Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Texas was posted on March 4, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Infrastructure Replacement Package 2

Closed
26-0022State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract pertains to the Infrastructure Replacement Package 2 project, which involves the construction and replacement of water and wastewater infrastructure in various locations including Simon Avenue, Seele Street, Samuels Avenue, Seele Alley, a drainage channel between Braddock Avenue and Hill Avenue, and along the IH 35 Northbound Frontage Road at the FM 725 intersection. The scope of work includes installing approximately 2,200 linear feet of 6-inch to 8-inch water mains and approximately 2,700 linear feet of similarly sized wastewater mains, alongside the removal or abandonment of existing water mains, wastewater manholes, and mains. Additional responsibilities encompass stormwater pollution prevention measures, traffic control, site restoration, and the installation of all necessary appurtenances to ensure project completion. The project will be designed and constructed in compliance with all applicable federal, state, and local accessibility standards, ensuring regulatory adherence throughout. The solicitation for this work was posted on March 4, 2026, with a response deadline of April 1, 2026. The project is managed by the Texas Purchasing office located in New Braunfels, TX, with Jade Cuellar serving as the primary point of contact for inquiries. This solicitation is part of a state-local government effort to upgrade and maintain critical infrastructure efficiently and sustainably.

General Info

Infrastructure Replacement Package 2: water/wastewater mains installation, removal, stormwater control, regulatory compliant.

Documents

3
PDF, High priority: read this first50 pages · specifications
High
PDF, High priority: read this first125 pages · rfp
High
PDF

Read all 3 documents

Every page of every file, in your free workspace.

Read the documents

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • 26350 Lynchburg, VA - CSO 70 Sewer ImprovementsOpen now, due in 12 days
  • Lift Station No. 85 ReplacementOpen now, due in 23 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyTexas → Purchasing
Contacts1 person available
OfficeNew Braunfels, TX, 78130, USA

Interested Companies (4)

AmtekTomball, TX
ArmorockHenderson, Nevada
Cedar Hills Constructioncedar park, TX

See All 4 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
General work description: NBU anticipates the following items will be included in the Project scope of work: (i) construction of approximately 2,200 linear feet ("LF") of 6-inch to 8-inch water main and approximately 2,700 LF of 6-inch to 8-inch wastewater main along Simon Avenue, Seele Street, Samuels Avenue, Seele Alley, along a drainage channel between Braddock Avenue and Hill Avenue, and along the IH 35 Northbound Frontage Road at the FM 725 intersection; (ii) removal or abandonment of existing water mains and existing wastewater manholes and mains; (iii) stormwater pollution prevention; (iv) traffic control; (v) site restoration; and (vi) all other appurtenances necessary to complete the Project. The Project will be designed and constructed so as to meet all applicable federal, state, and local accessibility standards.

More opportunities from Texas → Purchasing

Same awarding agency

Get AI-powered intelligence on the opportunities still open

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS