2026 for Track 2, using a prescribed set of documentation including the SF-424, SF-424C, an Excel-based Project Information Form, a five-page Project Description, a five-page Project Budget, funding commitment documentation, a 15-page Outcome Criteria Narrative, a Benefit-Cost Analysis Narrative with supporting Excel calculations, a five-page Project Readiness report, a five-page Project Requirements document, and optional letters of support. Projects must demonstrate independent utility, meet NEPA requirements, and provide a detailed schedule including milestones such as NEPA completion, grant obligation, construction start, and construction end. Large projects exceeding $100 million must satisfy seven

General Info

INFRA Grants provide $626.7M for surface transportation and commercial vehicle parking projects.

Estimated contract value

$5,000,000 to $426,700,000

Place of Performance

Not specified

Set-Aside

NONE

Documents

3
PDF
PDF
XLSX

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Transportation → 69A345 Office Of The Under Secretary For Policy
Contacts1 person available
OfficeUSA

Full Description

Show more

The primary goal of the Nationally Significant Multimodal Freight and Highway Projects (INFRA) program is to fund surface transportation infrastructure projects of national or regional significance that improve the safety, efficiency, and reliability of the movement of people and goods in addition to expanding safe, accessible public parking for commercial motor vehicles.


The Department intends to execute project selections under this Notice of Funding Opportunity (NOFO) utilizing approximately $626.7 million in available funding. Specifically, this total includes:

• $319.8 million in FY 2023 INFRA funds;

• $106.9 million in FY 2024 INFRA funds; and

• $200 million in FY 2026 INFRA Commercial Motor Vehicle Parking funds.

The Department intends to make project selections using the currently available resources identified in this notice, as well as any additional funding that may become available for the program.


Funding is administered through two distinct tracks: Track 1 utilizes FY 2023 and FY 2024 resources to support surface transportation projects of national and regional significance, while Track 2 is a dedicated carve-out of FY 2026 resources specifically for commercial motor vehicle parking projects of national or regional significance. Applicants must clearly identify their chosen track in the Project Information Form, as each track is subject to different selection priorities.


Each applicant may submit only one application. Unrelated project components should not be combined into a single application to meet this limit. If an applicant submits more than one application, only the first will be considered.

More opportunities from Department Of Transportation → 69A345 Office Of The Under Secretary For Policy

Same awarding agency

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS